Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

RECOVERY--C--Project Number 410, Apalachicola, Chattahoochee and Flint River, GA, AL & FL

Active
W91278-09-199-ARRAFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves a firm-fixed price in-scope modification to an existing Architect-Engineer (A/E) Indefinite Delivery Indefinite Quantity (IDIQ) contract (W91278-09-D-0040, Task Order 0002) awarded to Tetra-Tech, Inc. The work pertains to a Recovery Act-approved project focused on reopening the scoping process for the Environmental Impact Statement related to the Apalachicola-Chattahoochee-Flint Master Water Control Manual in Mobile, Alabama. This contract modification is specifically available only to the incumbent contractor under the current contract number and is carried out under the regulatory framework of FAR Part 36. The project is managed by the U.S. Army Corps of Engineers, Mobile District, with Donna Parker serving as the Contracting Officer. The contract supports environmental planning and engineering services under NAICS code 541330, reflecting professional architectural and engineering services. The project aims to address water resource management across the Apalachicola, Chattahoochee, and Flint rivers spanning Georgia, Alabama, and Florida, enhancing federal oversight and coordination under the Recovery Act’s infrastructure initiatives.

General Info

Firm-fixed price modification for environmental scoping on water management under A/E IDIQ contract.

NAICS

541330 - Engineering Services

Place of Performance

AL

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Mobile
ContactsNo contacts available
OfficeMOBILE, AL, 36602-3630, USA
Office AddressMOBILE, AL, 36602-3630, USA
ContactsNo contact information available

Full Description

Show more
RECOVERY--PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR UNDER THE CURRENT CONTRACT NUMBER: W91278-09-D-0040, Task order 0002 Tetra-Tech, Inc., Fairfax, VA. The Corps of Engineers intends to issue a firm-fixed price in-scope modification to W91278-09-D-0040, Task Order 0002. The contract is an Architect-Engineer (A/E)IDIQ contract, which was previously competed and awarded in accordance with FAR Part 36. PROJECT DESCRIPTION: Recovery Act approved Project to reopen scoping for the Environmental Impact Statement for the Apalachicola-Chattahoochee-Flint Master Water Control Manual in Mobile, AL. POC: Donna Parker, Contracting Officer, Mobile District, U.S. Army Corps of Engineers, P.O. Box 2288, Mobile, AL, 36628-0001

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Road Asset Management
Solicitation # FY27-ENGCP-002-6
The Bulloch County Board of Commissioners is soliciting Statements of Qualifications for project FY27-ENGCP-002-6, focused on Road Asset Management. The selected consultant will be responsible for collecting and analyzing field data, creating a road asset inventory, and developing a Capital Improvement Plan with an outlook extending to FY 35. The scope includes GIS database development, web-based mapping, and the identification of structural hazards and drainage failures to minimize safety risks and legal liability. All prime and sub-consultants must be GDOT Prequalified Contractors as of the submission deadline on November 20, 2026, at 3:00 PM EDT. Proposals are evaluated based on a composite scoring system that weights prime consultant experience and technical approach at 20% each, GIS capabilities at 20%, asset prioritization methodology at 15%, workload capacity at 15%, and past references at 10%. The highest-ranked consultant will be invited to negotiate a contract. Key requirements include a Principal-in-Charge with at least 10 years of industry experience and comprehensive insurance coverage, including professional malpractice and general liability of at least 1 million dollars per occurrence. Submissions are limited to ten pages, excluding mandatory forms and charts, and must include a Non-Collusion Affidavit and Bidder Declaration. Either party may terminate the resulting agreement with 30 days written notice.
Bulloch County Board of Commissioners

POSTED

about 13 hours ago

DEADLINE

in 21 days
View Details

More opportunities from Department Of Defense → W074 Endist Mobile

Same awarding agency

NAICS: 236220
New
Federal
Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office
Solicitation # W9127826RA087
Solicitation W9127826RA087 is an unrestricted, two-phase, design-build construction project issued by the U.S. Army Corps of Engineers, Mobile District. The project involves the construction of a multi-level Operations Division office building for the Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office in Tuscaloosa, Alabama. The scope of work encompasses all necessary labor, equipment, and materials for site work, utilities, and environmental remediations, ensuring compliance with Department of War, U.S. Federal, and partner nation codes. The project has an estimated value between 10 million and 25 million dollars, with a strict Construction Cost Limitation of 21 million dollars; any proposal exceeding this limit will be deemed non-responsive. The anticipated completion period is 545 days. The procurement process is divided into two phases, with Phase One focusing on the evaluation of proposals to select a maximum of five firms for Phase Two, where detailed design requirements will be provided. Award will be based on a non-price/price trade-off analysis to determine the best value, prioritizing the design concept, preliminary schedule, and small business participation. Key requirements include a 100 percent performance bond, adherence to EM 385-1-1 safety standards, and the provision of a specialized design-build team including a Design Quality Control Manager. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal in PDF format.
Commercial and Institutional Building Construction

POSTED

about 22 hours ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS