This Combined Synopsis/Solicitation opportunity from Department Of Justice was posted on February 3, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Removal and Install of Transformer at FCI Three Rivers

Closed
15B51621Q0000007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334416
New
DIBBS
SHIELDING GASKET, ELECT
Solicitation # SPE7M5-27-T-1160
Solicitation SPE7M5-27-T-1160 is issued by the DLA Weapons Support Active Devices Division for the procurement of 43 electronic shielding gaskets, identified by NSN 5999-01-167-4704. The items must be produced in accordance with specific technical data packages and drawings, including Basic Drawing 18876 13092455 and Reference Drawing 18876 MIS-35351. Delivery is required by March 31, 2027, with a delivery period of 151 days, and the FOB point is designated as Origin. The place of performance is New Cumberland, Pennsylvania. The contract mandates strict quality and security compliance, requiring manufacturer inspection systems to meet SAE AS9003 or ISO 9001 standards. It incorporates several high-level quality requirements, including DLA packaging standards (RP001), configuration change management (RQ002), and origin-based inspection and acceptance (RQ009). Due to the nature of the technical data, the contract is subject to ITAR and EAR export controls, and requires contractors to have approved US/Canada Joint Certification Program certification. Additionally, the contract enforces cybersecurity standards via CMMC Level 2 and DFARS 252.204-7012 for safeguarding covered defense information. Administrative requirements include electronic invoicing through the Wide Area WorkFlow (WAWF) system and adherence to the Buy American Act and Berry Amendment for domestic sourcing. A price evaluation preference is available for certified HUBZone small businesses. All quotations must be submitted via the DLA Internet Bid Board System (DIBBS) by October 30, 2026. Packaging must comply with MIL-STD-129, with specific requirements for hazardous materials per FED-STD-313 and TQ requirement IP025.
DLA WEAPONS SUPPORT ACTIVE DEVICES DIVISION

POSTED

1 day ago

DEADLINE

in 10 days

General Info

Contract Value

$74,342

NAICS

334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing

Place of Performance

Three Rivers, TX, 78071, USA

Set-Aside

SBA

Award Issued Date

Documents

2

SCR+Apprd+SOW+5D5K+Repl+Transformer+Med-SHU_2-1-21_1.pdf

PDF

Solicitation-Transformer+5D5K.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Justice → Fci Three Rivers
Contacts2 people available
OfficeTHREE RIVERS, TX, 78071, USA
Office AddressTHREE RIVERS, TX, 78071, USA

Full Description

Show more
DESCRIPTION OF SERVICES SCOPE: The contractor shall provide all personnel, equipment, tools, materials, supervision, ,storage containers, vehicles, equipment, radios, furnishings, tools, rental equipment, etc., and other items and services necessary to perform a removal of a transformer (KV A 500 65 C 60hz, CP SER 043701939, CAT 003K2P11X75A, HV1247OGY/7200 KNAN, LV 480Y/277) and replacement with a new one. REQUIREMENTS: The contractor will perform the following: 1. Remove the existing 500kVA, 4801277v pad mount transformer (TC) that is currently leaking oil and place in a predetermined location as decided by the Facility Manager for possible reconditioning at a later date. Install a new 500kV A, 4801277v, live-front loop feed transformer which utilizes FR3 oil. If the current pad is not sufficient in size or does not meet required structural integrity standards, it will be the contractor's responsibility to replace the pad. Reconnect the existing primary cable and secondary wire. If needed, contractor will supply adequate cable size and splice kits to ensure sound connection. 2. A crane will be required to set the transformer from outside of the fence due to the distance and weight of the transformer. A 500kW, 480-volt temporary generator and fuel to serve the buildings that are fed by the transformer for the duration of the work will also be required. The contractor will ensure that all buildings within the FCI have power throughout the project with only minimal interruptions to daily operations. The medium voltage (lMG) generator that is on site currently may be utilized in order to back up the medium voltage loop at Transformer TG. If this is necessary the c_ontractor will be required to do the disconnect from the switchgear and connect to the new source and upon completion reconnect the generator to the switchgear located at the powerhouse (bldg. N). 3. The Government will provide fuel for the generator that is current! y on site. With these two generators in use during the work there should only be a short outage to remove the existing feeders and tie in the temporary generators. A start up/ commissioning test will be required on the new transformer to ensure proper rotation and proper connections. We require a minimum one-year full warranty. 4. A pre-bid site visit can be arranged to gather information about the equipment and its location and to inspect the condition of the pad. Proper lockout/tagout procedures will be discussed and approved at the pre-construction meeting and all relevant safety regulations will be adhered to at all times. Due to Covid-19 concerns masks and temperature checks may be required by the institution. RESPONSIBILITIES 1. The Contractor shall provide all required personnel, necessary tools, supplies, materials, equipment, and transportation required to accomplish this contract in accordance within the Statement of Work. Hours of operation shall be 6:00 a.m. to 4:00 p.m. Monday through Friday, excluding Federal Holidays. To accomplish this activity, the contractor shall comply with the following:. 2. The Contractor shall not interfere with regularly scheduled Federal Bureau of Prisons (FBOP) daily operational activities. Contractor shall be responsible for protection of government property during course of work. Paved areas and buildings shall be protected from damage. Repair damage at no cost to FBOP. Removal of all old parts and debris from the FBOP. PERFORMANCE: The contractor is required to complete all required tasks to fulfill their contractual obligations and relinquish possession of the engine within 30 days of acceptance. QUALITY ASSURANCE: Hold a pre-installation conference at the jobsite before the work begins. Include the following. 1. The conference shall include the FBOP site Contracting Officer, Contract Monitor. 2. After installation is complete. Conduct a complete and thorough generator test to insure proper working order. 3. Provide certifications and warranty. 4. The Contracting officer is the only person authorized to make changes of this contract. CERTIFICATIONS and WARRANTY Generator shall have a minimum 1 year warranty from the Substantial Completion date. The warranty shall provide the FBOP with a single entity to resolve any issues that are traceable to the generator rebuild and other possible rebuild issues in the warranty. GOVERNMENT-FURNISHED PROPERTY AND SERVICES: The government will furnish the fuel for the generator. REQUIREMENTS: CRIMINAL BACKGROUND CHECKS. Contractor shall have a criminal background check performed on all of their employees prior to working on the installation. National Crime Information Center (NCIC) background checks are required by Federal Bureau of Prisons for the performance of this contract. All Contractor personnel working for the FBOP on the FCI at Three Rivers must have a completed background check prior to being on the property. These checks shall be accomplished prior to the first day of performance. Background checks will be conducted by the government. PERSONNEL. The Contractor shall provide a work force possessing the skills, knowledge, and training to satisfactorily perform the services required by this contract. Personnel performing work under this scope of work shall remain employees of the Contractor and will not be considered employees of the Government. SEARCH AND SEIZURE. Contractor personnel and property shall be subject to search and seizure upon entering the confines of the Federal Installation while on the Compound, and upon leaving the confines of the institution. VEHICLE REGISTRATION. Contractor vehicles entering Three Rivers Institution shall have a valid State license, registration, safety inspection, and insurance shall be maintained current during the time the vehicle is in use on the institution. CONFLICT OF INTEREST. The Contractor shall not employ any person who is an employee of the United States Government or the Department of Justice. ACCIDENT REPORTING. The Contractor shall maintain an accurate record of accidents resulting in injury or death, and accidents resulting in damage to government property, supplies, and equipment. The Contractor shall report accidents in accordance with the requirements indicated. The Contractor shall comply with the Occupational Safety and Health Act. Contractor personnel shall wear Personal Protective Equipment (PPE) required by the Occupational Safety and Health Administration (OSHA) during the performance of tasks requiring protective equipment or clothing. LAWS. The Contractor shall comply with all local state, and federal laws and regulations that control any work performed. The Contractor shall comply with and keep informed of any changes to these laws and regulations throughout the period of the contract. The Contractor is a recognized professional in his area and is expected to be knowledgeable of all laws and regulations pertaining to his profession. HAZARD WASTE. The Contractor is responsible for complying with all local, state, and Federal laws or regulations involving disposal of waste products and containers to include hazardous waste in accordance with applicable regulations and other documentation. INSPECTION AND ACCEPTANCE. Services performed under this contract are subject to inspection by the Government. The Contractor shall promptly correct unsatisfactory service at no additional expense to the Government.

More opportunities from Department Of Justice → Fci Three Rivers

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS