Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

RECOVERY--C--PROJECT NUMBER 410, Apalachicola, Chattahoochee and Flint Rivers, GA,PL & Fl

Active
W91278-10-248-ARRAFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves a sedimentation survey analysis for the U.S. Army Corps of Engineers (USACE) Mobile District, specifically focusing on the George W. Andrews Lock and Dam. The contractor, operating under the existing contract W91278-10-D-0014-0014 with Tetra Tech, Inc., is tasked with completing a sedimentation and erosion analysis report based on survey data provided by the government. Additionally, the contractor will update area elevation data related to the project, supporting efforts by the Engineering Division's Water Management Section. The work falls under the Indefinite Delivery Indefinite Quantity (IDIQ) contract W91278-10-D-0014 and corresponds to project number 410, involving the Apalachicola, Chattahoochee, and Flint Rivers in Georgia and Florida. The contract's solicitation was posted on May 27, 2010, under NAICS code 541330, and is managed by the Department of Defense office located in Mobile, Alabama. This opportunity was available exclusively to the existing contractor under the referenced contract and is provided for informational purposes in accordance with FAR 5.7, with no broader solicitation applicable.

General Info

Sedimentation survey and erosion analysis for USACE Mobile District at George W. Andrews Lock.

NAICS

541330 - Engineering Services

Place of Performance

AL

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Mobile
ContactsNo contacts available
OfficeMOBILE, AL, 36602-3630, USA
Office AddressMOBILE, AL, 36602-3630, USA
ContactsNo contact information available

Full Description

Show more
RECOVERY - PER FAR 5.7, THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR UNDER THE CURRENT CONTRCT NUMBER: W91278-10-D-0014-0014, Tetra Tech, Inc. Description of Work: This effort is in support of a Sedimentation Survey Analysis for USACE Mobile District projects. The contractor will complete a Sedimentation and Erosion Analysis Report for George W. Andrews Lock and Dam using survey data provided by the Government. The contractor will also create updated area elevation data for the project. Contract Description: Engineering Division, Water Management Section plans to utilize IDIQ contract W91278-10-D-0014 to perform this work.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → W074 Endist Mobile

Same awarding agency

NAICS: 236220
New
Federal
Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office
Solicitation # W9127826RA087
The U.S. Army Engineer District, Mobile, is soliciting proposals for a firm-fixed-price, design-build construction project to establish the Black Warrior, Tombigbee, Alabama, and Coosa Rivers Project Management Office in Tuscaloosa, Alabama. The scope of work includes all labor, equipment, and materials for the construction of the office building, as well as necessary site work, utilities, and environmental remediations. The project has an estimated cost range between 10 million and 25 million dollars, with a strict Construction Cost Limitation of 21 million dollars. The total period of performance for completion is 545 calendar days. This is an unrestricted, two-phase competitive procurement using a non-price/price trade-off analysis to determine the most advantageous offeror. Phase One focuses on the evaluation of technical approach and performance capability to select a maximum of five firms for Phase Two, where detailed design requirements will be finalized. Key requirements include the provision of a dedicated project team, including a Construction Project Manager and Quality Control Managers, and adherence to EM 385-1-1 safety standards. The government has established small business participation goals of 23 percent for small businesses and 5.77 percent for HUBZone firms. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal in PDF format.
Commercial and Institutional Building Construction

POSTED

about 13 hours ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS