Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity was posted on December 30, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Removal, Test and Disposal of approx. 1400 cubic yards contaminated soil

Closed
SLAC_Contaminated_Soil_RemovalFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project, necessitated by a sprinkler system failure, requires the remediation of mold throughout the entire building and the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA guidelines, and OSHA regulations, with Indiana state laws prevailing if they are more stringent. Key deliverables include the provision of a Certified Industrial Hygienist, a detailed mold remediation plan featuring HEPA filtration and negative air pressure, and a one-year workmanship guarantee. The contract is awarded on a best-value basis, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal with a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Indiana Contractor's License. Mandatory requirements include attendance at the site pre-bid walk-through and the provision of specific insurance coverages, including automobile liability and workers compensation. Performance must begin within 14 days of the Notice to Proceed, and the contractor must adhere to Davis Bacon Act wage determinations. Payment terms are Net 30.
Atterbury Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in 10 days

General Info

Agency

N/A

NAICS

562910 - Remediation Services

Place of Performance

2575 Sand Hill Rd, MENLO PARK, CA, 94025, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Stephanie PinkertonProcurement Specialist

Full Description

Show more
This notice is posted to identify potential sources for the described acquisition. It is not a solicitation and any provided proposal shall be disqualified upon receipt. Enter interest in Interested Vendor tab This planned acquisition may result in the award of a contract to remove a total of approximately 1400 cubic yards of contaminated soil and sediment from two drainage channels at the SLAC National Accelerator Laboratory (SLAC) in Menlo Park, California. This removal action (RA) is in accordance with Order No. R2 2009 0072 (Order) adopted in October 2009 for the United States Department of Energy (DOE) and Stanford University (Stanford) by the San Francisco Bay Regional Water Quality Control Board (Water Board). Chemicals of potential concern, or COPCs in the channels were identified in Remedial Investigation Reports (RIs) and confirmed in Baseline Risk Assessments (BRAs). The identified COPCs for soil in the channels include polychlorinated biphenyls (PCBs) and Copper and Zinc The Subcontractor shall be responsible for preparation, planning, scheduling, managing, and safely implementing the following: - a Storm Water Pollution Protection Plan (SWPPP); - a project specific health and safety plan (HSP), including traffic control plan - A project work and excavation plan - completion of SLAC provided facility specific training - proof of OSHA-40 Hour Hazwoper and OSHA construction training (i.e., competent person) - proof of heavy equipment training - diversion system for water around the excavation work areas - soil excavation, and off-site disposal at permitted disposal sites; - protection of certain marked trees during excavation activities - stockpile management, if need; - imported fill procurement, testing, delivery, and placement in accordance with specifications; - dust control; - site restoration, including grading, erosion control, re-vegetation, and tree replacement in accordance with technical specifications; and, - surveying for temporary horizontal and vertical control. The RFP for this work, pending funding approval, will be issued in March 2017 with work to begin in the beginning of June 2017.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS