This Solicitation opportunity from New York was posted on July 2, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Repair And Bridge Construction At Pond No. 3 Dam

Closed
DPW 2025-002State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves repair and reconstruction work at Pond No. 3 Dam, located in all counties within New York State. The scope includes filling voids in the existing rubble masonry spillway abutments with urethane grouting and repointing deteriorated mortar joints to ensure structural integrity. Additionally, the project encompasses demolishing the existing bridge and part of the abutments, preparing a concrete surface over the existing abutments, and constructing a new precast plank bridge. The work also involves paving the roadway, installing new timber guide rails and bicycle rails, and removing any existing railing systems such as concrete posts, pipe rails, and stones within the project area as specified in the plans. The contract is set for a duration of 120 days, with a due date for responses on July 29, 2025, and a pre-bid meeting scheduled for July 8, 2025. The project is not set aside for service-disabled veteran-owned businesses and is open to all qualified entities, with a contract value estimated between $500,000 and $2,000,000. The primary contact for the project is John Ledwith, Building & Land Use Officer of the Tuxedo Park Village, New York.

Documents

3
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstspecifications
High
PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York → Tuxedo Park, Village of
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
John LedwithBuilding & Land Use Officer

Full Description

Show more
REPAIR AND BRIDGE CONSTRUCTION FOR POND NO. 3 DAM  The repair work includes filling the voids in the existing rubble masonry spillway abutments with urethane grouting and repointing the deteriorated mortar joints. The replacement work of the bridge includes demolition of the existing bridge, demolition of part of the abutments, preparing a concrete surface over the existing abutment, construction of a new precast plank bridge, roadway pavement and addition of new timber guide and bicycle rails.  The work will also include the removal of any existing  railing system (concrete posts, pipe rails and stones) located within the project area as indicated on the plans. Service-Disabled Veteran-Owned Set Aside: No Due date:07/29/2025 11:30 AM Pre-bid meeting July 8, 2025 at 12 pm Contract term: 120 days County(ies): All NYS counties Location: Wee Wah Rd. Business entities awarded an identical or substantially similar procurement contract within the past five years: None

More opportunities from New York → Tuxedo Park, Village of

Same awarding agency

NAICS: 237110
New
SLED
Tuxedo Park Water Treatment Plant Clearwell Upgrades
Solicitation # 2140493
The Village of Tuxedo Park is soliciting bids for the Water Treatment Plant Clearwell Upgrades (Contract No. DPW 26-04) located at 1 Chastellux Lane, New York. The primary objective of the project is to increase disinfection effectiveness by installing baffles in two rectangular clearwells to reduce hydraulic short-circuiting. The scope of work includes the installation of baffles, concrete crack repairs and sealing on a time and materials basis, and modifications to influent piping and effluent valves to allow for complete isolation. Additionally, the contractor must upgrade the chlorine feed system to be flow-paced via an ultrasonic flow meter, update pump and controller hardware, and modify the plant control program. A bid-alternate is also included for the furnishing and installation of filter backwash pumps. The project requires strict operational continuity, as the water treatment plant must remain online throughout the process, with only one clearwell out of service at a time and a maximum single shutdown of four hours for control upgrades. Work must commence by April 1, 2027, and be completed within 45 days, with a final deadline of May 17, 2027. Bids are due by December 9, 2026, at 10:30 AM, and will be awarded to the lowest responsible bidder based on price, technical compliance, and experience. The contract mandates a 2.00% Service-Disabled Veteran-Owned Business (SDVOB) goal and requires compliance with New York State prevailing wage laws and registration with the NYS Department of Labor. Performance and payment bonds, as well as certificates of insurance, are required upon award.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 30 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS