Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

RECOVERY--Y--PROJECT NUMBER 18110, Wright Patman Dam and Lake, TX

Active
W9126G-07-D-0040-0034Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract is a task order under the existing contract number W9126G-07-D-0040 with Tatum Excavating Company, Inc., focused on work at Wright Patman Dam and Lake, Texas. The scope involves the construction and subsequent removal of a temporary watertight enclosure, or cofferdam, located downstream from the stilling basin. The contractor is required to build this structure using select fill material compacted in layers to ensure stability, preventing collapse and erosion during the dewatering and inspection process of the site. Issued by the Department of Defense’s W076 Endist Ft Worth office, this task order falls under NAICS code 238910, which pertains to site preparation contractors. The contract serves a recovery-related function and is specifically available to contractors currently holding the referenced contract number, indicating a continuation or extension of previous work. The work will be performed at Wright Patman Lake in Texas, with all contract management and administration handled out of Fort Worth, TX.

General Info

Task order for cofferdam construction and removal at Wright Patman Lake by Tatum Excavating.

NAICS

238910 - Site Preparation Contractors

Place of Performance

TX

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Ft Worth
ContactsNo contacts available
OfficeFORT WORTH, TX, 76102-6124, USA
Office AddressFORT WORTH, TX, 76102-6124, USA
ContactsNo contact information available

Full Description

Show more
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Tatum Excavating Company, Inc. W9126G-07-D-0040 This task order will be for the installation and removal of a temporary watertight enclosure (coffer dam)to be located downstream from the stilling basin at Wright Patman Lake. The Contractor will construct the watertight enclosure (coffer dam). The dam will be constructed of select fill material compacted in lifts to prevent the dam from collapsing and eroding while the dewatering and inspection is being performed.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → W076 Endist Ft Worth

Same awarding agency

NAICS: 237130
New
Federal
B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback
Solicitation # W9126G27R1CSY
The U.S. Army Corps of Engineers, Fort Worth District, is conducting market research via a Sources Sought notice for the B-21 Utilities and Site Improvements project at Dyess Air Force Base, Texas. This initiative aims to establish high-reliability primary electrical power distribution and dedicated fiber-optic communications infrastructure to support the bed-down of the B-21 weapons system. The scope includes the installation of single-mode fiber optic cables, telephone system expansion, power cabling in concrete encased ducts, pole-mounted conductors, and associated transformers and switchgear. The project also encompasses site improvements such as earthwork, grading, and erosion control. The estimated Construction Cost Limitation is $28,550,000, though an $8 million electric substation and specific end-user network equipment are expressly excluded from this contract. The government is currently evaluating whether to utilize a traditional Federal Acquisition Regulation based contract or an Other Transaction Agreement under 10 U.S.C. section 2808a. If a collaborative procurement framework is chosen, a two-phase selection process will be implemented, focusing first on technical capability, past performance, and collaborative execution history, followed by an evaluation of final technical and price proposals. The project must adhere to strict Department of Defense standards, including UFC 1-200-01 for general building requirements, UFC 4-010-01 for antiterrorism, and UFC 4-010-06 for cybersecurity of facility-related control systems. The anticipated period of performance is 690 calendar days from the notice to proceed, with a required beneficial occupancy date of March 8, 2030.
Power and Communication Line and Related Structures Construction

POSTED

about 11 hours ago

DEADLINE

in 14 days
View Details
NAICS: 561720
New
Federal
Janitorial Contract Eagle Pass, TX
Solicitation # W9126G27QA003
Solicitation W9126G27QA003 is a combined synopsis and request for quotes for commercial janitorial services for a Department of Defense administrative office located at 140 N. Adams Street, Eagle Pass, Texas. This acquisition is a total set-aside for small business concerns, including HUBZone, SDVOSB, WOSB, and EDWOSB categories. The selected contractor will provide all necessary personnel, equipment, and supplies to perform cleaning services on a two-day per week schedule for a period of performance lasting 12 months from the date of award. The government will award the contract to the responsible offeror whose proposal is most advantageous, considering price and other factors. Evaluation criteria include past performance, with a requirement for up to five references, and risk assessments via the Supplier Performance Risk System regarding item, price, and supplier risk. Awardees must provide a written Quality Control Plan within 30 calendar days of award and utilize a weekly signed janitorial service checklist to verify completion. Payment requests must be submitted electronically through the USACE Resident Management System rather than WAWF/iRAPT. Offerors must be registered in the System for Award Management with a valid Unique Entity Identifier and CAGE code. Proposals must include the solicitation number, offeror details, and a statement of agreement with all terms and conditions. Prices must remain firm for 60 calendar days from the submission deadline of November 5, 2026. The contract requires compliance with Service Contract Labor Standards, safety standards under 29 CFR Part 1925, and the designation of a qualified Contract Manager with full operational authority.
Janitorial Services

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 339950
New
Federal
Piney Woods Region, Lake O the Pines Park Signs
Solicitation # W9126G27QA002
Solicitation W9126G27QA002 is a total small business set-aside for the procurement of 187 custom aluminum signs for the USACE Lake O the Pines project in Jefferson, Texas. The requirement is a firm-fixed-price contract to provide signage for offices, boat ramps, and campgrounds. All signs must be fabricated in strict accordance with USACE Sign Program Manuals EP 310-1-6a and EP 310-1-6b, as well as the Corps Graphic Standards Manual EP 310-1-6. Key technical requirements include the use of specific aluminum substrates, Diamond Grade retroreflective sheeting where specified, and adherence to approved USACE colors and Helvetica typography. The government will award the contract to a responsible offeror based on best value, utilizing a GO/NO GO technical evaluation to ensure product specifications are met. Deliverables include the signs and required artwork proofs for approval prior to shipping. The revised delivery schedule is 30 to 45 business days following artwork and color match approval, with an estimated final delivery date of December 1, 2026. Shipping is FOB Destination and is the responsibility of the contractor. Offerors must submit their quotes electronically via the PIEE Solicitation Module by November 12, 2026, at 10:00 A.M. CST. Submissions must include a price volume, a technical volume detailing each sign and the estimated delivery timeframe, a completed vendor information sheet, and signed acknowledgments of all amendments. Payment will be processed electronically through Wide Area WorkFlow.
Sign Manufacturing

POSTED

2 days ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS