Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Recovery Project Site Viewing, Anthony Lakes Highway Road 73 Reconstruction, Wallowa-Whitman National Forest

Active
ProjectSiteVisit-WWNFFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Anthony Lakes Highway Road 73 Reconstruction project involves extensive roadwork over approximately 10 miles within the Wallowa-Whitman National Forest. The work is divided into four segments, each with specific treatment requirements including crack sealing, chip sealing, pulverizing and repaving with hot mix asphalt, and sub-excavation with road structure replacement. Additional activities include construction staking, clearing, slope rounding and scaling, drainage improvements, culvert installations, use of geo-textiles and riprap, asphalt resurfacing, hydroseeding and mulching for erosion control, sign installation, temporary traffic control, and protection of buried utilities. Cut slope stabilization will be addressed through benching, reconstruction to gentler slopes, and slope scaling, with excavation materials being repurposed for parking lot expansions and slope re-contouring within the project area. Potential bidders are encouraged to visit the site before snow covers the area, as no formal site showings or Forest Service escorts will be provided. It is the bidder’s responsibility to physically inspect and verify site conditions. The project site is accessible from Baker City, Oregon via specific routes detailed in the project overview. Maps and further information are available at the Whitman Ranger District office. The project is managed by the USDA Forest Service with contacts available for technical queries, and set-aside status for bidding purposes has not yet been determined.

General Info

Reconstruction of 10 miles road with multiple treatments, erosion control, drainage, and slope stabilization.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Wallowa-Whitman National Forest Whitman Ranger District 3285 11th St. P. O. Box 947, Baker City, DC, 97814, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
Posted

special-notice

Notice updated

The notice description changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service-Spoc Nw
Contacts2 people available
OfficeWashington, DC, 202500001, USA
Office AddressWashington, DC, 202500001, USA
Contacts
Dana TaylorEngineer

Full Description

Show more
Recovery Project Site Viewing, Anthony Lakes Highway Road 73 Reconstruction, Wallowa-Whitman NF Draft Project Overview The following project description will, most definitely, change between now and when the solicitation is advertised, but due to the season in which this solicitation will be advertised, this project is being announced so that potential offerors may visit the site and ensure conditions are seen before the snow covers the project area. There will be no scheduled showing trips nor will a Forest Service employee be available to accompany prospective bidders to the site. However, bidders are reminded that is is their responsiblity to determine for themselves the actual site conditions and only by physical inspection, on-the-ground viewing can offerors assure themselves of the existing conditions. Maps are available at the Whitman Ranger District office. Thank you. The set aside has not been determined. The Anthony Lakes Highway project is approximately 10 miles long, and is one of the higher standard paved roads on the Forest. The project requires, but is not limited to construction staking, clearing and grubbing, slope rounding, excavation, slope scaling, drainage structures, culverts, geo-textile, riprap, aggregate, pit development, asphalt re-surfacing, hydro seeding and mulching, signs, and temporary traffic control. In addition, there are utilities buried in the road that need to be protected. The project is divided into four (4) segments. Segment - A (6.13 mi.) requires crack sealing, and a chip seal over the existing asphalt surface. Segment - B (2.55 mi.) requires pulverizing the existing asphalt, adding base aggregate and repaving with new hot mix asphalt. Segment - C (0.21 mi.) requires sub-excavating the road and replacing the road structure with geo-textile material, base and surface aggregate, and repaving with hot mix asphalt. Segment - D (0.60 mi.) also requires crack sealing and a chip seal. There are four (4) design sections that will address cut slope stabilization. These sections target cut slopes by either benching the existing slope or reconstructing the cut slope to a gentler ratio. The remaining cut slope stabilization sections will be addressed by slope scaling. Excavation from the design sections, slope scaling sections, and slope rounding will be utilized in the Anthony Lakes Ski Run parking lot expansion (Sta. 477+50), and the Anthony Snow Park parking lot expansion (Sta. 513+80). Stump disposal, wood chip, and excavation waste area are located on Rd. 7300140 (Sta. 440+97). Additional alternative excavation waste areas may be utilized at (Sta. 509+00), and Anthony Lakes Ski Run - bunny hill re-contouring (Sta. 484+50) if needed. To further stabilize the cut slopes, hydro seeding, and wood chip mulch will be placed on the cut slopes to provide erosion control. The project may be reached starting from Baker City, Oregon by traveling NW on State Hwy. 30 approximately 9 miles to Haines, Oregon. Then travel West on County Road 1124 approximately 15 miles to the beginning of the Anthony Lakes Highway Reconstruction Project at Forest Boundary. Thank you

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 14 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 14 hours ago

DEADLINE

in about 16 hours
View Details
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 14 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 19 hours ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS