Recirculation of Tidewater Crossing Master Development Plan Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The California Department of Fish and Wildlife has extended Streambed Alteration Agreement EPIMS Notification Number SJN-16920-R2 to Matt Arnaiz, authorizing the construction of a sewer pipeline beneath French Camp Slough using a jack-and-bore method. The extension revises the project term from July 2, 2026, to September 2, 2030, aligning with the timeline for implementation of the Tidewater Crossing Master Development Plan Project in San Joaquin County, California. The work is conducted under Permit No. 19780 and must comply with Fish and Game Code Section 1602, California Code of Regulations Title 23, Article 3, Section 6, and the California Environmental Quality Act (CEQA), which mandated preparation of an Environmental Impact Report and adoption of mitigation measures as conditions of approval. The project site is located at French Camp Slough near South Airport Way, with coordinates 37.881712°N, -121.249570°W, approximately half a mile downstream from the intersection. The City of Stockton is the lead agency, supported by the Central Valley Flood Protection Board and CDFW as responsible regulatory entities. No formal contract clauses, pricing details, or procurement evaluations are included in the documentation, as the instruments involved are environmental permits and agreements rather than traditional acquisition contracts. Key personnel include Jenny Liaw and Anson Lihosit from the City of Stockton, Hailey Donaldson from CDFW, and Jordan Robbins from the Central Valley Flood Protection Board, though none are formally designated as contracting officers or representatives. Performance is contingent upon compliance with environmental mitigation requirements, and no specific invoicing, payment, or accounting data is provided. The project involves installation of a sewer pipeline, two 16-inch force mains, a storm drain outfall with Armorflex matting, and erosion control measures, all subject to inspection and acceptance by the regulatory agencies. No contract value, CLINs, or socioeconomic certifications are referenced, and no formal representations, certifications, or packaging instructions are included in the materials.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
