Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

RECOVERY--Y--Maintenance dredging of Mobile District Navigation Projects Principally the Black Warrior-Tombigee, Alabama River System and Tennessee-Tombigee Waterway

Active
W91278-09-D-0006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mobile District Corps of Engineers plans to issue a Firm Fixed Price Task Order under contract number W91278-09-D-0047, an Indefinite Delivery Indefinite Quantity (IDIQ) contract that was fully competed and awarded in May 2009. This task order involves the rental of cutterhead dredging equipment along with operator services for maintenance dredging operations specifically targeting navigation channels within the Black Warrior-Tombigbee River System, Alabama River System, Tennessee-Tombigbee Waterway, and other Mobile District navigation projects spread across various counties in Alabama, Mississippi, and Florida. The project is associated with the Recovery Act and seeks to maintain navigability and ensure safe passage through these critical waterway systems. The contract falls under NAICS code 237990, which pertains to heavy civil engineering construction, and is managed by the Department of Defense’s Mobile District office in Alabama. This maintenance dredging effort will focus on removing accumulated sediments to support ongoing navigation and commercial use of these waterways. The award of the task order reflects a strategic effort to sustain infrastructure funded through Recovery Act programs, highlighting the importance of these waterways in regional commerce and transportation. The task order issuance is for informational purposes and follows stringent federal acquisition regulations outlined in FAR Part 14.

General Info

Firm Fixed Price Task Order for cutterhead dredging rental and operator services in Alabama, Mississippi, Florida.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

AL

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Mobile
ContactsNo contacts available
OfficeMOBILE, AL, 36602-3630, USA
Office AddressMOBILE, AL, 36602-3630, USA
ContactsNo contact information available

Full Description

Show more
Recovery Act Notice: This notice is provided for informational purposes only. The Mobile District Corps of Engineers intends to issue a Firm Fixed Price Task Order (Task Order 0001) to contract number W91278-09-D-0047 an IDIQ contract which was fully competed and established in accordance with FAR Part 14, on 18-May-2009. This contract is for the Rental of Cutterhead and Attendant Plant with Operator for Maintenance Dredging, Black Warrior-Tombigbee River System, Alabama River and the Tennessee-Tombigbee River System, Various Counties in Alabama, Mississippi, and Florida, and other Mobile District Navigation Projects. Recovery Act approved project for maintenance dredging within the navigation channel along the Tennessee-Tombigbee Waterway.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
Construction of Big White Pickleball Courts
Solicitation # RDKB-26-PBCBW
The Regional District of Kootenay Boundary (RDKB) is soliciting bids for the construction of two pickleball courts at the Big White Ski Resort, specifically located at the Happy Valley Skating Rink in British Columbia. This unit price contract encompasses a comprehensive scope of work including earthworks, site grading, drainage, the removal of oversized boulders, pavement construction, concrete curbing, asphalt paving, and court surfacing. Key deliverables include the installation of cast-in-place net pole bases and the provision of survey layout and project record documents. The project is scheduled for substantial completion by June 7, 2027, with final completion required by June 15, 2027. Prospective bidders must submit their proposals in PDF format via email to Mark Daines by the December 11, 2026, deadline. Submissions must include detailed company information, a designated Project Manager as the single point of contact, at least two relevant references, and a comprehensive fee structure including a total maximum upset fee and a schedule of hourly rates. Bidders must also provide a work plan, methodology, and a list of all proposed subconsultants. Mandatory requirements include the ability to maintain Comprehensive General Liability Insurance of at least 5,000,000.00 CAD, compliance with the British Columbia Workers Compensation Act, and the submission of a Health and Safety Manual and Occupational Health and Safety Plan prior to commencing onsite work. Award decisions are based on a ranking process, and the successful proponent must provide performance security within 10 days of being deemed the highest ranked.
Regional District of Kootenay-Boundary

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → W074 Endist Mobile

Same awarding agency

NAICS: 236220
New
Federal
Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office
Solicitation # W9127826RA087
Solicitation W9127826RA087 is an unrestricted, two-phase, design-build construction project issued by the U.S. Army Corps of Engineers, Mobile District. The project involves the construction of a multi-level Operations Division office building for the Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office in Tuscaloosa, Alabama. The scope of work encompasses all necessary labor, equipment, and materials for site work, utilities, and environmental remediations, ensuring compliance with Department of War, U.S. Federal, and partner nation codes. The project has an estimated value between 10 million and 25 million dollars, with a strict Construction Cost Limitation of 21 million dollars; any proposal exceeding this limit will be deemed non-responsive. The anticipated completion period is 545 days. The procurement process is divided into two phases, with Phase One focusing on the evaluation of proposals to select a maximum of five firms for Phase Two, where detailed design requirements will be provided. Award will be based on a non-price/price trade-off analysis to determine the best value, prioritizing the design concept, preliminary schedule, and small business participation. Key requirements include a 100 percent performance bond, adherence to EM 385-1-1 safety standards, and the provision of a specialized design-build team including a Design Quality Control Manager. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal in PDF format.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 4 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS