Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on July 28, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY--56--Coralville Lake Recretional Area, Iowa City, IA. Waterborne Restroom/Shower Facility Installation and Waterless Vault Restroom

Awarded
W912EK-09-T-0059Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332311
New
Federal
Solicitation_S-280C/G Vehicle Mounted Shelter
Solicitation # W912CH-26-R-A096
The Army Contracting Command - Detroit Arsenal is soliciting proposals for a five-year, Firm-Fixed-Price, Indefinite Delivery/Indefinite Quantity contract for the manufacture and delivery of four variants of the S-280C/G Vehicle Mounted Shelter. These lightweight tactical shelters, available in shielded and unshielded configurations with or without mobilizer adapter kits, are designed to protect personnel and sensitive electronic equipment from demanding field environments and electromagnetic interference. The contract has a minimum guaranteed value of 100,000 dollars and a maximum estimated ceiling of 4,000,000 dollars. This is a 100 percent small business set-aside under NAICS 332311. Award will be based on a best-value tradeoff process, weighing technical factors and price with approximately equal importance. Technical evaluation focuses on EMI shielding design and manufacturing processes. Mandatory requirements include First Article Testing and strict adherence to the government-owned Technical Data Package and ASTM E1975-22 standards. The contractor must also provide technical publications and provisioning data. Deliveries are FOB Destination, with an estimated distribution of 75 percent CONUS and 25 percent OCONUS, and a maximum sustained production rate of 20 shelters per month. Proposals must be submitted electronically by October 30, 2026.
W6QK Acc- Dta

POSTED

about 15 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

This contract involves the turnkey construction of two types of facilities at the Coralville Lake Recreational Area in Iowa City, Iowa: a waterborne restroom and shower facility and a waterless vault restroom. For the waterborne facility, the contractor is responsible for excavation, reinforced concrete work for the footing, foundation, and slab, CMU wall construction, and the installation of a steel-framed insulated concrete roof and all fixtures. The government will provide water, sewer, and electrical services within 10 feet of the foundation, as well as the supply and installation of interior restroom accessories. For the waterless vault restroom, the contractor is tasked with the complete turnkey process, including excavation, tank placement, backfilling, and the construction of the reinforced concrete foundation, CMU walls, and insulated roof. This scope also includes the installation of all necessary fixtures and accessories. For both structures, the top of the slab must be positioned between 12 and 18 inches above the existing grade.

General Info

Agency

N/A

Contract Value

$814,450.46

NAICS

332311 - Prefabricated Metal Building and Component Manufacturing

Place of Performance

IA, USA

Set-Aside

NONE

Awardee

ROMTEC INC

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Steven R. JessenProcurement Analyst

Full Description

Show more
Water Borne Restroom / Shower Facility Installation Requirements: Contractor is responsible for turnkey construction to include connection to utilities, excavation and rebar reinforced concrete, pouring of footing, foundation and slab, floor drains, installation or construction to include reinforced CMU walls, 8 solid concrete and steel-framed insulated roof. Trim out of the complete building with all fixtures. Top of slab will be 12-18 above existing grade. Government will bring water, sewer and electrical service to within 10 feet of the foundation. Restroom accessories such as toilet paper dispensers, signs, trash cans and sanitary napkin receptacles will be supplied and installed by the government. Waterless Vault Restroom Installation Requirements: Contractor responsible for turnkey construction to include excavation, tank placement, backfill, concrete, rebar, pouring of footing, foundation and slab, building installation or construction to include reinforced CMU walls, 8 solid concrete and steel-framed, insulated roof. Trim out of the complete building with all fixtures and accessories. Top of slab will be 12-18 above existing grade.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS