Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Remplacement de l'enveloppe extérieure (phase 5), Polyvalente des Baies de Baie-Comeau

Closed
20141058International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238170
New
Federal
Youghiogheny Resource Managers Building Siding Replacement
Solicitation # W911WN26QA059
The U.S. Army Corps of Engineers, Pittsburgh District, is set to replace the exterior siding on the Resource Managers Office building at Youghiogheny River Lake in Confluence, Pennsylvania. The existing T1-11 plywood siding and asphalt-saturated fibrous sheathing will be fully removed and replaced with a new exterior wall assembly consisting of APA-rated structural wood sheathing, a continuous weather-resistive barrier, 3/8-inch preservative-treated wood furring strips spaced no more than 16 inches on center, and 5/16-inch fiber cement lap siding. The new assembly is designed to match the existing wall thickness of approximately 1-1/8 inches to ensure compatibility with current window and door openings, which will not be relocated or modified. All trim elements must be fiber cement, and the balcony handrail will be replaced with capped PVC or composite decking matched to the new siding color. Proper flashing, including Z-flashing and kick-out flashing, must be integrated into the weather-resistive barrier to maintain a continuous drainage plane, with all fiber cement siding edges properly supported by framing or blocking per manufacturer specifications. The building’s timber-frame structure and concrete foundation will remain intact, with work focused exclusively on the exterior cladding system. The project must be completed within 180 days of receiving written notice to proceed and is solicited as a 100% small business set-aside under NAICS code 238170, with a size standard of $19 million in annual revenue. The solicitation, identified as W911WN26QA059, will be issued on or about August 19, 2026, via the Procurement Integrated Enterprise Environment (PIEE) and posted on SAM.gov, with no hardcopies available. Interested contractors must be registered in both the System for Award Management (SAM) and PIEE with the Proposal Manager role, maintaining active status throughout the bidding and award process. Registration in SAM requires entity validation and can take up to ten business days to activate, and must be renewed annually. Additional registration steps for PIEE include creating a user account, assigning roles, and providing a CAGE code and justification. Questions regarding the solicitation should be directed to Aaron Barr or Connie L. Ferguson at the Pittsburgh District office.
W072 Endist Pittsburgh

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 238170
New
SLED
FY27 NE Kirksville Maintenance Building Metal Siding Project
Solicitation # MODOT 0000000395SL
The Missouri Department of Transportation (MoDOT) is soliciting bids for the FY27 NE Kirksville Maintenance Building Metal Siding Project, identified by solicitation number MODOT 0000000395SL. The project involves the removal of existing vinyl siding and the installation of new 26-gauge prefinished metal siding at the Kirksville Maintenance Building in Missouri. Bids must be submitted by September 17, 2026, through MissouriBUYS or via physical delivery through mail, UPS, or FedEx. Bidders intending to submit hard copies must notify the buyer, Logan Wilbers, via email five business days before the closing date. Attendance at a site visit is mandatory for any bid to be accepted. The contract emphasizes strict adherence to technical specifications and administrative procedures. Key requirements include the submission of an initial project schedule within 15 days of the Notice to Proceed and the delivery of operation and maintenance manuals in specific binder formats. Contractors are responsible for providing product data, shop drawings, and samples for review, as well as delivering spare parts and transferable warranties prior to final payment. Final acceptance by MoDOT is contingent upon the completion of all punch list items and the submission of all closeout documentation within 30 days of project completion, with failure to comply potentially leading to debarment.
MODOT TRANSPORTATION

POSTED

4 days ago

DEADLINE

in 27 days

AI Contract Overview

Show more

The contract pertains to the replacement of the external envelope, Phase 5, at the Polyvalente des Baies de Baie-Comeau, requiring the full installation of composite metal panel cladding in accordance with industry standards. This includes the supply and installation of all materials, labor, tools, equipment, and services necessary to complete the work, encompassing the cladding panels themselves, the framing system with thermal break connectors, continuous and discontinuous subpURLs, secondary framing, and furring. Additional scope includes thermal insulation blocks and strips, specialized trim profiles for openings such as windows and doors, sealing mastics and joint primers, wall cavity partitioning sheathing where required, flashing, and all auxiliary components. Any elements not explicitly shown in the drawings but essential to completing the work as intended, in compliance with contractual documents and industry practices, are also included. The contractor is responsible for developing complete shop drawings at their own expense to supplement the general drawings provided, ensuring full technical compliance and proper execution. The solicitation, issued under number 20141058 by the Centre de services scolaire de l'Estuaire, a federal agency under the Government of Canada, has a response deadline of June 4, 2026, and is classified under NAICS code 238170 for specialized trade contractors. The work is to be performed at the site in Côte-Nord, with Dave Murphy serving as the primary contracting authority.

General Info

Complete metal composite panel cladding installation for Polyvalente des Baies exterior, includes supply, labor, drawings.

Agency

Government of Canada → Centre de services scolaire de l'Estuaire

NAICS

238170 - Siding ContractorsView NAICS

Place of Performance

Côte-Nord, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Centre de services scolaire de l'Estuaire
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Centre de services scolaire de l'Estuaire
Office AddressN/A
Contacts
Murphy DaveContracting Authority

Full Description

Show more
PORTÉE DE LA SECTION .1 Les Travaux de la présente section comprennent la fourniture de tous les Produits, de la main d’oeuvre, des outils, des équipements et des services requis pour effectuer l’exécution complète des Travaux de mise en oeuvre du bardage en panneaux métalliques composites, selon Règles de l’art. Ces Travaux comprennent, sans s’y limiter : .1 Le bardage de panneaux métalliques composites; .2 L’Ossature de bardage incluant les connecteurs à rupture thermique, les sous-entremises discontinues, les sous-entremises continues, l’ossature secondaire, les fourrures; .3 Les blocs et les rubans d’isolation thermique; .4 Les garnitures, profilés spéciaux de raccordements à la tête, aux jambages et aux bavettes des ouvertures telles que les persiennes et les portes; .5 Les mastics d’étanchéité et les fonds de joints nécessaires pour compléter l’ouvrage; .6 Les tôles de compartimentation des vides de construction des murs extérieurs, lorsque requis; .7 Les solins; .8 Les accessoires; et .9 Tous les éléments qui, bien que non spécifiquement décrits aux Dessins ou aux Devis, sont nécessaires pour compléter l’Ouvrage selon l’esprit des Dessins, conformément aux exigences des Documents contractuels et aux Règles de l’art. .2 Les Dessins contiennent des détails généraux qui servent de guide et de référence pour les principales exigences en matière de Travaux de la présente section. L’Entrepreneur-spécialisé doit donc compléter les Dessins en élaborant, à ses frais, des Dessins d’atelier complets conformément aux prescriptions de la présente section.