Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on August 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ready-Mix Concrete Supply

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of Stockton is seeking a subcontractor for the supply of ready-mix concrete to be used specifically in the construction of ADA curb ramps. All provided materials must strictly adhere to the specifications set forth by either Caltrans or the City of Stockton to ensure compliance and accessibility standards. This subcontract opportunity is based in Stockton, California, within the 95206 zip code. Interested parties must submit their responses by the deadline of August 19, 2026. The project falls under NAICS code 327320, focusing on the specialized production of ready-mix concrete.

General Info

Stockton seeks ready-mix concrete subcontractors for ADA curb ramps by August 19, 2026.

Place of Performance

Stockton, CA, 95206, USA

Set-Aside

NONE

Documents

This scope was carved out of WD25004.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Ada Curb Ramp Installation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Stockton
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of Stockton
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply ready-mix concrete meeting Caltrans or City of Stockton specifications for use in ADA curb ramp construction.

More opportunities from California → City of Stockton

Same awarding agency

NAICS: 237310
SLED
Sidewalk, Curb, And Gutter Repairs Program Fiscal Year 2023-24 SB1
Solicitation # WD24004
The City of Stockton Public Works Department is soliciting bids for the Sidewalk, Curb, and Gutter Repairs Program Fiscal Year 2023-24 SB1, project number WD24004. This project involves the removal and replacement of concrete infrastructure damaged by city tree roots at approximately 90 locations throughout Stockton, California. The scope of work includes saw cutting, removal and disposal of debris, tree root cutting, and the installation of 6-inch thick concrete sidewalks with a 4-inch compacted aggregate base, rolled curbs, gutters, and driveway aprons up to 8 inches thick. Additional tasks include replacing AC pavement, grading, repairing irrigation systems, adjusting catch basin elevations, and re-installing survey monuments. The project requires strict adherence to ADA compliance, Buy America requirements, and a 95 percent relative compaction standard for AC overlay and sidewalk areas. The contract will be awarded to the lowest responsive and responsible bidder, with an engineer's estimate below 1,315,000 dollars. Bidders must submit their proposals using official City of Stockton forms by October 29, 2026, at 2:00 p.m. Required submission documents include a list of subcontractors, a non-collusion declaration, DIR self-certification, and various local ordinance and workforce training certifications. The successful contractor must provide labor and material bonds and a faithful performance bond, each for 100 percent of the contract price. Performance must commence within 10 days of the Notice to Proceed, with a total completion timeline of 70 working days, and a specific requirement that AC paving and cleanup at each location be finished within five working days. Quality assurance is managed through the City's program, requiring the contractor to employ a certified independent laboratory for material and compaction testing.
Highway, Street, and Bridge Construction

POSTED

11 days ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS