Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Homeland Security was posted on July 17, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Removal of old HVAC and installation of new HVAC unit

Closed
20290PR230000235Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332999
New
DIBBS
SPACER, SLEEVE
Solicitation # SPE4A7-27-R-X068
Solicitation SPE4A7-27-R-X068 is an Indefinite Delivery Purchase Order issued by the DLA Weapons Support ASC for the procurement of 124,000 sleeve spacers, identified by NSN 5365-01-034-2519. The contract is not a small business set-aside and is intended to span five base years or until an aggregate total of 350,000 dollars is reached. Pricing should be based on an estimated annual quantity of 125 units, with minimum delivery orders of 75 and maximums of 201. Delivery is required within 200 days after receipt of order to various CONUS stock locations, with inspection and acceptance occurring at the destination. The award will be based on best value, with a significant emphasis on past performance, specifically SPRS assessments and historical quality and delivery compliance. Technical requirements are governed by the DLA Master List, and sampling must follow MIL-STD-1916 or ASQ H1331. Packaging must adhere to ASTM D3951 and MIL-STD-129, with palletization following RP001. Due to the presence of controlled unclassified information, contractors must obtain CMMC Level 2 certification and upload it to the SPRS by November 10, 2026. Additionally, the item is subject to ITAR or EAR export controls, requiring approved JCP certification and specific DLA training for access to technical data. Invoicing and payment must be processed through the Wide Area WorkFlow system.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 3 hours ago

DEADLINE

in 8 days
NAICS: 332999
New
Federal
Request for Information: Additive Manufacturing
Solicitation # N0010427RZ058
The Naval Supply Systems Command Weapon Systems Support is conducting market research through Request for Information N0010427RZ058 to identify qualified sources capable of designing, producing, and delivering piece part components or entire assemblies using additive manufacturing methods. The government is specifically interested in vendors who can meet rigorous manufacturing, material, performance, testing, and quality assurance requirements. While the current focus is on a candidate list of National Item Identification Numbers for valves, actuators, and manifolds, the government anticipates that Level I and SUBSAFE items may become eligible for additive manufacturing in the future. Interested businesses must provide detailed administrative data, descriptions of their manufacturing capabilities, facility certifications such as ISO 9001 or AS9100, and evidence of past performance with similar military or commercial hardware. Additionally, the government is soliciting industry feedback on the development of objective evaluation criteria and the structuring of performance-based incentives for future Firm-Fixed-Price contracts. All produced components must be fully interchangeable with traditionally manufactured equivalents and strictly adhere to the baselines established in Project Peculiar Document 802-8436658. Responses are due by October 22, 2026.
Navsup Weapon Systems Support Mech

POSTED

about 8 hours ago

DEADLINE

in 13 days

General Info

NAICS

332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing

Place of Performance

McClellan, CA, 95652, USA

Set-Aside

NONE

Documents

1

SOW - HVAC Installation Building 1102 (USCG Air Station Sacramento)

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → 11TH Coast Guard District Office
Contacts2 people available
OfficeALAMEDA, CA, 94501, USA

Full Description

Show more
STATEMENT OF WORK Removal of old HVAC and installation of new HVAC unit For building #1102 (MK SHOP) USCG Air Station Sacramento 1.0 GENERAL REQUIREMENTS 1.1 PROJECT DESCRIPTION MK Shop HVAC is not operational, and unit needs to be removed and disposed of for building 1102 MK Shop. New 5 ton, 3 phase, heat pump unit needs to be delivered, installed, and tested for correct function. Contractor will verify specifications. 1.1.1 Technical Point of Contact (POC): MKC Art Castaneda (916-643-7645) LT James Duhamel (916-643-7684) 1.2 LOCATION 1.2.1 Work to be conducted at USCG Air Station Sacramento. 6037 Price Ave McClellan, CA 95652 Building #1106 1.3 AIR STATION AND LOCAL REGULATIONS 1.3.1 The work site is on Government property. All rules and regulations issued by the Commanding Officer covering safety, vehicle operation, and sanitation must be always observed by the Contractor and his employees. 1.3.2 All personnel employed on site shall keep within the limits of the work and shall not enter any restricted area unless required or escort by a unit member. The Contractor's equipment shall be conspicuously marked for identification. 1.3.3 The Contractor shall control its employee's traffic on site. Parking for workers shall be at a suitable location as directed by the Technical POC. 1.3.4 The Contractor shall coordinate work with the technical POC to minimize any disruption to normal unit operations. 1.4 DAMAGE TO GOVERNMENT PROPERTY 1.4.1 Any damage caused to Government or private property shall be corrected at the Contractor's expense. 1.5 SAFETY AND SECURITY 1.5.1 The Contractor shall provide all necessary safety equipment to protect the work site area. All work shall be performed in accordance with O.S.H.A. Safety standards to prevent injury to housing occupants, by-passers, or workforce. 1.5.2 Contractor shall comply with Federal and State of California safety and health regulations. When standards differ, the more stringent shall apply. All accidents and property damage shall be reported to the Technical POC. 1.5.3 The Contractor shall be responsible for the security of their material, tools, and equipment. The Government shall not be responsible for their loss. 1.5.4 The Contractor shall comply with all rules and regulations issued by the National Fire Protection Association covering the use and storage of flammable mixtures or material which might constitute a fire hazard. 2.0 EQUIPMENT 2.1 Contractor shall provide whatever equipment necessary to complete the inspection and service of unit boilers. 3.0 SCOPE OF WORK 3.1 Provide all labor, equipment, and materials, to complete the removal of old HVAC unit, installation, and testing of new 5-ton HVAC unit at building #1102 to include: 1. Lock/Out tag out of power source 2. Disconnect old unit power source and lines 3. Clean any old lines and parts that will stay in place 4. Update electrical components as needed (Thermostat, disconnect switch, etc) 4. Install new 5-ton 3 phase AC and Electrical heat unit 5. Check for leaks (ventilation and refrigerant) 6. Ensure HVAC unit is functioning correctly. (Heating and cooling) 7. Adjust and correct any discrepancies found 8. Remove and dispose of old HVAC unit 3.2 Contractor after inspection shall do a complete test and check for leaks and check for proper operation. 3.3 Services shall be accomplished between the hours of 0800-1530, Monday-Friday, not to include federal holidays except as designated by the contracting officer or official representative. 3.4 The Contractor shall coordinate with the technical POC to schedule a date and time for project commencement. 3.4.1 Project is to be completed within 07 days of the contract being awarded or as soon as parts arrive. 3.5 The government shall use a 100% surveillance method. Inspection of work shall be performed at the time the Contractor is at the site performing its services and prior to contractor leaving the site. 3.6 The Contractor shall remove all debris, rubbish, and hazardous waste from the job site. 3.7 The Contractor shall keep the Contracting Officer and /or technical POC fully informed on the daily progress of the work, from the start through completion of this inspection. 3.8 Unsatisfactory performance shall result in work being re-accomplished at no cost to the government. 3.9 It is the contractor's responsibility to verify all measurements/dimensions listed above prior to submitting a quote/proposal. 3.10 Point of contact is MKC Art Castaneda (626-497-6000). POC email all quotes to ATTN Gary Agan (916) 643-7678 Gary.C.Agan@uscg.mil Christopher Bahn Christopher.A.bahn@uscg.mil

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS