Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

REPAIRS TO NCTS ADMIN BLDG, F-367

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Far EastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Far East
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Project will replace exterior & interior door, Panel Boards with 250A (1-ea), 225A (2-ea), 150A (6-ea), 50A (2-ea) & 70A (3-ea), dry Type transformers with 500KVA (1-ea), 15KVA (3-ea), 45KVA (1-ea), disconnect switches (16-ea), panel control voltage relay (9-ea), interior lighting fixtures, motor control system, electrical distribution and conduit branch circuits, grounding points, FACP alarm and sprinkler system, built up roof system, floor carpets, ceiling tiles and HVAC system. Additional scope of work were based on ICAP inspection and Builder Generated Requirements for deficiencies of the facility. Project will perform the following: 1] Application of MREC, exterior & interior single & double door assemblies, replacement of chain-link fence assembly, 2] Remove all remaining Halon fire suppression components to include agent release pull station, signs, piping, supports, brackets, horns, strobes, and wall mounted electronic releasing stations. Halon devices and materials located under the raised floor must also be removed, 3] Replace plumbing fixtures; 5-ea toilet wall mounted flush valve water closet, 4-ea lavatory, and 1-ea urinal, 1-ea floor mounted concrete sink,1-ea kitchen stainless sink, 1-ea shower including 890-lf pipes/ fittings and all supported accessories, 4] Shut-off valve/ cut/ remove 1-ea backflow preventer 1-1/2" dia. located exterior side of the building, 5] Shut-off valve/ replace the existing water heater, isolate, secured water gate valve, supply inlet/outlet in way of works, 6] Replace 1-ea emergency eye wash/ shower station located interior side of the battery room area and 6] Remove all obsolete antennas and related accessories located roof top of the building. 7] Replace existing switchboard.