Reclamation District 2062 Paradise Cut Pipe Replacement Project (Notification of Lake or Streambed Alteration, No. EPIMS-SJN-48012-R3)

Forecast
EPIMS-SJN-48012-R3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS-SJN-48012-R3 for the Reclamation District 2062 Paradise Cut Pipe Replacement Project. Located on the Stewart Tract in San Joaquin County, the project consists of the in-kind replacement of a 24-inch diameter stormwater discharge pipe. The existing pipe will be removed and replaced with a new steel pipe of the same diameter to ensure the continued discharge of stormwater into Paradise Cut. This project is classified as a special notice and is granted a categorical exemption under California Code of Regulations title 14, section 15302, because the replacement maintains the same purpose and capacity on the same site. The work is overseen by the Bay Delta Region of the California Department of Fish and Wildlife, with Andrea Boertien serving as the primary environmental scientist contact. The project site is specifically identified by Assessor Parcel Number 210-040-010 and is located within the Lathrop Quadrangle.

General Info

CDFW agreement for in-kind replacement of stormwater discharge pipe in San Joaquin County.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

Place of Performance

CA

Set-Aside

exempt

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SJN-48012-R3, pursuant to Section 1602 of the Fish and Game Code to Reclamation District 2062. The project is limited to in-kind replacement of a stormwater discharge pipe located adjacent to Paradise Cut on Stewart Tract. The 24-inch diameter discharge pipe will be removed and replaced with a new, steel 24-inch diameter discharge pipe to facilitate continued discharge of stormwater into Paradise Cut.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 4 hours ago

DEADLINE

in 1 day
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS