Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Repair Water Tower B738

Awarded
FA303026Q0013Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation FA303026Q0013 is a Request for Quotation for the emergency repair and repainting of the interior of a 400,000-gallon multi-column elevated water storage tank, designated as Water Tower B738 (West), located at Goodfellow Air Force Base in San Angelo, Texas. The scope of work includes complete surface preparation, removal of existing coatings, and the application of new interior protective coatings to ensure potable-water standards and structural integrity. Additionally, the project requires metal fabrication to replace the overflow stub pipe, install a new riser access manway, replace the internal riser access ladder, and install new steel bar safety grating to meet NFPA and OSHA requirements. The project is a 100 percent Small Business Set-Aside under NAICS 237110, with an estimated magnitude between 500,000 and 1,000,000 dollars. The contract will be awarded using the Lowest Priced Technically Acceptable method, based on the Total Evaluated Price across all contract line items. The performance period is 120 calendar days from the date of the Notice to Proceed. Key requirements include the submission of a bid guarantee of 20 percent of the bid price or 3,000,000 dollars, whichever is less, and the provision of performance and payment bonds at 100 percent of the contract value. Offerors must demonstrate technical acceptability and past performance, specifically requiring key personnel to have completed at least five similar projects within the last five years. Final offers are due by 2:00 PM local time on 15 September 2026.

General Info

Emergency repair and repainting of Water Tower B738 at Goodfellow Air Force Base.

Contract Value

$486,250

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Goodfellow AFB, TX, 76908, USA

Set-Aside

SBA

Award Issued Date

Documents

21

Amendment 0002 to Solicitation FA303026Q0013 - Repair Water Tower B738

PDF, High priority: read this firstamendment
High

FA303026C00130003 Amendment 0003

PDF, High priority: read this firstamendment
High

FA3030-26-C-0013-0004 SF 1442 Solicitation/Award Amendment 0004

PDF, High priority: read this firstamendment
High

FA303026C00130006 Solicitation and Award Form SF 1442

PDF, High priority: read this firstsolicitation
High

FA303026C00130007 - Repair Water Tower B738

PDF, High priority: read this firstrfp
High

FA303026Q00130001 Amendment #0002 Questions & Answers

PDF, High priority: read this first3 pages · amendment
High

FA303026Q00130001 Amendment 0002 - Repair Water Tower B738 Q&A

DOCX, High priority: read this first2 pages · amendment
High

FA303026Q00130007 Repair Water Tower B738 Q&A Rev 002

PDF, High priority: read this firstq-and-a
High

JCGU 26-7001 Emergency Repairs to Water Tower B738 Construction Drawings

PDF, High priority: read this first4 pages · construction-drawings
High

JCGU 26-7001 Goodfellow AFB Water Tower B738 Emergency Repair Drawings

PDF, High priority: read this first4 pages · specifications
High

JCGU 26-7001 Repair Water Tower B738 Pricing Schedule

PDF, High priority: read this first1 page · pricing-schedule
High

JCGU 26-7001 Repair Water Tower B738 SOW Goodfellow AFB

PDF, High priority: read this first156 pages · sow
High

JCGU 26-7001 Repair Water Tower B738 (West) - SOW

PDF, High priority: read this firstsow
High

JCGU 26-7001 Repair Water Tower B738 (West) SOW and Specs

PDF, High priority: read this first156 pages · sow
High

Repair Water Tower B738 Pricing Schedule

PDF, High priority: read this first1 page · pricing-schedule
High

Solicitation FA303026Q0013 Repair Water Towers B738

PDF, High priority: read this firstifb
High

Submittal Register for Repair Water Tower B738 (West)

PDF, High priority: read this first4 pages · submittal-register
High

Wage Determination - Building Construction - Texas - July 26, 2020

PDF, High priority: read this first5 pages · wage-determination
High

JCGU 26-7001 Repair Water Tower (West) B738 - Photo Documentation

PDF, Low priority8 pages · supporting-photos
Low

Liquidated Damages Assessment Summary

PDF, Low priority1 page · liquidated-damages
Low

Request Unescorted Base Access Pass Memorandum

DOCX, Low priority1 page · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

6 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 24, 2026 to Sep 2, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 2, 2026 to Sep 11, 2026. The notice description changed.

Notice updated

Response deadline changed from Sep 11, 2026 to Sep 15, 2026. The notice description changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3030 17 Cons Cc
Contacts2 people available
OfficeGOODFELLOW AFB, TX, 76908-4705, USA
Office AddressGOODFELLOW AFB, TX, 76908-4705, USA
Contacts

Full Description

Show more

The 17th Contracting Squadron, 210 Scherz Blvd, Bldg. 707, Goodfellow AFB, TX 76908-4705 has awarded FA303026Q0013 - Repair Water Tower B738 to TMI Coatings LLC on 18 September 2026 for the amount of $486,250.00. 


Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and transportation necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes, concrete structures, and fabricated pipe and fittings. Specialized services required for the project include traffic control, SWPPP, construction survey, electrical work, welding, and preconstruction video. Norstar Plumbing and Engineering, Inc. is acting as the prime contractor and is actively seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The solicitation is categorized under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications for the project are available through the Inland Empire Utilities Agency bidding website. Primary points of contact for outreach and coordination are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in about 1 hour
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds equal to the contract price and insurance from companies with an A.M. Best rating of A-VII or better. Technical standards include AWWA Specification C-600 for pipelines and NEMA MG1 for electric motors. Administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payments are processed via applications for payment and become due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is soliciting quotes from DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, and surveying. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. This is a union project, and all subcontractors are required to utilize union labor. Potential subcontractors must be capable of providing a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company and must provide their bond rate at the time of bidding for reimbursement. Contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any exceptions to these terms must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 20 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains. Key construction elements include the creation of a new Mountain Avenue Lift Station with a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, FRP enclosures, fire suppression, piping, valves, and electrical and instrumentation. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on DBE participation. Bids are due by October 29, 2025, at 2:00 PM. Filanc has indicated a willingness to assist qualified small business subcontractors with bonding, insurance, credit lines, and materials to facilitate project participation.
Filanc

POSTED

about 1 hour ago

DEADLINE

in about 1 hour
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS