Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Environmental Protection Agency was posted on September 14, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY: Support for the Bountiful Woods Superfund Site

Awarded
015-RARA-088GFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project, necessitated by a sprinkler system failure, requires the remediation of mold throughout the entire building and the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA guidelines, and OSHA regulations, with Indiana state laws prevailing if they are more stringent. Key deliverables include the provision of a Certified Industrial Hygienist, a detailed mold remediation plan featuring HEPA filtration and negative air pressure, and a one-year workmanship guarantee. The contract is awarded on a best-value basis, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal with a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Indiana Contractor's License. Mandatory requirements include attendance at the site pre-bid walk-through and the provision of specific insurance coverages, including automobile liability and workers compensation. Performance must begin within 14 days of the Notice to Proceed, and the contractor must adhere to Davis Bacon Act wage determinations. Payment terms are Net 30.
Atterbury Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

This contract involves awarding a work assignment under the Remedial Action Contract 2 (RAC2) to support ongoing cleanup activities at the Bountiful Woods Superfund Site in Utah. Funded through the American Recovery and Reinvestment Act (ARRA) of 2009, the assignment focuses on completing remedial actions in accordance with the Record of Decision and the Remedial Design Report. The contractor is responsible for providing all necessary personnel, subcontractors, equipment, and technical services to implement a groundwater extraction and treatment system designed to remove perchloroethylene (PCE) contamination. This system utilizes liquid phase granular activated carbon to treat groundwater at flow rates ranging from 80 to 140 gallons per minute, aiming to reduce volatile organic compounds to specified design concentrations. The performance period for this assignment is from September 10, 2009, to August 31, 2011. Although the contract was competitively awarded on a cost-plus fixed-fee basis rather than as a fixed-price agreement, it was structured to incentivize efficient and cost-effective performance. The Environmental Protection Agency’s Headquarters Acquisition Division oversees the contract, with the work carried out on-site in Bountiful, Utah. This assignment ensures the continuation of critical remedial actions that protect environmental and public health by managing contamination at this designated Superfund location.

General Info

Awarded contract to implement groundwater treatment system for PCE cleanup at Bountiful Woods Superfund site.

Contract Value

$5,000,000

NAICS

562910 - Remediation Services

Place of Performance

Bountful Woods 500 South 800 West, BOUNTIFUL, UT, 84010, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyEnvironmental Protection Agency → Headquarters Acquisition Division (hqad)
Contacts1 person available
OfficeWASHINGTON, DC, 20460, USA
Office AddressWASHINGTON, DC, 20460, USA
Contacts
Benita C. JacksonContracting Officer

Full Description

Show more
THIS NOTICE IS FOR INFORMATIONAL PURPOSES ONLY. A WORK ASSIGNMENT IS BEING AWARDED UNDER THE REMEDIAL ACTION CONTRACT 2 (RAC2), CONTRACT NO. EP-W-06-006. In compliance with the American Recovery and Reinvestment Act (ARRA) of 2009, the Government posts this special notice of intent to issue a Work Assignment (WA), 015-RARA-088G, under an established, competitively awarded, Cost Plus Fixed-Fee (EP-W-06-006) contract. The purpose of this Work Assignment is to obligate $5,000,000.00 for the continuation of the Remedial Action (RA) activities for support of the Bountiful Woods, Superfund Site. The work assignment is to complete the Remedial Action (RA) that meets the RA objectives presented in the Record of Decision (ROD) and the performance criteria and specifications provided in the Remedial Design Report (RD). The WA requires the contractor to furnish all necessary and appropriate personnel, including subcontractors, equipment, materials, and the technical services needed for, or incidental to, performing and completing the RA. The RA implementation is based on a groundwater extraction and treatment system, designed to pump PCE contaminated groundwater and treat the water by using liquid phase granular activated carbon (GAC) equipment. The system controls will be fully automatic and will be sized to handle a normal flow rate of 80 gpm and a maximum flow rate of 140 gpm. The system will be capable of removing VOCs contaminants to the design effluent concentrations as described in the RD. The work assignment will be using funding from the American Recovery and Reinvestment Act of 2009 to continue the remedial action work. The period of performance of this WA is from September 10, 2009 to August 31, 2011. Although the Agency's RAC2 contracts were not awarded as fixed-priced contracts, they were awarded competitively, and each contract structure was selected to provide the contractor with the greatest incentive for efficient and economical performance, given the types of services to be performed.

More opportunities from Environmental Protection Agency → Headquarters Acquisition Division (hqad)

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS