Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Montana was posted on July 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Reconstruction of Highway 91 Curved Segment South of Dillon

Closed
01825State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423450
New
SLED
Body Composition Analyzer Scales
Solicitation # SHR127-ADMSR-6566
Solicitation SHR127-ADMSR-6566 is an Invitation to Bid issued by the San Bernardino County Sheriff/Coroner/Public Administrator for the procurement of body composition analyzer scales and handheld grip strength dynamometers. The procurement is structured as a price-based bid aimed at obtaining the best price, with a response deadline of November 13, 2026. Bids must be submitted electronically via the ePro portal and must be in full conformance with all specified terms and conditions. A five percent local preference is applied to vendors with a physical address within San Bernardino County, which may be used to adjust costs for comparison or add points in a best-value evaluation. The contractor is responsible for delivering the equipment to designated locations, ensuring all packaging conforms to the Fair Packaging and Labeling Act and California Business and Professions Code section 12604. Each shipment must include a detailed delivery confirmation or bill of lading. The contract includes standard clauses regarding termination for default, indemnity, and patent licenses, and requires bidders to certify their registration in the System for Award Management (SAM) and good standing with the California Secretary of State. Administration of the contract is managed by the Sheriff's Administrative Manager for Contracts and Procurement, who serves as the Contracting Officer's Representative.
Administrative Services

POSTED

about 21 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The contract involves the reconstruction of approximately 0.4 miles of State Highway 91 (S-222) south of Dillon in Beaverhead County, Montana, from RP 2.332 to RP 2.735. The project aims to enhance safety and traffic flow by constructing a larger radius horizontal curve, widening shoulders to 8 feet on the left and 4 feet on the right, and installing rumble strips along the roadway. The work is part of a solicitation issued by the Montana Department of Transportation, with a response deadline of August 7, 2025. The project is estimated to cost between 1.5 million and 3 million dollars and is open to qualified contractors under the NAICS code 423450. The contract emphasizes infrastructure improvements to improve driving conditions on this section of Highway 91, contributing to safer transportation in the region.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMontana Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The SF 179 Curve S of Dillon project involves reconstruction of approximately 0.4-miles of State Highway 91 (S-222) South of Dillon in Beaverhead County from RP 2.332 to RP 2.735. The reconstruction will include a larger radius horizontal curve with an 8-foot shoulder on the left side of the road, a 4-foot shoulder on the right side of the road, and the addition of rumble strips.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS