Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on August 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Re-Roofing And Store Front Replacement At Miami Dade Fire Rescue Hazmat Warehouse

Closed
MCC 7360 RPQ No. MDFRD-858-HAZ-RState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
SLED
47971 CONSTRUCTION
Solicitation # 47971 - C
Solicitation 47971-C is a construction project issued by the New York State OGS Design and Construction for the replacement of the roof and associated mechanical systems at the Troop F Headquarters in Middletown, New York. The scope of work encompasses comprehensive architectural, electrical, and structural modifications, including the removal of specific skylights and roof framing, the application of various waterproof and general surface finishes, and abatement work related to the first-floor reflected ceiling plan. Electrical requirements include the installation of keyed systems, the relocation of equipment for HVAC engineers, and the installation of permanent conductive fiber optic cables. The contractor is responsible for providing all necessary tools, equipment, and materials, as well as procuring all permits required for the final certificate of occupancy. All work must adhere to applicable building codes, local safety and zone differential regulations, and manufacturer recommendations. Key deliverables include the final inspection of roof trusses, sheathing, tiles, gutters, downspouts, and storm drainage systems, with final acceptance of the fastening system requiring written approval from the Owner and Architect. The solicitation was posted on October 16, 2026, with a response deadline of November 18, 2026.
NYS OGS Design & Construction - Construction Contractors

POSTED

about 2 hours ago

DEADLINE

in 20 days
NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 3 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This contract involves the comprehensive removal and replacement of approximately 21,000 square feet of built-up roofing at the Miami Dade Fire Rescue Hazmat Warehouse, including all associated debris removal and disposal. The contractor is responsible for conducting all necessary field measurements, verifying deck slopes, and ensuring the new roofing system provides positive drainage to prevent water accumulation. The scope specifies installing a new EverGaurd Extreme TPO 60 mil roofing system, meeting UL Class A Fire Rating, with reflective coating to comply with Miami Dade County's Cool Roof resolution. The project also includes replacing store front elements, re-installing roof drains and strainer covers, and installing new stainless steel counter flashing, edge flashing, gutters, and downspouts as needed. The contractor must adhere to specific manufacturer specifications, obtain approval for shop drawings, and meet all permit and inspection requirements with the Authority Having Jurisdiction. Bidders must be pre-approved by the roofing manufacturer, demonstrate relevant experience through prior installations, and submit necessary qualification documentation. The project is set to be awarded through a solicitation process with a response deadline of September 4, 2025, and a pre-bid meeting scheduled for August 13, 2025.

General Info

Documents

1

FR_ITB_RPQ_MDFRD-858-HAZ-R.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Miami Dade County Strategic Procurement
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Kristina L. PeartContracting Officer

Full Description

Show more
SCOPE: 1. Remove and replace approximately 21,000 square feet of built-up roofing. 2. Contractor is responsible for any and all field measurements required to perform the Scope of Work (SOW) herein attached. 3. Contractor will make reference to the asbestos report dated October 20, 2023 (Project #: Project # 20-21102) as part of this SOW and ultimately a condition of the contract with MDFR and permit with the Authority Having Jurisdiction (AHJ). 4. The Contractor is responsible for all cost associated in the performance of the SOW; to include but not limited to labor, materials, equipment, transportation, permitting, insurances, and related engineering required to complete the work and obtain a final inspection with the Authority Having Jurisdiction (AHJ). No provision will be made for price escalation. 5. Contractor to verify slope of deck before tear off of existing roof. Contractor will ensure that new system applied will provide positive drainage to floor drains, thru-the-walls and/or over-flows. 6. Contractor to remove and properly dispose of the existing roofing system and any debris produced in the completion of this contract. 7. Contractor to install new EverGaurd Extreme TPO 60 mil roofing system (see attachment 1) and replace store front (see attachment 2). DESCRIPTION OF ROOFING SYSTEM 1. Remove and properly dispose of the existing roofing system. Prepare the roof deck to receive new insulation (if required) and roof covering. 2. Install insulation as required. Roofing system installed will be in an effort to achieve an R-6 value and a slope of no less the ¼"pr 1’ slope throughout the flat roof area. a. Install new EverGaurd Extreme TPO 60 mil White roofing system by GAF, or approved equal (see attachment 1). b. Energy-efficient, Cool Roof cap sheet or reflective coating will be applied to meet Miami Dade County resolution R-54-18 “Cool Roof.” 3. Acceptable alternatives include Polyglass, Johns Manville and Soprema. Follow manufacturer specification, attached, for cleaning, product attachment application and guarantee/warranty requirements. 4. Roof assembly shall meet UL Class A Fire Rating. 5. New roof drains and strainer cover to be reinstalled after the re-roofing. 6. Remove existing and install new counter flashing at the wall supported decks and roof edges. 7. All counter flashing and edge flashing will be stainless steel. 8. Remove, dispose of and install new gutters and downspouts as needed. DESCRIPTION OF STORE FRONT 1. See Notes and General Notes on attachment 2. 2. Contractor will provide shop drawings for approval before manufacturing. BIDDERS QUALIFICATIONS: a. Bidding contractor is to be pre-approved by the roofing manufacture to install the specified 30-year warranted roofing assembly. Acceptable manufacturers as described above in Section C of this RPQ. b. Bidders must submit a signed letter on the roofing products' manufacturers letterhead with sealed bid submission, stating the applicator/contractor is capable of purchasing material, providing installation as an approved installer, and providing the required warranty at project completion and acceptance. Acceptable manufacturers as described above in Section C of this RPQ. c. Bidders must complete the attached Bidder's Qualifications form and submit a minimum of three (3) satisfactory roofing installations performed by the applicator using the materials and method similar to those specified with bid submission. MANDATORY PRE-BID MEETING / SITE VISIT: Pre-bid meeting has been scheduled for Wednesday, August 13, 2025, at 10 a.m. at Miami Dade Fire Rescue Hazmat Warehouse located at 8010 NW 60 Street, Doral FL 33166. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS