Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Recirculation of Tidewater Crossing Master Development Plan Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Stockton

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

Notice of Determination for French Camp Slough Sewer Pipeline Bore and Jack Undercrossing

PDFnotice-of-determination

Notice of Determination for Permit No. 19780 Tidewater Crossing Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Stockton
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Stockton
Office AddressN/A
Contacts
Jordan RobbinsSenior Environmental Scientist (Specialist)
Anson LihositSenior Planner

Full Description

Show more
Approval of Permit No. 19780, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To construct a storm drain outfall structure along the waterside of the left (southwest) bank levee of French Camp Slough to discharge treated storm water from a proposed landside detention basin via a pump station and two (2) 16-inch diameter force mains. Armorflex matting to be installed below the outfall and extend into the channel for erosion protection. A temporary sheet pile coffer dam will be utilized for the outfall construction.

Similar Contracts

NAICS: 237990
New
SLED
Deaerator (DA) and Condensate System UpgradesThe Port of Seattle’s Aviation Project Management Group is forecasting a contract to replace the Deaerator and Condensate tanks within the Central Mechanical Plant, aiming to enhance system reliability and operational efficiency. The work falls under NAICS code 237990, indicating it involves other heavy and civil engineering construction, and is expected to require specialized expertise in mechanical systems integration, boiler plant infrastructure, and industrial tank installation. The project will involve the removal of existing equipment, installation of new units compliant with current safety and performance standards, and potential modifications to connected piping, controls, and support systems to ensure seamless operation. Leila Gonzalez-Rigatto serves as the primary point of contact for inquiries, with Matthew Piccolo designated as the Project Manager. While the solicitation has not yet been issued and no set-aside details or deadlines are provided, interested parties should monitor the official portal for future updates. The work is to be performed at the Port of Seattle’s Central Mechanical Plant with no specific location details outlined, suggesting the site is centrally managed within the port’s infrastructure. Timing of the procurement is expected to align with planned maintenance cycles or capital improvement schedules in the coming fiscal period.
Aviation Project Management Group

POSTED

about 1 hour ago

DEADLINE

N/A
View Details