This Solicitation opportunity from Department Of Defense was posted on August 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Replace AAS BAK-15 Controls, B2001, B2003
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation FA302226R0011 is a small business set-aside request for proposal to replace the outdated radio signal controlled BAK-15 barrier systems at Columbus Air Force Base, Mississippi, with a modern fiber controlled hard wire system. The project involves the full replacement of panels, buttons, switches, and control components across two Runway Supervisory Units and the Air Control Tower. The government has established a range of magnitude for this procurement between 500,000 and 1,000,000 dollars. Award will be based on the Lowest Price Technically Acceptable (LPTA) process, where technical acceptability and past performance serve as pass/fail gates before the lowest evaluated price is selected. The period of performance is 210 calendar days, with work required to begin within 10 days of the notice to proceed. To avoid mission interruption, the contractor must perform work after hours. Key administrative requirements include the submission of a technical synopsis and a detailed cost breakdown using e4Clicks, RS Means, or the provided Appendix A. Additionally, offerors must complete CUI training and sign an acknowledgment form to access restricted documentation. Following Amendment 0001, the proposal submission deadline has been extended to September 3, 2026, at 2:00 CDT. All invoicing and payment requests must be processed through the Wide Area Workflow (WAWF) system.
General Info
Place of Performance
Columbus, MS, 39710, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Amendment 1:
The purpose of this amendment is to extend the solicitation proposal 10 days, extending the due date from 24 August 2026 at 2:00 CST to 03 September 2026 at 2:00 CDT.
NOTICE 1: The answers to the RFIs have been posted along with the Site Visit Sign-In Sheet.
NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically.
Description: The goal of this project is to bring the out-of-date control system currently operating the BAK-15 barriers on the outer runway up to date with a modern control system. The intent is to replace the existing radio signal controlled system with a new modern fiber controlled hard wire system.
Site Visit, RSVP, and Base Entry: The Government invites you to a site visit on 4 Aug 2026 at 9:00 AM CST. Attendance is highly encouraged but not mandatory. Please note that registration is required by 7:30 AM CST on 29 Jul 2026. To register, please email the POC requesting a DoD Safe drop-off link to securely upload your completed Entry Authorization Listing (EAL) document (found in the list of SAM.gov attachments). If you do not contact the POC by 7:30 AM CST on 29 Jul 2026, you will not be able to attend the site visit.
Identification: All attendees must bring a valid photo ID. All photo IDs must meet the requirements for "REAL ID."
Vehicle Requirements: If driving on base, please ensure the driver has driver's license, vehicle registration, and proof of insurance.
IMPORTANT: All contractors should arrive at Columbus AFB’s Visitors Center early and wait for a 14th Contracting Squadron representative to arrive and lead them to the site visit location. The representative will leave the visitors’ center at 9:00 AM CST
Additional Info: All RFIs must be submitted NLT 7:30 AM CST, on 10 August 2026.
IAW FAR 36.204(e) - The range of magnitude for this procurement is between $500,000 and $1,000,000.
52.232-18 Availability of Funds. Availability of Funds (Apr 1984)
Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS