Repair & Maintain Airfield Stormwater System Phase II
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract for Repair & Maintain Airfield Stormwater System Phase II, solicitation number FGWB21000AB_3, is a Firm-Fixed-Price procurement issued by the Department of the Air Force, Air Force Reserve Command, 94th Contracting Flight at Dobbins Air Reserve Base in Marietta, Georgia. The project scope requires comprehensive rehabilitation of stormwater drainage infrastructure east of Taxiway 'J' and within basins III, IV, and V across the airfield. Work includes regrading eroded or previously disturbed slopes, applying sod for stabilization, cleaning existing swales, pipes, and flumes to restore proper drainage, and installing new concrete flumes at multiple locations to eliminate standing water and prevent future erosion. All materials, equipment, labor, supervision, and incidentals must be provided by the contractor, with performance strictly adhering to specifications and drawings to be released with the formal solicitation. The contract is a 100% small business set-aside under NAICS code 237110, with a small business size standard of $47 million and no foreign participation permitted. All offerors must maintain an active, unexpired registration in the System for Award Management (SAM) to be eligible for award. The period of performance is 420 calendar days, with proposals due by 2:00 p.m. Eastern Standard Time on August 10, 2026, submitted electronically via SAM.gov. The estimated contract value ranges between $10 million and $25 million. Bonding requirements include bid, payment, and performance bonds. The primary point of contact is Contract Specialist Kevin Song, reachable at (678) 655-3695 or kevin.song@us.af.mil, with Mr. Kenneth Jacob as the alternate contracting officer. The contracting office is located at 94th Contracting Squadron, 1538 Atlantic Ave., Dobbins ARB, GA 30069. Full solicitation documents including specifications and drawings will be posted on or about July 9, 2026, and paper copies will not be distributed. The contract is subject to definitization of equitable adjustments for change orders under RFO 36.101-4, and all work must comply with federal acquisition regulations and Department of Defense standards.
General Info
Agency
NAICS
Place of Performance
Marietta, GA, 30069, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
While not all inclusive, this project encompasses the work necessary to repair the stormwater drainage systems east of Taxiway 'J' on Dobbins ARB. Areas where the slopes have failed or where they have been disturbed from previous repairs will be regraded and have sod applied to obtain stabilization and positive drainage. Work shall include all maintenance items identified in basin III, IV, and V on the airfield. In addition to the work associated with correcting the grades around the airfield, the cleaning of existing flumes, pipes, and swales is required to reestablish proper drainage patterns. New concrete flumes will be installed at various locations throughout the airfield to reestablish positive drainage and prevent future erosion and standing water.