This Government Contract opportunity from Department Of Defense was posted on November 16, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY--Y--Maintenance Dredging Broad Creek, Middlesex County, Virginia

Awarded
W91236-09-B-0022Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

about 9 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

This contract, managed by the Department of the Army, Norfolk District, Corps of Engineers, concerns maintenance dredging at Broad Creek in Middlesex County, Virginia. The project involves the dredging of approximately 36,000 cubic yards of material with an estimated construction duration of 100 calendar days and a project magnitude between 250,000 and 500,000 dollars. This opportunity was designated as a 100 percent small business set-aside and adheres to ARRA Buy American requirements. The contractor is responsible for the removal and placement of excavated material using a Government Furnished Upland Placement Area. Key technical requirements include ensuring the adequacy of dikes, spillboxes, and drainage piping, as well as the installation and maintenance of a specific steel pipe plug. The contractor must maintain a minimum ponding depth of two feet and a minimum freeboard of two feet, with immediate notification to the COR if freeboard drops below four feet. Operational mandates include providing qualified personnel for 24-hour monitoring during placement and dewatering, managing effluent discharge via a specific pipeline configuration, and performing all necessary grading and ditching to ensure the site is left in a well-maintained condition.

General Info

Contract Value

$233,712.15

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

VA, USA

Set-Aside

NONE

Award Issued Date

Documents

7
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstq-and-a
High
PDF, High priority: read this firstamendment
High
PDF, Low prioritybid-abstract
Low
ZIP
ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Oct 29, 2009 to Oct 30, 2009. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Oct 30, 2009 to Oct 29, 2009. The notice title changed. NAICS code removed. The notice description changed. The point of contact changed.

Notice updated

Response deadline time changed from 5:00 AM UTC to 7:00 PM UTC on Oct 29, 2009. The notice description changed. The point of contact changed.

Notice updated

Response deadline time changed from 7:00 PM UTC to 5:00 AM UTC on Oct 29, 2009. The notice title changed. NAICS code added: 237990. The notice description changed. The point of contact changed.

Notice updated

Response deadline time changed from 5:00 AM UTC to 7:00 PM UTC on Oct 29, 2009. The notice title changed. NAICS code removed. The notice description changed. The point of contact changed.

Notice updated

The notice title changed. NAICS code added: 237990. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist Norfolk
Contacts1 person available
OfficeNORFOLK, VA, 23510-1096, USA
Office AddressNORFOLK, VA, 23510-1096, USA
Contacts
Lynn M. TannoContract Specialist

Full Description

Show more
RECOVERY--THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER W91236-09-B-0022. TECHNICAL AMENDMENT 1. REVISED DRAWING: Delete drawing H-50-14-52(2) and substitute therefore the attached new drawing H-50-14-52(2). 2. SECTION 35 20 23 Page 4 and 5, delete paragraphs 3.1, 3.1.1 and 3.1.2 and substitute therefore the following new paragraphs 3.1, 3.1.1 and 3.1.2: 3.1 REMOVAL AND PLACEMENT OF EXCAVATED MATERIAL AND REQUIREMENTS FOR USE OF GOVERNMENT FURNISHED PLACEMENT AREA 3.1.1 Government Furnished Upland Placement Area The interior and exterior of the placement area, dikes, spillboxes and associated drainage piping have been completely upgraded under separate contract prior to dredging and are expected to be adequate for the placement of dredged material proposed in this contract; however, the Contractor is responsible to insure all portions of the placement area, dikes, drainage piping and spillboxes are adequate and in proper working order before commencement of placement operations. In addition, the Contractor shall provide a steel pipe plug in the exterior opening of the 24-inch pipe culvert at the south end of the placement area for the duration of dredging and dewatering of the placement area. The pipe plug shall be manufactured for this specific use and securely installed and maintained water-tight by the Contractor in accordance with the manufacturers written instructions. The Contractor shall remove the pipe plug after dewatering of the placement area is complete. All data of the manufacturer verifying the pipe plug provided meets these requirements must be submitted to the government for approval prior to use. Any required clearing or grading of the interior or exterior of the placement area, repairs to dikes or spillboxes and associated drainage piping, clearing of debris from spillboxes or piping, and replacement of weir boards is the Contractor's responsibility and shall be provided at no additional cost to the Government with all associated costs for these items included as part of the Contractor's mobilization expenses. All materials repaired or replaced shall be in sizes and type to match existing as approved by the Contracting Officer. All trash and debris shall be removed and disposed in approved landfills at the Contractor's expense. Prior to commencing dredging operations, the weir boards shall be set at a height to assure a minimum ponding depth within the placement area of two feet measured at the spillbox. Additionally, for the duration of the contract the Contractor shall be responsible to maintain the placement area dikes and operate the spillbox by keeping spillway weirs at the correct level and free of trash and debris at all times to maintain: (1) the minimum required ponding level; (2) specified freeboard; and (3) specified effluent and other water-quality standards. The upland placement area consists of a two-part drainage system. Clarified water passing through the weir will drain into a lower tiered area of the diked placement area. All requirements of maintaining a minimum two feet of freeboard in this area shall apply as specified herein. The Contractor shall provide a suitable pump and all hydraulic pipeline to dewater this area as the work progresses. The Contractor shall be responsible to coordinate the pumping of the dredged material into the placement area with the simultaneous pumping out of the lower tiered area once clarified water has passed through the weir and reached an acceptable depth in the lower tiered area. Location of piping shall be as indicated. Type, size and location of pump shall be submitted for approval. The location of the discharge end of the effluent pipeline from the lower tiered area is approximately 2000 feet and shall conform to the detail sectional view as indicated. The discharge end of the pipeline shall be supported at a 20-degree discharge angle to the water surface with the bottom of the pipeline end at a depth of 3 feet below the water surface unless directed otherwise by the Contracting Officer. The Contractor shall provide conversion piping for the 20 degree discharge angle, flotation, and control devices as required. 3.1.2 Placement Area Use and Maintenance During Placement Operations The Contractor shall install a baffle plate, spreader pipes, pocket pipes, or other approved apparatus to the discharge end of the dredge pipeline to prevent scour and washouts within the dike and at the dredge pipe outfall. The Contractor shall employ proper dredging and placement methods to ensure that adequate ponding depth is maintained and that a minimum of two feet of freeboard, measured at the minimum containment dike elevation, is maintained at all times. The contractor shall immediately notify the COR if the freeboard drops below four-feet. The Contractor shall immediately suspend dredging and placement operations in the event of any containment dike failure, if dikes are being scoured by dredging, or if dike failure appears to be imminent. The Contractor may resume work only after suitable permanent repairs to the containment dike have been made. The Contractor shall provide at least one qualified employee during daylight and at least two qualified employees at night to monitor the Contractor's dredged material placement operations, including but not limited to the discharge of material, level of ponding, freeboard, condition of the dikes, and release of effluent from the Placement Area. Watches shall be on site during all dredged material placement operations, including dewatering of the entire placement area after the dredge stops placing material. The number of employees is expressed as a minimum; accordingly, the Contractor is responsible to provide at his expense the number of employees required to accomplish all work as indicated and specified. If during observance of his work the Contracting Officer determines the Contractors staff on site to be insufficient, additional employees in a number as directed by the Contracting Officer will be provided by the Contractor at his expense. Any damages that result from the negligence of the Contractor to properly manage the dredged material placement and properly maintain the containment dikes shall be fully repaired by the Contractor at his own expense. The Contractor shall leave the placement site in a well maintained condition. The spillbox shall be well maintained with the boards at the correct level and free of trash and debris at all times. During the progress of the work the Contractor shall perform grading and ditching as necessary to eliminate undrained areas within the containment area. At the completion of the scheduled work, the Contractor shall leave the spillbox in a well-maintained and operable condition to assure adequate site drainage.

More opportunities from Department Of Defense → W2SD Endist Norfolk

Same awarding agency

NAICS: 237990
New
Federal
Norfolk CSRM - PH1A - Floodwall Construction SATOC DBB
Solicitation # W9123627Z13MA
The U.S. Army Corps of Engineers Norfolk District is initiating the Norfolk Coastal Storm Risk Management Phase 1A Floodwall Construction project under solicitation W9123627Z13MA. This effort will utilize a Design-Bid-Build approach structured as a Single Award Task Order Construction contract with an estimated shared capacity of 250 million dollars. The project scope involves infrastructure construction extending from the Harbor Park Pump Station to the Campostella off-ramp in Norfolk, Virginia, and may include the construction of a floodwall, installation of tide gates, sliding or swinging gate closures, living shoreline features, and necessary utility relocations. The contract is expected to be divided into four to six task orders over a five-year base ordering period, with an optional six-month extension. Funding for the project may be sourced from the Bipartisan Infrastructure Law, Construction General Federal funding, and City of Norfolk funding. The procurement is currently in the market research and industry engagement phase, featuring a two-phase solicitation framework. Interested large and small business contractors were invited to an Industry Day on October 29, 2026, to learn about the program and provide feedback. The government is currently seeking voluntary written responses to specific market research questions regarding design coordination, risk management, and constructability, with a submission deadline of November 4, 2026. Primary points of contact for this procurement include Raven Sasser and Candace Lotomau.
Other Heavy and Civil Engineering Construction

POSTED

about 16 hours ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS