Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on December 21, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Raystown Dam Hydraulic Mechanical Gate and Bulkhead Replacements

Closed
W912DR23X0YQ6Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 9 hours ago

DEADLINE

in 5 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Huntingdon, PA, 16652, USA

Set-Aside

NONE

Documents

1

Sources Sought Experience Worksheet

DOCX, High priority: read this firstsources-sought
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Jan 3, 2024 to Jan 8, 2024. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist Baltimore
Contacts2 people available
OfficeBALTIMORE, MD, 21201-2526, USA
Office AddressBALTIMORE, MD, 21201-2526, USA

Full Description

Show more
This Sources Sought is not a Request for Proposal, Request for Quote, or Invitation for Bid. There is no commitment by the Government to issue a solicitation, make awards, or pay for respondent's expenditures made in response to this notice. Interested vendors are responsible for monitoring this notice for any subsequent amendments. All submissions become government property and will not be returned. Any solicitation issued as a result of this notice will be in a separate announcement. The purpose of this notice is to survey interest and obtain capability statements from industry. The U.S. Army Corps of Engineers (USACE), Baltimore District is considering a requirement for construction at the Raystown Lake Project for a large scale hydraulic mechanical gate and bulkhead replacement work, complicated crane rigging within a confined tower, concrete demolition and repair at multiple locations with restricted access and challenging placements, including vertical surfaces, sloped slabs, and slippery/wet areas. The acquisition strategy being considered is a Request for Proposal using Federal Acquisition Regulation (FAR) 15 and the Tradeoff source selection process. The anticipated magnitude of construction is between $10,000,000.00 and $25,000,000.00. The small business size standard is $45,500,000.00 for this NAICS. The jobsite is located at the Raystown Lake Dam on the Raystown branch of the Juniata River in Huntingdon County, Pennsylvania. Raystown Dam is located approximately 5 miles south of Huntingdon, PA, and provides flood damage reduction and recreation activities (Raystown Lake) for the surrounding areas. The Raystown Branch of the Juniata River begins along the Allegheny Front in Somerset County and flows 123 miles to the confluence with the Juniata River in Huntingdon, PA. The Juniata River flows 104 miles from west to east where it discharges to the Susquehanna River in Newport, PA. The dam access road (State Route 3045) connects with state route 3043 and then route 22 just south of the Juniata River. Original construction of the Raystown Dam began in the mid-1960s and was operationally completed in 1973. It is owned, operated, and maintained by the U.S. Army Corps of Engineers (USACE), Baltimore District. Primary features of the dam include an earthen embankment; a gated controlled spillway with concrete weir; and a gated tunnel outlet consisting of a control tower and concrete lined tunnel through bedrock. The gated spillway consists of a concrete spillway structure with two tainter gates and a central lower volume warm water outlet gate. PROJECT DESCRIPTION This requirement consists of replacement of the warm water slide gate system within the primary spillway structure of the dam, two bulkheads 170 ft. below the lake water surface, and four tunnel outlet gates within the tunnel outlet structure. Work also entails full reconstruction of joints and concrete repairs within the spillway. The warm water slide gate system operates 40 to 60 times per year, depending on the amount of precipitation and powerhouse operation. It is the primary outlet for regulating reservoir level (aside from the powerhouse activities) and regulates downstream water temperature for fish and wildlife management. A single, hydraulically operated, vertical lift gate, controls the amount of flow by changing the gate's vertical position. This gate is to be replaced. The tunnel gates system consists of 4 hydraulically operated, vertical lift gates that partially regulate the reservoir level. The tunnel gates are located at the base of the tunnel control (intake) tower, which is adjacent to the Raystown Dam primary spillway. The existing tunnel gates system (including hydraulic hoist system, mechanical linkages, controls, lighting, and the HSS gates) is original to the construction of the dam, is at the end of its expected design life, and will undergo full replacement. Flow into the tunnel is currently blocked by two, temporary bulkheads at the upstream end of the tunnel. These bulkheads have been redesigned and will undergo full replacement. Joints within the chute slab of the primary concrete spillway require reconstruction to meet modern criteria. Work entails hydro-demolition of concrete along the joints, placement of waterstops and dowels, placement of shrinkage-compensating concrete, and final sealing of joints. The construction duration is estimated to be 1,095 calendar days. CAPABILITIES STATEMENT Vendors interested in the potential procurement shall submit a brief capabilities statement no longer than ten pages. The capabilities statement shall include the following. 1. Company name, address, point of contact, phone number, e-mail address, CAGE code, and UEI number. 2. Business size in relation to the NAICS, including small business socioeconomic status as applicable (e.g. woman-owned small business, service-disabled veteran-owned small business, etc.). 3. A narrative and completed Experience Worksheet of construction projects performed within the past ten years with experience in the following areas. Describe work performed as a prime or subcontractor, and the capability to meet any areas with no past experience. a. Experience with fabrication and installation of hydraulic steel structures with fracture critical members in accordance with AWS D1.5. (Structural) b. Shop and field welding in order to strengthen hydraulic steel and structures and general steel fabrication with fracture critical members in accordance with American Welding Society (AWS) D1.5. Steel fabricators should possess an American Institute for Steel Construction (AISC) certification in one of the following categories: Major Steel Bridge (CBR), Certified Bridge Fabricator - Intermediate (IBR), Certified Bridge Fabricator - Advanced (ABR) or Certified Hydraulic Fabricator (HYD) along with a fracture critical endorsement. (Structural) c. Experience with replacing gates and bulkheads on flood control structures. (Structural) d. Experience of preparing surfaces with abrasive blasting to a Surface Preparation-5, White Metal Blast Cleaning condition, and painting of hydraulic steel structures with vinyl coatings. (Structural) e. Large-scale precision field machining, to tolerances of 15 mil or lesser, over a length of at least ten feet. (Mechanical) f. Experience installing or modifying hydraulic power units. (Mechanical) g. Experience installing or modifying associated gate control and monitoring systems. (Electrical) h. Successful experience of performing work below water surfaces of up to 200 feet. This includes utilizing dive gear to inspect, repair, remove, or install equipment and structures. (Structural) i. Experience using Hydro demolition per ICRI Guideline 03737 & ACI 546R. j. Experience using specialty concrete materials to perform repairs in challenging placement conditions with difficult access (pumping, work on slippery/sloping surfaces). Experience with joint reconstruction, particularly on hydraulic structures. Experience with placement of critical PVC waterstops to include factory and field welding of splices. 4. Describe any large or small business subcontracting possibilities. 5. If any, feedback on the acquisition strategy and if another strategy should be considered (such as Invitation for Bid or Request For Proposal using the Lowest Price Technically Acceptable source selection process). Email capabilities statement to Rosemarie Rollins, Contract Specialist at contact@example.gov and Ryan Fernandez, Contracting Officer at contact@example.gov no later than 11:00 AM Eastern Standard Time, January 8, 2024; reference Sources Sought number W912DR23X0YQ6. Submissions will be shared with the Government project delivery team, but otherwise will be held in strict confidence. No feedback or evaluations will be provided to respondents regarding their submissions. If you have any questions, contact Rosemarie Rollins by email.

More opportunities from Department Of Defense → W2SD Endist Baltimore

Same awarding agency

NAICS: 237990
New
Federal
Mid-Bay James Island Restoration Phase 2
Solicitation # W912DR27BA001
The Mid-Bay James Island Restoration Phase 2 is a firm fixed price construction project managed by the U.S. Army Corps of Engineers, Baltimore District. Located in Dorchester County, Maryland, this ecosystem restoration effort takes place in a remote area of the middle Chesapeake Bay accessible only by boat. The project has an estimated magnitude of construction between 150 million and 250 million dollars, with an anticipated period of performance of 1095 calendar days from the date of the Notice to Proceed. The scope of work involves three primary features: the installation of approximately 22,000 linear feet of perimeter dikes using stone, geotextile, and sand; the excavation and stockpiling of approximately 650,000 cubic yards of sand from a local borrow area; and the installation of spillway structures for controlled water release. Key material requirements include various weights of armor stone ranging from 450 to 3300 pounds. The contractor is responsible for all labor, equipment, and transportation, and must maintain a Quality Control Manager on-site at all times. Administrative requirements include the submission of bids via the Procurement Integrated Enterprise Environment portal in searchable PDF format. Award evaluations include a 10 percent price preference for HUBZone small business concerns. The contract mandates strict adherence to safety and environmental regulations, including EPA 40 CFR 112 for POL products and EM 385-1-1 for safety and health. Additionally, the contractor must conduct formal partnering sessions within 35 to 45 days of the award and provide necessary performance and payment bonds.
Other Heavy and Civil Engineering Construction

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS