Reinforced Masonry Site Wall

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

El Segundo, CA, 90245, USA

Set-Aside

NONE

Documents

This scope was carved out of PW 26-17.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Hilltop Reservoir Grass Turf And Irrigation Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 27 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Hilltop Reservoir Grass Turf And Irrigation Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → CITY OF EL SEGUNDO
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs an 8-foot-high reinforced masonry site wall for prime contractors on City of El Segundo projects. Installs CMU blocks, places reinforcement bars (rebar), and pours grout/concrete. Follows CMU Reinforcement Development & Splice Lengths specifications. Delivers a completed 8-foot-high reinforced masonry wall.

Similar Contracts

Same NAICS industry code

NAICS: 238130
New
SLED
RFP-IIS-270000000337-3 | Ingham ISD - Mass Timber Design Assist & Supply
Solicitation # RFP-IIS-270000000337
The Ingham ISD Mass Timber Design Assist & Supply contract is a solicitation for the supply and installation of mass timber for the Beekman Center in Michigan. The scope of work includes the complete provision of labor, materials, and equipment for Glulam beams and columns, as well as Cross Laminated Timber (CLT) floors and roofs. Key deliverables include factory-applied moisture membranes on CLT top surfaces, various concealed and exposed steel connectors, and panel-to-panel splines. All CLT must meet ANSI/APA PRG 320 certification, and Glulam materials must adhere to specific grade references for simple spans, multi-spans, and columns. The contract is awarded to the lowest qualified bidder, with qualification determined by the bidder's project history, financial statements from the past two years, and safety performance. Bidders must provide unit pricing for materials and labor rates for potential change orders. Required submissions include a bid security or bond of at least 5% of the bid amount, a notarized Familial Disclosure Statement, and a Safety Supplement Form for the apparent low bidder. For contracts exceeding $50,000, separate Performance and Payment Bonds are required. Payment is processed through a certification workflow involving the Construction Manager and Architect, with final acceptance contingent upon the resolution of all punch list items and approval from regulatory agencies, including the State Fire Marshall and Health Department.
Ingham ISD

POSTED

1 day ago

DEADLINE

in 18 days
View Details

More opportunities from California → CITY OF EL SEGUNDO

Same awarding agency

NAICS: 238910
New
SLED
Hilltop Reservoir Grass Turf And Irrigation Project
Solicitation # PW 26-17
The Hilltop Reservoir Grass Turf and Irrigation Project (PW 26-17) is a solicitation by the City of El Segundo, California, for renovation improvements at a site located north of the intersection of Grand Ave and Lomita St. The scope of work includes the partial demolition of an existing reservoir, backfilling and grading the site for future park use, and the installation of landscaping, a reclaimed water irrigation system, perimeter fencing, and a new manual vehicular gate. Additionally, the project requires the construction of an 8-foot-high reinforced masonry site wall and general site demolition. The contractor is responsible for traffic control, protecting existing utilities, and managing construction and demolition waste recycling. The contract will be awarded to the lowest responsible bidder who is financially qualified and licensed according to state regulations. Bids must be submitted in writing on provided proposal forms and include bid security equal to 10% of the lump sum base bid. Performance must be completed within 60 working days from the Notice to Proceed, followed by a 90-day landscape maintenance and establishment period. All work is subject to the inspection and approval of the City Engineer or City Inspector, with specific labeling requirements for fire supply lines and water valves to distinguish between potable, non-potable, and recycled water. There is no specified set-aside status for this solicitation.
Site Preparation Contractors

POSTED

about 3 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237310
New
SLED
Concrete Improvements Project Re-Bid
Solicitation # PW 26-08
The Concrete Improvements Project Re-Bid (Project No. PW 26-08) for the City of El Segundo involves citywide public works improvements focused on the demolition and removal of existing concrete and asphalt, recycling of materials, and the installation of ADA-compliant infrastructure. The scope of work includes the replacement of 3,465 square feet of sidewalk, 640 square feet of driveway approaches, 299 linear feet of curb, and 5 curb ramps, along with asphalt slot paving, striping replacement, and repairs to the Continental Blvd./Grand Ave. north median. The contractor is responsible for traffic control, obtaining necessary encroachment and building permits, and ensuring all work adheres to Greenbook and 2010 ADA standards. The contract will be awarded to the lowest bidder based on the total of base bid items. Performance must be completed within 35 working days of the Notice to Proceed, with specific weekday work hour restrictions for residential streets and major arterials. Required certifications include worker's compensation, non-collusion declarations, and affirmative action statements, and bidders must be registered under Labor Code section 1725.5. Insurance requirements include $2,000,000 in commercial general liability and $1,000,000 in business automobile liability. Payment is issued from a Project Payment Account, with a 5% retention deducted from each progress payment. There is no specified set-aside status for this solicitation.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 18 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS