This Pre-Solicitation opportunity from Department Of Defense was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Repair & Maintain Airfield Stormwater System Phase II
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the Repair & Maintain Airfield Stormwater System Phase II at Dobbins Air Reserve Base in Marietta, Georgia, targeting stormwater drainage infrastructure east of Taxiway J and within basins III, IV, and V. The work involves regrading failed or disturbed slopes to restore positive drainage, applying sod for stabilization, cleaning existing flumes, pipes, and swales, and installing new concrete flumes at designated locations to prevent erosion and standing water. All activities must comply with project specifications and drawings, and the contract is structured as a Firm-Fixed-Price type with a total estimated value between $10 million and $25 million. The performance period is set at 420 calendar days, with all work to be performed on-site at Dobbins ARB. The solicitation is a 100% small business set-aside under NAICS code 237110, requiring offerors to maintain active SAM registration and provide Bid, Payment, and Performance Bonds. The contracting office, the 94th Contracting Flight under the Department of Defense, will oversee the work, with Kevin Song as the primary point of contact and Kenneth J. Jacob as the alternate. Proposals must be submitted electronically via SAM.gov by July 7, 2026, and the full Request for Proposal, including technical specifications, evaluations, and special requirements, will be released on or around May 18, 2026. No COR or COTR has been designated, and while certain administrative and compliance requirements are outlined, detailed evaluation factors, inspection criteria, packaging standards, and special contract clauses remain pending release in the official solicitation.
General Info
Agency
NAICS
Place of Performance
Marietta, GA, 30069, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
While not all inclusive, this project encompasses the work necessary to repair the stormwater drainage systems east of Taxiway 'J' on Dobbins ARB. Areas where the slopes have failed or where they have been disturbed from previous repairs will be regraded and have sod applied to obtain stabilization and positive drainage. Work shall include all maintenance items identified in basin III, IV, and V on the airfield. In addition to the work associated with correcting the grades around the airfield, the cleaning of existing flumes, pipes, and swales is required to reestablish proper drainage patterns. New concrete flumes will be installed at various locations throughout the airfield to reestablish positive drainage and prevent future erosion and standing water.
More opportunities from Department Of Defense → FA6703 94TH Contracting Flight Pk
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
