REPAIR BY REPLACEMENT OF EXISTING ELEVATOR AND DUMBWAITER SYSTEMS

Active
W5J9JE-17-R-0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves the complete removal and replacement of thirteen existing elevators and three dumbwaiters, including all associated systems within hoistways and machine rooms. The contractor is responsible for providing and installing thirteen new elevators and three new dumbwaiters, ensuring that the entire conveying system is fully complete and operational before beginning the next phase of construction. The work must be executed in phases, with the first phase fully completed prior to progressing to the second. The new systems include elevator cabs, motors, control panels, guiderails, finishes, pit ladders, door support angles, lighting, electrical wiring, phone circuits, and ventilation/heating/cooling systems to meet code requirements. The contractor and manufacturer must design the new systems to be fully compliant with either U.S. or European elevator codes, with all life safety features incorporated into the elevator controllers. Only one manufacturer is allowed for all elevators and another for all dumbwaiters, prohibiting multiple manufacturers within the project. The installation must be adapted to existing site conditions and comply with specifications regarding quantities, locations, dimensions, and capacities. The project emphasizes experienced contractors familiar with geared electric traction elevators suitable for buildings with 2 to 10 floors and hospital-grade features for accessibility and non-ambulatory occupants. It includes thorough verification of existing conditions and requires all necessary labor, materials, and equipment to complete the installation at the specified location in Kabul under the oversight of the Department of Defense.

General Info

Remove and replace thirteen elevators and three dumbwaiters in phases, ensuring full code compliance.

Agency

Department Of Defense → W2SN Endist Far EastView Agency

NAICS

238290 - Other Building Equipment ContractorsView NAICS

Place of Performance

KABUL NATIONAL MILITARY HOSPITAL, KABUL, AP, AFG

Set-Aside

NONE

Documents

(1)

W5J9JE-17-R-0002_Synopsis.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SN Endist Far East
Contacts2 people available
OfficeAPO, AP, 96271-0000, USA
Organization / Agency
Department Of Defense → W2SN Endist Far East
View Agency Profile
Office AddressAPO, AP, 96271-0000, USA
Contacts
Kimberly RobinsonCONTRACTING OFFICER
RUTH RIDENHOURCONTRACT SPECIALIST

Full Description

Show more
Remove thirteen (13) existing elevators and three (3) existing dumbwaiters. All elevators and dumbwaiters systems shall be removed in their entirety, to include all associative system in hoist ways and machine rooms. Provide and install thirteen (13) new elevators and three (3) new dumbwaiters. New conveying system shall be full and complete, and all associative components and must be completed before starting work on the succeeding phase. First phase must be completed before construction/proceeding onto the second phase. Contractor shall provide and install all aspects of new conveying system to include but not limited to: - Elevator cab, motor, control panels, guiderails, trim finishes - Pit ladder - Door support angles - Lighting, switches, outlets and conduit - Phone circuits, branch circuits - Venting, heating and cooling as required per code Contractor/elevator and dumbwaiter manufacturer shall design new elevator/dumbwaiter systems, and adapt those systems to existing site conditions as required for fully functioning, code compliant installations. New elevators and dumbwaiters shall be quantities, locations, dimensions, and capacities as required in the specifications. All new elevators shall be of one manufacturer, all new dumbwaiters shall be of one manufacturer. Multiple manufacturers will not be accepted. New elevators controllers shall include all Life Safety capabilities as required and meet all aspects of either U.S. or European elevator codes. The project shall include but not be limited to all verifications of existing conditions, material, labor, and equipment as necessary to complete installation of new elevators and dumbwaiters. Contractor shall have experience providing and installing Geared Electric Traction elevators of general criteria as follows: 2 to 10 floors Overhead Machine Rooms Hospital elevators with all features for accessibility and non-ambulatory occupants. - Project shall/will meet all aspects of either U.S. or European elevator codes.