Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity was posted on August 6, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Remodel Area "E" Room42, Bldg 1614

Closed
FA2835-15-R-0017Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238190
New
SLED
RFP 2027-10192026 School Building Exterior Inspection, Repair & Restoration
Solicitation # 2027-10192026
Shenandoah County Public Schools is soliciting proposals for a firm-fixed-price, turnkey contract to provide inspection, investigation, repair, and restoration of exterior insulation and finish systems (EIFS) for schools throughout the division, beginning with Stonewall Jackson High School. The scope of work includes moisture testing, documenting deficiencies, and the full removal and replacement of EIFS systems, including the installation of air/water-resistive barriers, insulation boards, and compatible sealants. Additional requirements cover the restoration of covered entrance vestibules, door awnings, and commercial caulking systems. All work must adhere to manufacturer specifications and the detailed requirements outlined in the solicitation attachments. Proposals are due by November 6, 2026, and will be evaluated based on experience and past performance (40 points), the proposed project schedule and ability to minimize school disruptions (20 points), and proximity to Woodstock, VA (10 points). Awarded contractors must provide comprehensive general liability and workers' compensation insurance, undergo criminal background checks for personnel, and adhere to strict non-discrimination and student privacy policies. Payment is issued net thirty days following the approval of invoices for work completed. Final acceptance is contingent upon the system being watertight and the submission of all closeout documentation and warranties.
Shenandoah County Public Schools

POSTED

about 18 hours ago

DEADLINE

in 17 days
NAICS: 238190
New
SLED
Miramar College Pool Deck Replacement And Replaster Project
Solicitation # HH26270599
The San Diego Community College District is soliciting bids for the Miramar College Pool Deck Replacement and Replaster Project under solicitation number HH26270599. The scope of work involves comprehensive repairs to the competition and recreation pools, including replastering walls and bottoms, repairing cracks at the north end, and ensuring proper drainage through the repair of perimeter slot drains. Additionally, the project requires the removal and replacement of pool deck coatings, deck and bottom tiles, and coping tiles, as well as the demolition of existing one-meter and three-meter diving board cement bases to install new diving platforms and grade beams. The project is governed by the California Uniform Public Construction Cost Accounting Act and requires compliance with Title 24 regulations and Division of State Architect oversight. Bids must be submitted electronically via the PlanetBids Portal by 2:00 p.m. on November 10, 2026. The contract will be awarded to the lowest responsive and responsible bidder who possesses a valid Class A or B license, including a C-53 Swimming Pool Contractor license. Required submission documents include a bid bond of at least ten percent of the bid amount, a site visit certification, and CARB compliance certification. Awardees must provide a baseline schedule within ten days of the Notice to Proceed and adhere to mandatory participation in an Owner Controlled Insurance Program administered by Keenan & Associates. The base bid includes a project allowance of 170,000 dollars, and the contractor is required to comply with California prevailing wage laws and certified payroll reporting.
San Diego Community College District

POSTED

1 day ago

DEADLINE

in 21 days
NAICS: 238190
New
Federal
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Solicitation # FA813727R0001
Solicitation FA813727R0001 is a firm fixed price request for proposal for the repair of structural integrity at Building 1134, Post 34, and the North Wall at Tinker Air Force Base, Oklahoma. The project scope involves repairing or replacing eroded shear braces and the base of Post 34 to prevent potential failure. This opportunity is restricted exclusively to Tinker AFB MAC BOA holders, and attendance at the initial site visit on October 22, 2026, is mandatory for eligibility to propose. Interested prime contractors must RSVP by October 20, 2026, and provide an Entry Access List for any personnel requiring base access. The estimated magnitude of the construction is between $100,000 and $250,000, with a performance period of 195 calendar days from the notice to proceed. The acquisition will be awarded based on the Lowest Price Technically Acceptable (LPTA) process, where the award goes to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. Technical evaluations will focus on capability and management, and any deficiency in a subfactor will render a proposal un-awardable. Proposals must be submitted in separate technical and price volumes, with pricing broken down by the CSI Master Format System. The contract is a total small business set-aside and is subject to the Davis-Bacon Act, Buy American Construction Materials requirements, and DFARS cybersecurity standards. Liquidated damages for delays are set at $227.75 per calendar day.
FA8137 Afsc Pzioc

POSTED

4 days ago

DEADLINE

in 28 days
NAICS: 238190
New
SLED
YAC Awning Replacement
Solicitation # 262904MKM
Sarasota County is soliciting bids for the complete replacement of an awning at the Youth Athletic Complex Baseball Field Office Building located at 2810 17th St., Sarasota, Florida, following damage from Hurricane Milton. The project involves the removal of damaged components and the fabrication and installation of a new aluminum canopy system approximately 66 feet wide by 14 feet 6 inches in projection. The contractor must provide all labor, materials, and engineering coordination, ensuring the structure meets current Florida Building Code wind load requirements and utilizes corrosion-resistant hardware suitable for coastal conditions. The successful offeror will be the responsive and responsible bidder providing the lowest total price, with a project completion deadline of 90 days after receipt of the purchase order. Qualified bidders must hold a Certified Specialty Structure, General, or Building Contractor license and provide at least two verifiable references from the last seven years. Due to grant funding requirements, local and American business preferences do not apply to this award. The contract includes strict compliance with federal regulations, including the Byrd Anti-Lobbying Amendment, the Clean Air Act, and various non-discrimination laws. Insurance requirements are comprehensive, requiring Workers' Compensation with a 50 million dollar employers liability limit and business automobile liability of at least 1 million dollars. A contingency of up to 10 percent may be allowed for unforeseen circumstances, provided the total cost does not exceed 150,000 dollars. Final payment is contingent upon final inspection approval and the provision of a minimum one-year workmanship warranty.
General Services

POSTED

5 days ago

DEADLINE

in 28 days

General Info

Agency

N/A

Contract Value

$48,618

NAICS

238190 - Other Foundation, Structure, and Building Exterior Contractors

Place of Performance

Building# 1614, Area "E" Room# 42 Barksdale Street, Hanscom Air Force Base, MA, 01731, USA

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Roger A NowickiContract Specialist
Paul D. MurphyContracting Officer

Full Description

Show more
STATEMENT OF WORK For Remodel Area E Room 42 Location Building: 1614 By: Roland Hartz WORK ORDER NUMBER: 66044 DATED: 30 July 2014 - 1. GENERAL INFORMATION: This project is intended to remodel area E Room 42 in accordance with all applicable National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the Commonwealth of Massachusetts Building Code and Massachusetts General Law requirements, state and federal codes, base standards and manufacturer's instructions. Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply. - 2. SCOPE: Remodel Area E Room 42 ( high density insulation must be used in walls) Install STC45 rated walls Prior to the start of work coordinate work schedule with the Carol Bevis, Facility Manager and Tracy Romel, Physical Security Officer Remove ceiling tiles and ceiling grid in the conference room Remove carpet in the conference room Demolish and dispose of existing west and north wall within the conference room. In addition, demolish and dispose of wall in the hall from the existing door to the hallway. Install one (1) layer of 5/8" gypsum wallboard to the remaining two walls (east and south). The installation shall be per the specifications of a STC 45 rated wall. The wall shall be finished from floor to ceiling. Construct STC45 rated walls using ASTM International Classification E413 and E90 at the location of the two demolished walls. The two new walls shall have four (4) layers of 5/8" gypsum wallboard installed instead of the three (3) specified in Chapter 3 Fixed Facility SCIF Construction. Sound attenuation material shall be of a rigid material. Walls will extend from top of floor slab to the underside of floor/ceiling above. Where wall intersects other building elements, including but not limited to ductwork, floor joists, plumbing, electrical etc. gypsum board shall be fitted to maintain the STC rating of the wall. Seal all joints and penetrations with appropriate acoustical sealant. The contractor shall install all conduit within the walls (both new and existing) and pull all wires through the conduit for electrical, (data and communication by others) Prime and paint walls 1 coat primer and 2 finish color to match existing in area Install new carpet tiles and cove base (color TBD) Install new ceiling and grid in room Install Overly Vault door 3-0' x 7-0' with STC rating of 52/ with door closer and handle, install lock set supplied by customer Install wood trim around frame on both sides of door to match existing adjacent doors HAFB Environmental Contractor guide must be followed ** Door and lock must be installed by GSA certified locksmith, all workers must be US Citizens and provide proof of citizenship ** ** Hours of operation are 0630- 1830** - 3. GENERAL REQUIREMENTS: Work includes, but is not limited to the following: - a. Provide resolutions of any technical problems that arise during the construction. - b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work. - c. Provide updates to Project POC. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates. - d. The Contractor is solely responsible for compliance with the Occupational Safety and Health Act of 1974 (OSHA) and the protection of their employees and all sub-contractor employees. In performing work under this contract on a Government installation, the contractor shall report any accidents involving Air Force property/equipment damage, or contractor personnel injuries occurring on the job or an accident resulting in death, injury, occupational disease, or adverse environmental impact to the contracting officer within five days." - e. Provide three (3) copies of O & M manuals and warranty letter - f. Period of Performance shall be 120 day after contract award - 4. ADMINISTRATION: Points of Contact (POC): Lead: Roland Hartz Phone Number. (781) 225-2951 Alternate POC: William Neice Phone Number. (781) 225-6157

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS