Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

Remove and Install Vinyl Composite Tile (VCT) Flooring BLDG 1001

Active
W911SG26RA011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the removal and installation of durable vinyl composite tile flooring in nine designated rooms within building 1001 at Fort Bliss, Texas. The scope includes demolishing the existing flooring, responsibly disposing of materials per environmental guidelines, preparing the concrete subfloor, and installing new vinyl flooring totaling approximately 1,500 square feet across rooms of varying sizes. Additionally, a 4-inch vinyl base with toe is to be installed throughout all specified rooms. The contractor is responsible for relocating all furniture necessary to complete the flooring removal and installation process. This solicitation, issued by the Department of Defense under solicitation number W911SG26RA011, is set aside as an 8(a) competed opportunity, with a response deadline of June 17, 2026. The project falls under NAICS code 238330, related to flooring and tile work. The primary point of contact for the project is Charles D. Johnson, with Shawn Munro as the secondary contact, both reachable via provided email addresses and phone. The work is to be performed at Fort Bliss, Texas, under the administration of the W6QM MICC-FT Bliss office.

General Info

Remove and install 1,500 sq ft vinyl tile flooring and base in nine rooms at Fort Bliss.

Agency

Department Of Defense → W6QM Micc-Ft Bliss

NAICS

238330 - Flooring ContractorsView NAICS

Place of Performance

Fort Bliss, TX, 79916, USA

Set-Aside

8A

Documents

(11)

Amendment 0002 to Solicitation W911SG26RA011

PDFamendment

SOW Installation of Vinyl Composite Tile and Painting of Door Trims Building 1001 Fort Bliss

PDFsow

Site Visit Sign-In Sheet for Solicitation U911SG26RA011

PDFsign-in-sheet

Solicitation W911SG26RA011 Remove and Install Vinyl Composite Tile at Ft. Bliss

PDFifb

SOW Installation of Vinyl Composite Tile and Painting of Door Trims Building 1001 Fort Bliss

PDFsow

Wage Determination TX20260245 for El Paso County Building Construction

TXTwage-determination

RFI for Solicitation W911SG26RAO11 - Asbestos and Flooring Questions

DOCXrfi

SOW Installation of Vinyl Composite Tile and Painting of Door Trims Building 1001 Fort Bliss

PDFsow

Drawings++BLDG+1001.pdf

PDF

Amendment 0001 to Solicitation W911SG26RA011

PDFamendment

Drawings++BLDG+1001.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseSolicitation
Amendment 2

Contract was updated

Amendment 0

Contract was updated

Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc-Ft Bliss
Contacts2 people available
OfficeFORT BLISS, TX, 79916-6812, USA
Organization / Agency
Department Of Defense → W6QM Micc-Ft Bliss
Office AddressFORT BLISS, TX, 79916-6812, USA
Contacts

Full Description

Show more

The project consists of removing the current flooring and providing durable, long-lasting vinyl flooring for high- traffic areas within rooms 114, 115,116, 117, 118, 119, 120,122, and 124 located in building 1001. The work includes demolition of existing flooring, proper handling and disposal of materials in accordance with environmental requirements, preparation of the concrete subfloor, and installation of new flooring. Replacement includes 4” inch vinyl base with toe throughout all designated rooms. Install new vinyl flooring in eight (8) rooms measuring 11 ft X 16 ft and one (1) room measuring approximately 12 ft X 37 ft (approx. 1,500 sq ft total for all rooms). Contract is responsible for moving all furniture as required for flooring removal and installation.

Similar Contracts