Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on June 21, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Repair by Renovate/Refurbish the Gym Floor, B120

Closed
FA2550-17-R-1019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238330
New
SLED
Taylor Center - Bresnan Wood Floor Replacement
Solicitation # SRC-MNSU-2027-000651-RFB
Solicitation SRC-MNSU-2027-000651-RFB is a request for bids from the Minnesota State Colleges and Universities System for the replacement of the wood floor at the Taylor Center Bresnan Arena Court at Minnesota State University, Mankato. The scope of work involves the removal and disposal of existing maple flooring, the installation of 25/32” x 2-1/4” 2nd and better grade maple, and the application of a water-based seal and oil modified gloss finish. The selected vendor will also assist in redesigning graphics and game lines and will be responsible for the final cleaning and protection of the entire arena, including the seating area. Any necessary subfloor repairs will be handled on a time and material basis, requiring the vendor to provide an hourly rate in their bid. The project is scheduled to begin on May 17, 2027, with substantial completion by June 28, 2027, and final completion by July 9, 2027. The contract will be awarded to the lowest priced, qualified bidder who meets all technical requirements, timeline constraints, and terms and conditions. Bidders must submit a lump sum total bid and provide required documentation, including an Affidavit of Non-Collusion, an Affirmative Action declaration, and a Supplier Diversity Form. All submissions must be made electronically through the Minnesota State e-procurement system by the deadline of November 12, 2026. Compliance with prevailing wage standards is mandatory for this project.
Minnesota State Colleges and Universities System

POSTED

about 22 hours ago

DEADLINE

in 23 days
NAICS: 238330
New
Federal
USMC Stair Runner Replacement for Home of the Commandant
Solicitation # M0026427RFI002
The Department of Defense, through the Marine Corps, has issued a sources sought announcement under solicitation M0026427RFI002 to conduct market research for the replacement of the stair runner at the Home of the Commandant in Washington D.C. This project requires a custom, like-for-like replacement for three flights of stairs and associated landings, designed to replicate the existing runner's appearance, color, pattern, and texture to maintain the residence's historic architectural character. The scope of work includes field measurements, the provision of material samples for government approval, fabrication of a professional-quality runner with finished edges, and full installation. The project must be completed by April 16, 2027, with work typically performed Monday through Friday from 7:00 AM to 4:00 PM. This opportunity is designated as a total small business set-aside under NAICS code 238330. Interested vendors must demonstrate experience in custom carpet fabrication and professional installation. Key requirements include the use of protective coverings to safeguard historic woodwork and architectural features, the removal of all contractor-generated debris, and compliance with security and access-control protocols at Marine Barracks Washington. Responses must be submitted to Sergeant Jacob Espinosa by 10:00 AM EST on October 22, 2026, and should include the company name, address, phone number, point of contact, CAGE code, company size status, and ownership nationality.
Commander

POSTED

about 23 hours ago

DEADLINE

in 2 days

General Info

Contract Value

$66,495

NAICS

238330 - Flooring Contractors

Place of Performance

Schriever AFB, Schriever AFB, CO, 80912, USA

Set-Aside

WOSB

Award Issued Date

Documents

25

GLEN_18-2301_Site_Visit_Attendance_Sheet_16_Jun_17.pdf

PDF

GLEN_18-2301_Site_Visit_Memo_16_Jun_17.pdf

PDF

HAZMART_GLEN_18-2301.pdf

PDF

IMG_5681.jpg

JPG

IMG_5682.jpg

JPG

IMG_5683.jpg

JPG

IMG_5685.jpg

JPG

IMG_5686.jpg

JPG

IMG_5687.jpg

JPG

IMG_5688.jpg

JPG

IMG_5689.jpg

JPG

IMG_5690.jpg

JPG

IMG_5692.jpg

JPG

IMG_5693.jpg

JPG

IMG_5694.jpg

JPG

IMG_5695.jpg

JPG

IMG_5699.jpg

JPG

IMG_5700.jpg

JPG

IMG_5701.jpg

JPG

IMG_5702.jpg

JPG

IMG_5704.jpg

JPG

IMG_5705.jpg

JPG

RFQ_FA2550-17-R-1019__2_Jun_17.pdf

PDF

SOW_GLEN_18-2301_13_Feb_17.pdf

PDF

Wage_Determination_19_May_17.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2550 50 Cons Pkp
Contacts2 people available
OfficeSCHRIEVER SFB, CO, 80912-2116, USA
Office AddressSCHRIEVER SFB, CO, 80912-2116, USA
Contacts
Michael A. KilbournOIC, Base Infrastructure Flight
John M MittelstedtContracting Officer

Full Description

Show more
1.The quote acceptance period is specified in Block 13D of the Standard Form 1442 of the solicitation. By signing the SF 1442, the contractor agrees that the quoted price is valid for at least the number of days listed in Block 13D. 2.Contractors' technical approach will be evaluated on an acceptable/unacceptable basis. By submission of its quote, the Contractor accedes to all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. The Contractor must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. 3.These instructions prescribe the format of quotes and the submission requirements. They are designed to ensure that the contractor understands the quote requirements, and what will be required for the Government to accurately evaluate the quote data to determine technical acceptability and price fair and reasonableness; both are required prior to the Government making an offer for award. These instructions permit the contractor to include any pertinent data that they deem relevant to the Government's understanding of both the quoted technical approach, and cost information that may be above and beyond what is explicitly requested in these instructions. 4.The contractor shall either mail, hand carry, or e-mail their quote to the below address no later than the date specified in Block 13A of the 1442. 50th Contracting Office Attn: 2d Lt Michael A. Kilbourn or Mr. John Mittelstedt 210 Falcon Parkway, Suite 2116 Schriever AFB, 80912-5006 michael.kilbourn.2@us.af.mil john.mittelstedt@us.af.mil 5.Hard copy quotes shall be accompanied by either a DVD with electronic versions of the quotes document and all associated attachments, or, an e-mail that includes the quote document and all associated attachments. Please be advised that the Schriever AFB firewalls or servers may delay or prevent the electronic transfer of large data files via e-mail. Because of this, the contractor is encouraged to separate their e-mails labeling them as follows: (1 of.., 2 of..., 3 of.,etc.). 6.Discrepancies: If an offeror believes that the requirements in these instructions or within the solicitation documents contain error(s), omission(s), or are otherwise unsound, the offeror shall immediately notify this office in writing with supporting rationale. 7.Mandatory Submission: The offeror shall submit copies of the SF 1442, front and back, the appropriate signatures, and acknowledgements of all amendments as required. The 1442 shallhave a unit price, and total price annotated for each CLIN; and, Block 30A, B, and C shall be signed by an authorized representative of the offeror's company.

More opportunities from Department Of Defense → FA2550 50 Cons Pkp

Same awarding agency

NAICS: 236220
Federal
USSF Construction CSO
Solicitation # USSF-CSO-FY26-2808A
The United States Space Force (USSF) Space Operational Contracting Headquarters has established a Master Commercial Solutions Opening (CSO) under solicitation number USSF-CSO-FY26-2808A to streamline the design, construction, repair, and alteration of base infrastructure. Authorized under 10 U.S.C. § 2808a, this framework utilizes Other Transaction (OT) authority, making all resulting agreements completely exempt from the Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS). The Master CSO serves as an umbrella solicitation, with specific project requirements published separately as Areas of Interest (AOIs). All awards must be structured as fixed-price agreements, including firm-fixed-price, fixed-price incentive, or fixed-price award fee structures, while cost-reimbursable agreements are strictly prohibited. The solicitation process employs a phased down-select method to minimize industry costs, consisting of a Phase 1 White Paper, a Phase 2 Oral Pitch, and a Phase 3 Full Commercial Proposal. Evaluation focuses on technical merit, constructability, schedule viability, and fair and reasonable commercial pricing. Selected partners must adhere to commercial industry building codes such as IBC and NEC, and may be required to comply with Unified Facilities Criteria (UFC) and Anti-Terrorism/Force Protection (AT/FP) standards. Payment is managed through a milestone-based system, where fixed-price payments are triggered only upon the verifiable completion of work that has passed inspection. Additionally, contractors must comply with Davis-Bacon Act wage rates and maintain specific insurance coverages, including Professional Liability for design-build projects of at least $2M.
Commercial and Institutional Building Construction

POSTED

21 days ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS