Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Department Of Defense was posted on June 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Remanufacture of T-38 Defog Flow Selector

Awarded
FA8118-26-R-0020Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336413
New
Federal
CABLE ASSEMBLY,ROTA
Solicitation # N0038327QAA18
Solicitation N0038327QAA18, issued by Navsup Weapon Systems Support, is a fixed-price request for quotations for the repair, overhaul, upgrade, testing, and inspection of Cable Assembly, ROTA (NSN 1680-01-661-7957, Part Number 5217008-110). The contractor is responsible for providing all necessary facilities, labor, materials, and tooling to restore items to a Ready For Issue condition. Key technical requirements include adherence to MIL-STD-130 for markings, MIL-STD-2073 for packaging, and the use of SAE-AS22759 series wire in place of MIL-W-81381. The contractor must maintain a quality management system compliant with ISO 9001 or SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1 standards. The government will make a single award based on a trade-off where past performance is considered more important than price. Evaluation will include SPRS risk assessments for item, price, and supplier risk. Contract administration requires the use of the Wide Area WorkFlow system for invoicing and strict adherence to Commercial Asset Visibility reporting. Specific provisions are included for Beyond Economical Repair and Missing on Induction determinations, both of which require DCMA concurrence. Inspection and final acceptance will be performed by the Contract Administration Office at the contractor's facility. Quotations are due by November 30, 2026, with a delivery requirement of 90 days and an induction period of one year from the date of the order.
Navsup Weapon Systems Support

POSTED

about 5 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Department of the Air Force, through the Air Force Sustainment Center at Tinker Air Force Base, Oklahoma, has awarded a firm-fixed-price contract under a total small business set-aside for the remanufacture of the T-38 Defog Flow Selector, identified by NSN 1660007850250. This device is a pneumatic butterfly valve critical to cockpit windshield defogging, constructed from aluminum alloy and measuring 5x3x3 inches. The contract, solicited under FA8118-26-R-0020, has a basic performance period of three years with an option to extend for an additional two years, bringing the total potential duration to five years. The contract is a sealed bid procurement evaluated solely on price, with technical acceptability serving as a minimum threshold for award, consistent with a lowest price technically acceptable approach. Proposals must conform to all specified requirements, including the Statement of Work, which mandates 100% replacement of consumable parts, adherence to technical orders TO 00-5-1 and TO 00-5-3, and full traceability of parts and tools. The contractor is responsible for all labor, equipment, calibration of test instruments, and compliance with quality standards including ISO 9001:2015 and MIL-STD-130 for permanent item marking, which must include the contractor’s CAGE code and date of remanufacture. All deliveries are F.O.B. origin, meaning title and risk of loss transfer to the Government upon loading at the contractor's facility, with final acceptance occurring at the same location. Shipment must be delivered to DLA Distribution Depot Oklahoma at Tinker AFB and adhere to strict packaging and marking standards per MIL-STD-2073-1 and MIL-STD-129, including ISPM No. 15-compliant wood packaging and barcoding with NSN, contract number, and call number. Contractors must submit monthly production data through the DI-PSSS-81995A report and daily Commercial Asset Visibility (CAV) updates via a web-based system to track government-owned reusable assets. Additional reporting obligations include the Government Property Inventory Report, Production Surge Plan, and compliance with cybersecurity requirements under NIST SP 800-171 and DFARS 252.204-7012. The contract includes provisions for surge capacity,

General Info

Remanufacture T-38 Defog Flow Selector under firm-fixed-price, small business set-aside, with strict technical, quality, and reporting requirements.

Contract Value

$0

NAICS

336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing

Place of Performance

OK, USA

Set-Aside

SBA

Award Issued Date

Documents

12
PDF, High priority: read this first2 pages · amendment
High
PDF, High priority: read this first6 pages · cdrl
High
PDF, High priority: read this firstdata-item-description
High
PDF, High priority: read this first2 pages · data-item-description
High
PDF, High priority: read this first2 pages · production-surge-plan
High
PDF, High priority: read this first2 pages · data-item-description
High
PDF, High priority: read this first3 pages · data-item-description
High
PDF, High priority: read this first53 pages · ifb
High
PDF, High priority: read this first2 pages · packaging-requirements
High
PDF, High priority: read this first30 pages · sow
High
PDF, Low priority1 page · item-description
Low
PDF, Low priority2 pages · transportation-data
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Solicitation

Notice updated

Response deadline changed from Mar 4, 2026 to Mar 31, 2026. The notice description changed.

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8118 Afsc Pzabb
Contacts2 people available
OfficeTINKER AFB, OK, 73145-3303, USA

Full Description

Show more

PLEASE NOTE: Attached Amendment P00001 extends due date to 3-31-2026 at 1:00pm CST. 


REMANUFACTURE


A 5-YEAR ( 3-YEAR BASIC AND ONE 2-YEAR OPTION PERIOD) FIRM FIXED PRICE REQUIREMENTS TYPE CONTRACT IS CONTEMPLATED.


NOTE: It is anticipated that pricing of this action will be based on adequate price competition; therefore, offerors are not required to submit certified cost or pricing data at the time of proposal. However, after receipt of proposals, it is determined that adequate price competition does not exist, a request for other than certified cost or pricing data may be required in accordance with FAR 15.403-1(b)(1).  
52.232-18 Availability of Funds.  As prescribed in 32.706-1(a), insert the following clause: Availability of Funds (Apr 1984)
Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.  (End of clause)
(a)  A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required.  Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively.


(b)  The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture required to restore the end item to a like-new condition.  The contractor shall also accomplish ALL necessary packing and preservation and packaging.  ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price.  The government shall only pay the contractor for missing components after review and approval of O&A request. No additional cost will be allowed (i.e. material handling, profit, direct or indirect costs).
 
(c)  Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Tinker AFB Small Business Office. For questions regarding the Tinker SAR Process or related issues, these inquiries should be submitted to the TAFB Small Business Office at: AFSC/SB, 3001 Staff Drive, Suite 1AG 85A, Tinker AFB, OK 73145-3009.  Email: Sign up to see this detail  Website: https://www.afsc.af.mil/units/sbo/index.asp. The actual SAR package submission itself shall be submitted electronically through DoD SAFE at https://safe.apps.mil/.  DoD SAFE is a safe and secure option for large file submissions. If you have a PKI Certificate, the SAR can be sent directly to the email address below via DoD SAFE. If you do not have a PKI Certificate, then you must send a standard email message to the email address below and ask that they “Request a Drop-Off” to your email via DoD SAFE, which will enable you to be able to upload the SAR Submission Package documents to DoD SAFE.


Sign up to see this detail


For more information on the Strategic Alternate Sourcing Program, please visit: https://www.tinker.af.mil/Home/429SCMS-SASPO/


As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification.


(d)  In order to receive any technical data related to this acquisition, offerors must send an email request to Sign up to see this detail AND Sign up to see this detail .   Release of any data is subject to applicable data rights.  The request shall include the applicable solicitation number, the specific data needed (including TO(s)), and a copy of the current, approved DD Form 2345.  The form, including instructions for completing the form, is available at:  http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html.  The Government is not responsible for incomplete, misdirected, or untimely requests.**


In order to receive drawings (previously done through JEDMICS), contractors will need to request access to the A-Team via a DD Form 2875. Requests will be made to Sign up to see this detail .  The PCO listed above will be the government sponsor for the DD Form 2875.


(e) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c))
Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.


(f) END ITEMS BEYOND REMANUFACTURE
"Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable requirements. Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the overhaul limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).


(g) If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the Contractor shall promptly notify the administrative contracting officer in writing and shall not perform further on any such items except after receipt of approval from the direction of the procurement contracting officer (PCO). Upon written confirmation from the PCO that a particular item is not reparable, the contractor shall dispose of the unit in the manner directed by the PCO.


Contractors are cautioned that until a contract is executed, any effort performed in support of the anticipated effort is performed strictly at their own risk and expense. There is no authorization to begin performance until the contractor has received a duly authorized contract signed by the Contracting Officer. Also, this request for proposal is not to be construed to mean that the award of a contract is assured, as the availability of funds, timely submission of all requested documents, and acceptance by both parties are prerequisite to any contract award.


(h) Condemned units shall not be counted as production.


(i) In the event there are component part(s) with long lead times, the awardee is responsible for securing necessary parts to meet the Government’s required delivery schedule.


(j) In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated at that time.  The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary.


(k) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003. Contractor determined location and method of marking is acceptable.


(l)  Dates listed in clauses 52.216-19 and 52.216‐21 are based on the estimated award date. These dates will be revised prior to award based on the actual award date.


(m) In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the contractor must include a DD1348-1when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1, but will ensure DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the DD250.


(n) In accordance with DAFFARS 5309.105-1 the Supplier Performance Risk System (SPRS) is checked for supplier risk assessments when determining responsibility.  DFARS Sign up to see this detail(b) states that the contracting officer shall verify that the summary level score of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old, unless a lesser time is specified in the solicitation) for each covered contractor information system that is relevant to an offer, contract, task order, or delivery order are posted in Supplier Performance Risk System (SPRS). Offerors are required to represent they will implement National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 SP 800-171 (reference the provision DFARS 252.204-7008). A score of 110 must be in SPRS, if assessment score is less than 110, contractors must submit a plan with their proposal to become compliant.
 

More opportunities from Department Of Defense → FA8118 Afsc Pzabb

Same awarding agency

NAICS: 336413
Federal
NSN 4810007616225RK/47680
Solicitation # FA811827RB003
Solicitation FA811827RB003 is a total small business set-aside for a five-year firm-fixed-price indefinite delivery indefinite quantity contract for the remanufacture of C-5 and C-130 Linear Direct Valves, identified by NSN 4810007616225RK and Part Number 47680. The scope of work involves returning these aluminum alloy hydraulic fluid flow control valves to a like-new condition. The contract specifies a minimum quantity of 11 units and a maximum of 70 units over the five-year period of performance, with an ordering period extending from May 20, 2027, to May 19, 2032. Award will be based on a price-only competition, granted to the offeror with the lowest total evaluated price who meets all solicitation requirements and is an approved source. The contractor must adhere to strict quality and technical standards, including MIL-STD-130 for Item Unique Identification marking and MIL-STD-129 and MIL-STD-2073-1 for packaging and shipping. Deliveries are to be made FOB Contractor Origin to the DLA Distribution Depot Oklahoma at Tinker AFB. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and the submission of various data reports, such as Commercial Asset Visibility and Contract Depot Maintenance Monthly Production Reports. Additionally, the contract mandates CMMC Level 2 cybersecurity compliance and the implementation of a counterfeit prevention plan. Proposals are due by November 13, 2026.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

7 days ago

DEADLINE

in about 4 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS