Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Department Of The Interior was posted on September 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--REED COULEE PIPELINE REPAIR

Awarded
140L3626Q0049Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Bureau of Land Management Montana State Office is soliciting quotes for a firm-fixed-price construction contract to repair and relocate an existing 2-inch water pipeline crossing Reed Coulee in Fergus County, Montana. The project aims to prevent future erosion and pipeline failure by excavating a new trench that ensures a minimum of six feet of cover. The contractor's scope of work includes providing OSHA-compliant excavations, dewatering, and site management, as well as backfilling and reclaiming all disturbed areas. While the contractor is responsible for the heavy construction and excavation services, the BLM will provide the replacement HDPE pipeline and perform the actual installation, splicing, and pressure testing. This is a total small business set-aside acquisition under NAICS code 237110, with an estimated magnitude between $10,000 and $25,000. The performance period is strictly defined, requiring the contractor to begin work within 10 calendar days of the award and complete all tasks within 36 calendar days, with a specific completion target of November 30, 2026. Proposals must be submitted in three separate electronic volumes: Required Documentation, Prior Demonstrated Experience, and Pricing. The award will be made on a best-value basis, with price being significantly more important than demonstrated experience. Contractors must comply with various federal regulations, including Montana heavy construction wage determinations, OSHA trench safety standards, and specific insurance requirements for general, automobile, and workers' compensation liability. All invoicing must be processed electronically through the Department of the Treasury's Invoice Processing Platform.

General Info

Small business to excavate, relocate, and restore pipeline at Reed Coulee, Montana for fixed price between $10K–$25K.

Contract Value

$9,500

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

MT, USA

Set-Aside

Total Small Business Set-Aside

Award Issued Date

Potential End Date

November 30, 2026

Documents

4
PDF, High priority: read this first7 pages · sow
High
PDF, High priority: read this first4 pages · wage-determination
High
PDF, High priority: read this first5 pages · amendment
High
PDF, High priority: read this first32 pages · ifb
High

Read all 4 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 14 days
  • Lift Station No. 85 ReplacementOpen now, due in 25 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseAwarded
Posted

Solicitation

Notice updated

The notice title changed.

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Montana State Office
Contacts1 person available
OfficeBILLINGS, MT, 59101, USA

Full Description

Show more
REED COULEE PIPELINE REPAIR

The Department of Interior, Bureau of Land Management (BLM), Montana State Office is soliciting quotes for excavation services to repair an existing 2-inch water pipeline crossing Reed Coulee. The existing pipeline has become exposed due to erosion and is at risk of failure during future runoff events. The project consists of excavating a new trench across Reed Coulee, exposing the existing pipeline at both tie-in locations, and providing a safe OSHA-compliant excavation for Government personnel. BLM personnel will install approximately 100 linear feet of new 2-inch HDPE water pipeline, complete the required splices, and pressure test the completed installation. Following Government approval, the contractor shall backfill the trench, restore disturbed areas, and reclaim the site. The objective of this acquisition is to permanently relocate the pipeline beneath the coulee while maintaining a minimum of six (6) feet of cover to prevent future exposure from erosion and ensure continued water service. The project is located in Fergus County, Montana.

PROCUREMENT OVERVIEW

TYPE OF CONTRACT: Construction, Firm Fixed Priced (FFP), Single Award Contract

TYPE OF CONSTRUCTION: Heavy

NAICS CODE: 237110, Water and Sewer Line and Related Structures Construction

MAGNITUDE: Between $10,000 and $25,000

RESTRICTIONS ON CONTACTS: Beginning upon release of the request for quote (RFQ) through contract award, contacting Government employees who may be associated with this work by participating quoter on the
subject of this RFQ is inappropriate. Quoters for this RFQ, including subcontractors and teammates, shall not attempt such contacts during this period. All correspondence shall be through the Contract Specialist listed below:

Bureau of Land Management
Attn: Jorge Alvarez
Phone: Sign up to see this detail
Email: Sign up to see this detail

SITE VISIT: The Government strongly urges quoters to inspect the site to gain a better understanding of the work requirements and to satisfy themselves regarding all general and local conditions that may affect the cost of performance. In no event shall failure to inspect the site constitute grounds for a claim after award.

See Section L, Site Visit (Construction) for more information.

QUESTIONS DUE: 24 August 2026 at 1:00 pm, Mountain Time. Questions submitted after this date and time will be accepted but may not be answered. All questions must be submitted in writing via e-mail to Jorge Alvarez. See Section L, Paragraph L.12, Submittal of Questions for more information.

QUOTE RESPONSE DATE: For dates when contractors are to submit their quotes, see block 13 of Standard Form 1442, ¿Solicitation, Offer, and Award (Construction, Alteration, or Repair).¿ See Section L, Instructions, Conditions and Notices to Offerors, for a list of required documents.

METHOD OF PROCUREMENT: This procurement is set-aside for Small Business Concerns and is a construction acquisition, pursuant to Federal Acquisition Regulations (FAR) Part 13, 19, and Part 36.

More opportunities from Department Of The Interior → Montana State Office

Same awarding agency

NAICS: 237110
Federal
Drainage System RestorationThe contract titled Drainage System Restoration pertains to the clear, repair, and reconstruction of culverts, ditches, and stormwater conveyance systems that have been damaged by debris and flooding. This work is essential to restore proper drainage function and mitigate future flooding risks in affected areas. The contract is classified as a subcontract under the NAICS code 237110, which corresponds to Water and Sewer Line and Related Structures Construction, indicating the specialized civil infrastructure nature of the tasks. The contracting agency is the Montana State Office under the Department of the Interior, suggesting the project is situated on federally managed lands or infrastructure. Although the solicitation number and detailed point of contact are not provided, the posted date of June 24, 2026, indicates this opportunity is in the planning or pre-award phase, and work will likely commence after contract award. The place of performance is not specified by city or state, but the involvement of the Montana State Office implies that all work will occur within the state of Montana. The absence of a set-aside designation suggests the subcontract is open to any qualified contractor without specific size or socioeconomic preferences. The task requires technical expertise in erosion control, hydraulic engineering, and heavy civil construction to effectively restore stormwater systems to their functional capacity.
Water and Sewer Line and Related Structures Construction

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237990
Federal
Emergency Slope Stabilization and RepairThe contract titled Emergency Slope Stabilization and Repair seeks to address damage to road embankments and slopes caused by fire-induced erosion and storm runoff, focusing on immediate stabilization and long-term repair efforts to restore structural integrity and prevent further degradation. Work will involve assessments of affected areas, installation of erosion control measures, regrading of destabilized slopes, and implementation of vegetation or geosynthetic solutions to reinforce the terrain and minimize future vulnerability to weather events. The effort is urgent and tied to the preservation of critical transportation infrastructure within a region impacted by recent environmental disturbances. This subcontract falls under the NAICS code 237990 for other heavy and civil engineering construction and is administered by the Montana State Office under the Department of the Interior. The contract was posted on June 24, 2026, and is intended for performance in an unspecified location within Montana, with no defined place of performance details provided. There is no set-aside classification specified, and no point of contact information is listed, indicating that interested parties must follow the provided SAM.gov link for further submission guidelines and requirements. The work demands technical expertise in earthworks, slope stabilization, and erosion control under challenging post-fire environmental conditions.
Other Heavy and Civil Engineering Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS