Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on April 27, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY--C--PROJECT NUMBER 76150, Upper Mississippi River Restoration, IL, IA, MN, MO & WI

Awarded
W912ES07D0005CD01Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The US Army Corps of Engineers issued Task Order CD01 under Indefinite Delivery Indefinite Quantity contract W912ES-07-D-0005 for the Upper Mississippi River Restoration project. This effort focuses on Pool 8, spanning parts of Wisconsin and Minnesota, to depict river and floodplain habitat features. The project requires specialized expertise in fluid dynamics, hydraulics, hydrology, river geomorphology, and computer engineering to expand upon previous hydrodynamic modeling conducted by the University of Iowa Institute for Hydraulic Research using MIKE 21 and FLUENT models. The scope of work involves utilizing newly acquired floodplain elevation, bathymetry, and digital elevation data to dynamically simulate water movement across the landscape based on daily discharges and dam operations. By integrating land elevation and cover data, the project aims to predict the distribution and dynamics of habitat features over time. This modeling framework is designed to be standardized, allowing for similar applications at other locations within the river system where comparable data is available.

General Info

Agency

N/A

Contract Value

$165,852

NAICS

541330 - Engineering Services

Place of Performance

IL, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Upper Mississippi River Restoration, IL, IA, MN, MO & WI DEPICTING RIVER AND FLOODPLAIN GIS/HYDRODYNAMIC MODEL Task Order CD01; Pool 8 of the Upper Mississippi River, including the floodplain depicting river and floodplain habitat features using GIS Landscape data and hydrodynamic modeling; Pool 8 is located in the States of WI (counties Vernon, La Crosse) & MN (Houston, Winona)The US Army Corps of Engineers intends to issue Task Order CD01 under Indefinite Delivery Indefinite Quantity W912ES-07-D-0005. The works includes development of these models requires capability in fluid dynamics, hydraulics, hydrology, river geomorphology, and computer engineering. This work will expand and extend recent hydrodynamic modeling work conducted by the University of Iowa Institute for Hydraulic R esearch (IIHR) utilizing MIKE 21 and FLUENT models. This project will use newly acquired floodplain elevation and bathymetry data, collected by the Corps Environmental Management Program (EMP), the recently developed seamless digital elevation data layer for Pool 8 developed by USGS-UMESC, and will expand the range of conditions and landscape elements included in previous models. The model will dynamically simulate movement of water over the landscape (including beyond bank full), based on a sequence of daily discharges and rules for dam operations, and predict the distribution, abundance, and dynamics of habitat features through time. This modeling framework will be built on standard physical data (land elevation, land cover, daily discharge) such that similar models can be developed at any location within the system where those data are available. P2# 115809

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS