This Pre-Solicitation opportunity was posted on April 7, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY ACT-INGRESS AND EGRESS UPGRADES, SOUTH TABLE MTN. CAMPUS, NREL

Closed
RGH-0-40752Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262 and associated buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring, implementing new electrical distribution with simple dimming controls, replacing ceiling fans, and upgrading HVAC variable air volume systems and lighting controls. The project also requires the installation of new signage and safety stair treads in all stairwells. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeframe of 425 calendar days after the Notice to Proceed. Award will be determined using the best suited negotiate methodology, evaluating price alongside corporate relevant experience and past performance. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict quality control and safety plans. All work must comply with ADA accessibility guidelines and prevailing wage rates for the Georgia region. Proposals must be submitted electronically to the Contracting Officer by November 9, 2026, with price and technical information provided in separate files.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 16 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, and compressed air systems. Additionally, the work includes a full NFPA-compliant fire suppression system, electrical distribution and lighting upgrades, building automation controls, and site improvements such as paving, drainage, and hazardous materials abatement. The project is divided into two primary pricing line items: building renovation and the removal and replacement of paving. The contract has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price, with evaluations considering Buy American Act compliance. Bidders must adhere to strict bonding requirements based on proposal value, including bid, payment, and performance bonds for projects exceeding 150 thousand dollars. Quality control will be managed through a three-phase system, and all work must comply with ADA accessibility guidelines and specific military standards for piping and materials. Invoicing is to be processed via Wide Area Work Flow using NAVFAC forms, and the project requires coordination through a Team-Led Partnering Session.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation for DBE subcontractors managed by RT Contractor Corp for the Inland Empire Utilities Agency in California. The project focuses on basin improvements within the Riverside or Los Angeles project areas. The solicitation was posted on October 24, 2026, with a response deadline of November 4, 2026. This opportunity is specifically set aside for Disadvantaged Business Enterprises as defined by the Department of Transportation, falling under NAICS code 236220. To ensure project financing and bid responsiveness, contractors must strictly adhere to six Good Faith Effort requirements. Most critically, proof of public solicitation postings for at least 30 consecutive calendar days online and one day in a print newspaper, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency, must be submitted with the bid package. Failure to provide these specific documents will result in the bid being deemed non-responsive. Documentation regarding outreach efforts may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, along with an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofing, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Bids are requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with NFPA-101 Life Safety Code, ADA, OSHA, and EPA regulations, as well as local Massachusetts building codes. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. Award will be based on best value, with evaluation weights assigned to price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for completion, a 90-day bid guarantee, a W9, a vendor questionnaire, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act, requiring a minimum wage of 13.65 per hour and specific paid sick leave accruals. Contractors must provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30, and final payment is contingent upon the submission of certified payroll records, a completed SF 1413, and the release of liens from all subcontractors and suppliers. The project includes a one-year guarantee of workmanship and a 20-year manufacturer product warranty for LVP flooring.
Grafton Job Corps

POSTED

about 6 hours ago

DEADLINE

in 23 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition requirements include the removal of 18 existing magazines and buildings 524 and 393. Technical requirements encompass a wide range of trades, including structural steel, concrete with rigid inclusions and load transfer mats, roofing, electrical utilities, and specialized systems like intrusion detection and lightning protection. The project also requires the installation of overhead cranes, primary and secondary electrical distribution, and various paving and landscaping improvements. This opportunity is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. Interested parties must contact the primary point of contact by the response deadline of October 31, 2026, to receive bid invitations and documents.
J & J Contractors, Inc

POSTED

about 6 hours ago

DEADLINE

in 6 days

General Info

Agency

N/A

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

National Renewable Energy Laboratory (NREL) South Table Mountain Campus, GOLDEN, CO, 80401, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Notice updated

Response deadline time changed from 11:00 PM UTC to 9:00 PM UTC on Apr 22, 2010. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Steven A. McCormickSr. Subcontract Administrator
Karen LeitnerSr. Contract Administrator

Full Description

Show more
Project Notice This project will be funded by the American Recovery and Reinvestment Act (ARRA), and will be subject to additional reporting requirements and additional Buy American Act requirements applicable to ARRA funded projects. The National Renewable Energy Laboratory (Alliance/NREL) intends to solicit competitive proposals from prequalified sources for a fixed price with award fee design-build subcontract for the design and construction of a multi-level parking structure and security facility, together with related infrastructure improvements, collectively referred to as Ingress and Egress Upgrades. The proposed work is located at the NREL South Table Mountain (STM) campus in Golden, Colorado. The Alliance for Sustainable Energy, LLC (Alliance) has entered into Contract No. DE-AC36-08-GO28308 with the Department of Energy (DOE), an agency of the U.S. Government, for the management and operation of the National Renewable Energy Laboratory (NREL). NREL is the only federal laboratory dedicated to the research, development, commercialization and deployment of renewable energy and energy efficiency technologies. It is intended that construction and substantial completion will be no later than December, 2011. The firm fixed price for the design-build effort will be negotiated prior to subcontract award and is currently estimated to be within a range of $28,000,000 to $31,000,000. (This range does not include Award Fee). General Description of Work The South Table Mountain Ingress & Egress Upgrades project is required to provide parking for a minimum of 1,500 vehicles with the potential to provide parking for up to 1,800 vehicles. Also included in the project is the design and construction of up to 4,000 lineal feet of South Table Mountain campus roadways and the relocation and expansion of the campus utilities (water, natural gas, sewers, electric, telecom/data, etc). The project will include a security entrance post with systems and hardware for campus access and security. Consistent with its mission, NREL seeks to deliver projects that lead the industry in terms of sustainability and energy performance. In support of the Department of Energy's goal to demonstrate energy efficient buildings with a lower impact on the environment, NREL has mandated that all new, habitable buildings constructed on the STM campus be designed to merit at a minimum, a LEED Gold rating from the U.S. Green Building Council. (Note - Since the effort is design-build, it has not yet been determined which of the structures included in the project may be considered to be habitable.) Acquisition Process NREL has selected a two-phase performance-based design-build selection process. The first phase has been identified as the qualification phase. Interested firms/teams are requested to submit Qualifications Statements. Qualifications Statements must meet the minimum qualifications identified in the Submission Requirements of this notice in order to be considered for the Short List. An NREL source selection team will review submitted Qualification Statements and determine which meet the minimum requirements, and of those Qualification Statements that meet the minimum requirements, establish a Short List of firms/teams evaluated to be most technically qualified to perform the project successfully. NREL will issue a Request for Proposal (RFP) only to those firms/teams who are short listed for the project. The RFP will solicit a comprehensive proposal inclusive of a schedule/price/technical proposal and other pertinent information from the short listed firms/teams. Oral presentations are planned and possible site visits may be required as part of the solicitation. A single firm/team will be selected for award based on a best value evaluation of proposals received in response to the RFP. Submission Requirements Qualification Statements are to be submitted to the NREL Point of Contact as identified below. 1.1. Formatting 1.1.1. Submit ten (10) copies of the Qualifications Statement . 1.1.2. Materials larger than 8-1/2 x 11 inches will not be accepted. 1.1.3. Responses shall not exceed 25 pages (including attachments). All requested information is to be contained within the 25 page limit, with the following exceptions: a.) Cover Letter; b.) OSHA 300 Logs; and, c.) Evidence of Authority to Conduct Business in the State Where Work is to be Performed (if required). 1.1.4. A page is defined as one side of an 8-1/2 x 11 inch sheet of paper. 1.1.5. Copies may be either single or double sided 1.1.6. Maintain at least 1-inch margins on all sides 1.1.7. A 12-point font should be used. 1.1.8. Submissions shall employ minimal binding techniques to reduce resource use as well as shipping costs. 1.1.9. Faxed or email submissions will not be accepted. 1.2. Cover letter 1.2.1. Provide a cover letter (not included in the 25 page limit) identifying the principal contact person for the Offeror providing the name, title, street address, email, telephone, and fax numbers. The acknowledgement of receipt of all amendments and/or addendums shall be made on the cover letter. 1.2.2. Qualifications by partnerships must be executed in the partnership name and signed by a partner, whose title must appear under the signature. The official address of the partnerships must be shown on the cover letter. 1.2.3. Qualifications by corporations must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or an assistant to the secretary. The corporate address and state of incorporation must be shown on the cover letter. 1.2.4. If the Offeror is an out-of-state corporation, evidence of authority to conduct business in the state where the work is to be performed must be attached to the Qualification Statement (not included in 25 page limit). 1.3. Executive Summary 1.3.1. Provide a summary identifying the highlights of the submitted materials. 1.4. Qualifications - The Qualification Statement submittals are identified below. Qualifications shall include the following submissions, organized by tabbed sections detailing the following: 1.4.1 Tab A- Minimum Requirements (go/no go) 1.4.1.1 Submission Requirements: 1.4.1.1.1 Bonding Capacity: The offeror shall submit a letter from their surety indicating their individual project capacity as well as their total bonding capacity, with sufficient capacity to accommodate the proposed project. The bonding letter must be from a Treasury listed surety. 1.4.1.1.2 Insurability: The offeror shall submit a letter from their insurer indicating their ability to meet, as a minimum the NREL insurance requirements as indicated in Appendix B-10, - Standard Terms and Conditions for Firm Fixed-Price Subcontracts for Design/Build available at http://www.nrel.gov/business_opportunities/related_docs.html 1.4.1.1.3 Professional Licenses: Licensure of all design professionals in the State of Colorado. At a minimum, identify name and license number of Professional Engineer-Civil and Professional Engineer-Structural. 1.4.1.1.4 Safety: Experience Modification Rate (EMR) of 0.99 or below. 1.4.1.1.4.1 Provide a letter from insurance carrier showing the EMR for last 3 years. 1.4.1.1.4.2 Provide OSHA 300 logs for last 3 years. 1.4.1.2 Evaluation Metric: Submissions that do not contain the minimum requirements as outlined above will not qualify to be short listed and will not receive further consideration. 1.4.2 Tab B- Project Team (50 points) Provide a description of the project team and identify the qualifications of the project team members in key positions. NREL values design, construction, management and implementation as key skills to assure project success. Technical skills include a demonstrated ability to design and construct multi-level parking structures, management and optimization of vehicular and pedestrian flow and circulation, access control for vehicles and pedestrians, incorporation of sustainable building and site features, and safety from a design and security standpoint. Management and communication skills demonstrate how the technical ability of the team integrates with the NREL team to advance the project expectations and achieve project success. 1.4.2.1 Submission Requirements: 1.4.2.1.1 Project Team: Provide a one page organizational chart of key personnel dedicated to this project. Identify the firm of each individual on the organizational chart. All major member firms of the design/build team shall be shown. 1.4.2.1.2 Key Personnel: Provide a one page resume of key personnel assigned to the Project Team with descriptions of their specific role and responsibility. 1.4.2.1.3 Narrative: Provide a narrative outlining the intended effectiveness of the proposed team. Highlight specific project examples of how your Project Team has worked successfully as a part of an integrated team. 1.4.2.2 Evaluation Metric: 1.4.2.2.1 Evaluation on the ability of the proposed team and team members to provide the targeted range of technical, management, and implementation skills to plan, manage, design, and construct the project. 1.4.2.2.2 Scoring will be earned based on the extent to which the Project Team has demonstrated successful integration on other, similar, recently completed projects with preference given to design-build team experience. 1.4.2.2.3 References may be contacted to confirm an individual's role in a specific project. 1.4.3 Tab C- Project Team Experience: (75 points) Provide a description of the Project Team's relevant experience and references from no more than five (5) similar projects that your team has recently completed. Identify the Project Team members (cross reference with Tab B) that contributed to each project and what role they filled on each project. Identify components of the similar projects as it relates to the following sub factors: 1.4.3.1 Submission Requirements: 1.4.3.1.1 Attributes: Provide metrics for each project including size, schedule, budget, and delivery method. Describe the project attributes and how those attributes compare to this project. 1.4.3.1.2 Performance: Describe the project expectations and how project success was measured. Submit performance history in meeting deadlines, submitting accurate estimates, producing high quality work, meeting safety goals, and meeting financial obligations. 1.4.3.1.3 Reference: Provide the name and contact information (e-mail and phone number) of the principle Owner's representative who is knowledgeable of the outcome of each project. The reference may be contacted to verify the project information submitted. 1.4.3.1.4 Page Limit: one (1) page per project. 1.4.3.2 Evaluation Metric: 1.4.3.2.1 Evaluation for proven ability to successfully complete a project of the size and type outlined with preference given to firm fixed price design-build experience. 1.4.3.2.2 References may be asked about performance of key personnel. 1.4.4 Tab D- Project Management: (50 points) Describe the proven management plan proposed to guide the integrated project team throughout the delivery of this project. The project risk analysis aligns project risks with the project goals and subjectively rates the probability and impact for each risk/goal combination. Consistent with the risk analysis, identify the design build team's management plan to address the following: 1.4.4.1 Submission Requirements: 1.4.4.1.1 NREL Energy and Sustainability Goals: NREL by mission strives to lead the industry in terms of energy efficiency and sustainability. The building elements of the project must achieve a world-class level of performance relative to energy use and sustainability. 1.4.4.1.2 Communication: Management approach for communication between members and resources of the Project Team, plus the management approach to integrate your Project Team members with members of the Owner's Integrated Project Team (IPT). 1.4.4.1.3 Security & Safety: As this project's scope requires a - campus primary entry point (immediately adjacent to neighboring property): provide a management approach to assure - master planning sensitivity relative to neighboring property owners. Provide a minimum of 5 references from within the last 5 years from previous clients demonstrating the integration of safe design, construction and operation and further demonstrate how safety and compliance issues were better than industry standards. 1.4.4.1.4 Combining Aesthetics & Function: Demonstrate a proven ability to identify aesthetic context for the design and construction of functional building(s) that enhance the campus aesthetic while addressing (typical) adjacent property owner issues and concerns. 1.4.4.2 Evaluation Metric: 1.4.4.2.1 Evaluation will be based on the soundness of the plan and its ability to address the risk identified. Summary All examples shall be projects completed within the last 5 years and of similar scope and complexity. Actual Project Team member's experiences on these projects shall be highlighted. This solicitation is open for participation by large and small businesses. This solicitation does not commit NREL to pay for costs incurred in the preparation and submission of a Qualification Statement in response to this notice. Questions regarding this Notice must be in written form, and mailed or emailed to the point of contact so as to be received not later than April 12, 2010. Responses to this notice must be sent to the Point of Contact no later than 4:00 pm Mountain Time, April 22, 2010. Point of Contact National Renewable Energy Laboratory Steven McCormick, Sr. Subcontract Administrator 1617 Cole Blvd, MS 1533 Golden, CO 80401 Phone 303-275-3764, Fax 303-275-3109, E-mail steven.mccormick@nrel.gov

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS