Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Repair to Sands Boulevard Bridge over Eternity Canal

Open
2027-ITB-PW-014-KRState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Cape Coral is soliciting bids for permanent repairs to the Sands Boulevard bridges over Eternity Canal (Bridge Nos. 125717 and 125718), which sustained significant storm damage. The scope of work includes repairing and reconstructing the bulkhead system, restoring eroded embankments and backfill, replacing damaged concrete slope pavement, and installing scour protection using bedding stone and an articulating concrete block revetment system. This project is funded through the Florida Department of Transportation and the Federal Highway Administration as part of a disaster recovery program, requiring the contractor to comply with all Federal-Aid requirements, including Form FHWA-1273, the Davis-Bacon Act, and Build America, Buy America (BABA) sourcing preferences. The contract will be awarded to the lowest, responsive, and responsible bidder. Bids must be submitted electronically via the OpenGov portal by 3:15 pm on December 30, 2026. Key requirements include the submission of bid security, adherence to prevailing wage rates, and compliance with OSHA safety standards and non-discrimination statutes. The contractor is responsible for employing an independent testing laboratory and providing a Pollution Control Plan. Payments will be made via direct deposit (ACH), and the City's obligation to pay is contingent upon annual appropriation by the City Council. There is no specified set-aside status for this solicitation.

General Info

Cape Coral seeks bids for permanent repairs to storm-damaged Sands Boulevard bridges.

NAICS

N/A

Place of Performance

FL, USA

Set-Aside

NONE

Documents

9
PDF, High priority: read this first2 pages · specifications
High
PDF, High priority: read this first109 pages · itb
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this first22 pages · specifications
High
PDF, High priority: read this first49 pages · specifications
High
PDF, High priority: read this first28 pages · contract-document
High
PDF, High priority: read this firstwage-determination
High
PDF, Low prioritycontract-document
Low
PDF, Low priority2 pages · public-construction-bond
Low

Read all 9 documents

Due in 36 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 36 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 9 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Public Works
Contacts1 person available
OfficeCape Coral, FL, 33915, USA
Organization / AgencyFlorida → Public Works
Office AddressCape Coral, FL, 33915, USA

Interested Companies (13)

A & P Heavy CivilFort Lauderdale, FL
Arex BuildersCape Coral, FL
Florida Surety BondsMaitland, FL

See All 13 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The City of Cape Coral is seeking qualified and experienced contractors to perform permanent repairs to the Sands Boulevard bridges over Eternity Canal (Bridge Nos. 125717 and 125718). These structures sustained significant damage from multiple storm events, resulting in deterioration and displacement of the existing bulkhead system, erosion of embankment materials, damage to the concrete slope pavement, and scouring/undermining bridge substructures. The permanent repair project includes repairs to the damaged bulkhead system, restoration of eroded embankment and backfill areas, replacement of damaged concrete slope pavement, and installation of scour protection within and adjacent to Eternity Canal. The proposed improvements are intended to stabilize the canal embankment and bridge approaches, protect the bridge structures from continued erosion and scour, and provide a long-term resilient solution to the storm-related damage. Please refer to Exhibit C for a graphic depicting the bridge locations. This project is being funded through the Florida Department of Transportation (FDOT) and the Federal Highway Administration (FHWA) as part of a disaster recovery reimbursement program. Accordingly, the selected Contractor shall fully comply with all applicable federal, state, and local requirements governing Federal-Aid projects, including all applicable standards, procedures, labor requirements, documentation, recordkeeping, and reporting obligations.

More opportunities from Florida → Public Works

Same awarding agency

NAICS: 237110
New
SLED
Lift Station No. 115 Rehabilitation
Solicitation # IFB27-0023
The City of Orlando is soliciting bids for the rehabilitation of Lift Station No. 115, located at 641 Concord St, Orlando, FL. The scope of work includes the demolition of the existing lift station building and interior components, partial demolition of the wet well and below-grade valve vault room, and the installation and field testing of submersible wastewater pumps and associated appurtenances. All work must be performed in strict conformity with provided plans and specifications, including National Electrical Code standards and various painting and water quality regulations. The contract will be awarded to the lowest responsive and responsible bidder based on the Total Base Bid. Responses must be submitted electronically via OpenGov by December 2, 2026, at 2:00 pm local time. Required submittals include a price proposal completed in OpenGov, bid forms, a 10% bid security, and affidavits of non-collusion and compliance with the City's Responsible Contractor’s Policy. There is no set-aside status for this solicitation. Contractors are required to provide performance and payment bonds, as well as certificates for workers' compensation and comprehensive general liability insurance, within two weeks of a notification of intended award. Labor must comply with the Davis-Bacon Act for the Orlando region (Orange County, Heavy construction). Payment is processed via an Application for Payment with a 20 to 25 business day payment period. Final acceptance requires a 24-hour operating period for the pumps and a Final Acceptance Test.
Water and Sewer Line and Related Structures Construction

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
Virginia Dr., Forest Dr., and Corrine Dr., Complete Streets Project
Solicitation # IFB27-0003
The City of Orlando is soliciting bids for the Virginia Drive, Forest Drive, and Corrine Drive Complete Streets Project (IFB27-0003), a roadway and pedestrian improvement initiative spanning approximately 2.6 miles between State Road 527 (Orange Avenue) and Bennett Road. The project scope includes extensive civil works such as clearing and grubbing, the removal of over 10,000 square yards of existing concrete, and the installation of drainage, lighting, signalization, and signing and pavement markings. Additionally, the project incorporates technical landscape design and the implementation of ADA-compliant paths of travel. The engineer's estimate for the project is 26,089,582.31 dollars. Bids must be submitted electronically via the OpenGov portal by 2:00 pm local time on November 19, 2026. The contract will be awarded to the lowest responsive and responsible bidder based on the Total Base Bid. Successful contractors must provide performance and payment bonds totaling 100 percent of the contract amount, as well as required certificates of insurance, within two weeks of the notification of intended award. The project timeline allows for substantial completion within 1,095 days and final completion within 1,130 days from the start of contract time, with a mobilization requirement of 10 calendar days following the Notice to Proceed. Compliance requirements are stringent, including adherence to the Davis-Bacon Act for wages, Equal Employment Opportunity standards, and the Build America, Buy America Act for sourcing steel and iron. Contractors are required to submit weekly certified payrolls and monthly applications for payment. Quality assurance is managed through a required Contractor Quality Control Plan, with final acceptance of work performed by the engineer. All excavations must conform to the Trench Safety Act, and storm pipeline installations are subject to TV inspection by the City.
Highway, Street, and Bridge Construction

POSTED

about 22 hours ago

DEADLINE

in 15 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS