Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Department Of Defense was posted on December 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Remanufacture of KC-135 Refueling and Submerged Pumps

Awarded
FA811825R0057Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Contract FA811826D0014 is a sole-source, firm-fixed-price requirements contract awarded to Eaton Corporation for the remanufacture of refueling and submerged pump assemblies for KC-135 aircraft. Managed by the Air Force Sustainment Center at Tinker Air Force Base, the contract spans a three-year period from April 6, 2025, to April 5, 2028, consisting of a one-year basic period and two one-year ordering periods. The scope includes the restoration of critical safety items, specifically refueling pumps and submerged pumps identified by NSNs 2915-01-418-0072JY, 2915-01-480-1668JY, and 2915-01-480-1671JY, to ensure they meet original equipment manufacturer technical baselines and USAF mission-ready standards. The award was justified as a sole-source procurement under FAR 6.302-1 because Eaton is the only source with the proprietary technical data, specialized tooling, and government-approved quality requirements necessary to perform the work without causing unacceptable program delays. Key contractual obligations include adherence to the Aviation Critical Safety Item Management Handbook, strict packaging and marking compliance per MIL-STD-129 and MIL-STD-2073, and the provision of surge production capabilities during national emergencies per DFARS 217.208-70. Deliverables are managed through a Contract Data Requirements List including monthly production and asset visibility reporting, with final delivery to the DLA Distribution Depot Oklahoma.

General Info

Contract Value

$0

NAICS

336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing

Place of Performance

OK, USA

Set-Aside

NONE

Award Issued Date

Documents

11
PDF, High priority: read this first56 pages · rfp
High
PDF, High priority: read this first3 pages · specifications
High
PDF, High priority: read this first3 pages · specifications
High
PDF, High priority: read this first4 pages · sow
High
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this first30 pages · sow
High
PDF, High priority: read this first2 pages · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, Low priorityjustification-and-authorization
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8118 Afsc Pzabb
Contacts2 people available
OfficeTINKER AFB, OK, 73145-3303, USA

Full Description

Show more
REMANUFACTURE A 3-YEAR (THREE-YEAR BASIC) FIRM FIXED PRICE REQUIREMENTS TYPE CONTRACT IS CONTEMPLATED. NOTE: THE GOVERNMENT ANTICIPATES A SOLE SOURCE AWARD TO Eaton Corporation (CAGE: 86090). (a) A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required. Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively. (b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture required to restore the end item to a like-new condition. The contractor shall also accomplish ALL necessary packing and preservation and packaging. ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price. The government shall only pay the contractor for missing components after review and approval of O&A request. No additional cost will be allowed (i.e. material handling, profit, direct or indirect costs). (c) Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Source Development, Small Business Office @ 405- 739-7243. SAR submittals need to be sent to: https://www.tinker.af.mil/Home/429SCMS-SASPO/ Source Development Specialist Email: Sign up to see this detail As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification. (d) In order to receive any technical data related to this acquisition, offerors must send an email request to Dessie Bresin at Sign up to see this detail or Amy Gil at Sign up to see this detail . Release of any data is subject to applicable data rights. The request shall include the applicable solicitation number, the specific data needed (including TO(s)), and a copy of the current, approved DD Form 2345. The form, including instructions for completing the form, is available at: http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html. The Government is not responsible for incomplete, misdirected, or untimely requests.** In order to receive drawings contractors will need to request all needed drawings through the JEDMICS website: https://af-jedmics.navair.navy.mil/webjedmics/index.jsp. Contractors who need an account will need to complete the instructions at the above link. (e) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c)) Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as - estimated or - maximum will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract. (f) END ITEMS BEYOND REMANUFACTURE "Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable requirements. Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the overhaul limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s). (g) If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the Contractor shall promptly notify the administrative contracting officer in writing and shall not perform further overhaul on any such items except at the direction of the administrative contracting officer (ACO). Upon written confirmation from the ACO that a particular item is not reparable, the contractor shall dispose of the unit in the manner directed by the ACO. Contractors are cautioned that until a contract is executed, any effort performed in support of the anticipated effort is performed strictly at their own risk and expense. There is no authorization to begin performance until the contractor has received a duly authorized contract signed by the Contracting Officer. Also, this request for proposal is not to be construed to mean that the award of a contract is assured, as the availability of funds, timely submission of all requested documents, and acceptance by both parties are prerequisite to any contract award. (h) Condemned units shall not be counted as production. (i) In the event there are component part(s) with long lead times, the awardee is responsible for securing necessary parts to meet the Government's required delivery schedule. (j) In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated at that time. The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary. (l) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003. Contractor determined location and method of marking is acceptable. (m) Dates listed in clauses 52.216-19 and 52.216?21 are based on the estimated award date. These dates will be revised prior to award based on the actual award date. (n) Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the remanufacture limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s). (o) In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the contractor must include a DD1348-1when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1 but will ensure DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the DD250. (p) In accordance with DAFFARS 5309.105-1 the Supplier Performance Risk System (SPRS) is checked for supplier risk assessments when determining responsibility. DFARS Sign up to see this detail(b) states that the contracting officer shall verify that the summary level score of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old, unless a lesser time is specified in the solicitation) for each covered contractor information system that is relevant to an offer, contract, task order, or delivery order are posted in Supplier Performance Risk System (SPRS). Offerors are required to represent they will implement National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 SP 800-171 (reference the provision DFARS 252.204-7008). A score of 110 must be in SPRS, if assessment score is less than 110 a contractor must submit a copy of their plan with their proposal.

More opportunities from Department Of Defense → FA8118 Afsc Pzabb

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS