This Award Notice opportunity from East West Rail Company Limited was posted on November 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Relocation of 132kV UKPN Cut Throat Lane Switching Station

Awarded
International
Solicitation #
CT5316

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

East West Rail Company Limited is awarding a direct contract to UK Power Networks Operations Ltd for the relocation of the 132kV Cut Throat Lane Switching Station north of Bedford. This project is a critical component of the East West Rail programme, which aims to establish new and upgraded rail connections between Oxford, Milton Keynes, Bedford, and Cambridge. Because the existing switching station is located within the footprint of the proposed six-track railway corridor, it must be moved to allow construction to proceed. The scope of work includes the design, decommissioning, relocation, installation, testing, and commissioning of a replacement switching station, along with all necessary electrical, civil, and enabling works to ensure network resilience and continuity of supply. The contract is valued at 22,076,599.33 GBP excluding VAT and has a projected duration of seven years. A direct award was utilized because the required works are non-contestable electricity network works that can only be legally and technically performed by the licensed Distribution Network Operator under the Electricity Act 1989. Consequently, UK Power Networks Operations Ltd holds the exclusive rights to undertake these services, satisfying the conditions for a direct award under the Procurement Act 2023.

General Info

UK Power Networks will relocate Bedford switching station for 22.1 million GBP over seven years.

Contract Value

$0

NAICS

N/A

Place of Performance

GBR

Set-Aside

NONE

Award Issued Date

Contract End Date

November 19, 2033

Documents

2
PDF, Low priorityaward
Low
PDF, Low priorityaward
Low

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Solicitation requirements

1 mandatory

7 requirements in 2 areas

  • Technical1 · 1 must
    007

    Switching Station Scope of Work

  • Compliance6 · 0 must
    001

    The notice is an award notice for the…Optional

  • 5 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 7 requirements

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyEast West Rail Company Limited
Contacts1 person available
OfficeN/A

Full Description

Show more
East West Rail Co. (The Authority) is delivering the East West Rail programme, a nationally significant infrastructure project providing new and upgraded rail connections between Oxford, Milton Keynes, Bedford and Cambridge. As part of the delivery of the proposed six-track railway corridor north of Bedford, the railway infrastructure interfaces with existing 132kV electricity distribution assets owned and operated by UK Power Networks Operations Ltd at the Fairfield Park / Cut Throat Lane Switching Station north of Bedford. The existing switching station lies within the footprint of the proposed railway works and must be relocated to enable construction of the railway. The contract comprises the design, decommissioning, relocation, installation, testing and commissioning of a replacement 132kV switching station, together with all associated electrical, civil and enabling works required to maintain network resilience and continuity of supply, and to facilitate the transfer of services from the existing installation to the replacement facility. The requirement comprises non-contestable electricity network works that may only be undertaken by the licensed Distribution Network Operator in accordance with the statutory framework established under the Electricity Act 1989 (as amended). As the owner, operator and licensed Distribution Network Operator for the affected network assets, UK Power Networks Operations Ltd is the only organisation with the legal authority and technical responsibility to undertake the required works. Accordingly, competition is absent for technical and exclusive rights reasons. The Authority therefore intends to award the contract directly to UK Power Networks Operations Ltd. The Authority considers that the conditions for a direct award under Schedule 5, Paragraph 5 (a) and (b) of the Procurement Act 2023 are satisfied, as the works can only be supplied by a particular supplier due to the absence of competition arising from exclusive rights.

More opportunities from East West Rail Company Limited

Same awarding agency

NAICS: 541330
International
Integration Technical Operations Assurance & Environment (ITOAE)
Solicitation # CT4946
The East West Rail Company is procuring a single Integration, Technical, Operations, Assurance and Environmental (ITOAE) Partner to support the delivery of the East West Rail programme. This is a term appointment under an NEC4 Professional Service Contract with an estimated value of 300 million GBP excluding VAT. The contract is expected to run from April 3, 2028, to March 31, 2040, featuring value-for-money breakpoints at years 3, 6, and 9. The scope is divided into five functional pillars: Integration, Technical, Operations, Assurance, and Environmental and Consents. Key responsibilities include managing system integration, defining technical frameworks, supporting operational readiness, providing second-line assurance, and coordinating environmental consents and sustainability standards such as PAS 2080 and BREEAM. To ensure independence and mitigate conflicts of interest, the ITOAE Partner must be structurally separated from the Client Support Framework and main works; consequently, the appointed partner is ineligible for those contracts for the duration of the ITOAE term. The procurement follows a multi-stage Competitive Flexible Procedure, beginning with an Expression of Interest and a Pre-Selection Questionnaire that assesses legal, financial, and technical capacity. Mandatory requirements include the signing of an Ethical Walls Agreement and the maintenance of professional indemnity, public liability, and employer's liability insurance. The partner must also adhere to specific industry standards, including ISO 19650 for digital compliance and EN 50126/50128/50129 for safety cases.
Engineering Services

POSTED

30 days ago

DEADLINE

N/A
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS