REPLACE FEED WATER PIPING AT B-136 WATERVLIET ARSENAL

Active
W911PT26QA073Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract mandates the complete removal and replacement of approximately 70 linear feet of 4-inch black carbon steel feed water piping and two backflow preventers at Building 136 within the Watervliet Arsenal in New York, under project number 26PW004. All labor, materials, equipment, tools, temporary utilities, and supervision must be furnished by the contractor, with strict adherence to industry standards including ASME B31.1 for pressure piping, ANSI/ASME A13.1 for pipe labeling, NFPA 70 for electrical safety, and UFGS specifications for plumbing and insulation. Newly installed piping must be properly insulated and labeled with snap-around tags indicating “Cold Water” or “Feed Water,” with flow direction clearly marked at 25-foot intervals, and all labels are subject to approval by the project COR. Work must be conducted within a 45-calendar-day period starting from receipt of the Notice to Proceed, with a mandatory start within seven days and completion including final site restoration and cleanup. Normal working hours are Monday through Thursday from 7:00 AM to 4:00 PM and Fridays from 7:00 AM to 3:00 PM, with federal holidays observed as non-work days. The contractor is required to obtain daily permits from the Watervliet Arsenal Fire Department for welding, burning, flame use, or confined space entry and must submit a project-specific safety plan for government approval. The contract is a Firm Fixed Price, Total Small Business Set-Aside under NAICS code 237110, with a value between $25,000 and $100,000, and requires all bidders to be verified small businesses with current representations and certifications in SAM. Payment and Performance Bonds are mandatory if the quote exceeds $150,000, though this contract falls below that threshold. Contractors must comply with the NY2 wage determination and provide all labor in accordance with federal labor standards. All materials must be delivered in manufacturers’ sealed containers, labeled with brand, description, manufacturer, date codes, and shelf life, with insulation guaranteed to be asbestos-free. Equipment and dumpsters must bear weather-resistant labels identifying the contractor, POC, phone, and project number. Radiographic inspection of ten randomly selected welds is required, and any welds failing ASME B31.1 standards must be corrected at no additional cost to the government. Performance will be evaluated by the COR

General Info

Remove and replace feed water piping at Building 136, Watervliet Arsenal, firm fixed-price, 45 days, small business set-aside.

Agency

Department Of Defense → W6QK Acc WvaView Agency

NAICS

237110 - Water and Sewer Line and Related Structures Construction View NAICS

Place of Performance

Watervliet, NY, 12189, USA

Set-Aside

SBA

Documents

(5)

Solicitation W911PT26QA073 Replace Feed Water Piping

PDFifb

UFGS-23 07 00 Thermal Insulation for Mechanical Systems (August 2024)

PDFspecifications

UFGS-22 00 00 Plumbing, General Purpose (May 2024, Change 1)

PDFspecifications

UFGS-23 05 15 Common Piping for HVAC May 2022 Change 2

PDFspecifications

SOW for Replace Feed Water Lines at Watervliet Arsenal Bldg 136 Project 26PW004

DOCXsow

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseCombined Synopsis
Posted

Combined Synopsis

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc Wva
Contacts1 person available
OfficeWATERVLIET, NY, 12189-4050, USA
Organization / Agency
Department Of Defense → W6QK Acc Wva
View Agency Profile
Office AddressWATERVLIET, NY, 12189-4050, USA
Contacts

Full Description

Show more

TO PROVIDE ALL LABOR, MATERIAL, PARTS AND EQUIPMENT REQUIRED FOR THE REMOVAL AND
REPLACEMENT OF FEED WATER PIPING AT BUILDING 136 PER SOW PROJECT #26PW004 Bldg 136v2.


Wage Determination General Decision Number: NY2, latest revision applies and is incorporated.


Magnitude of this Project is between $25,000 and $100,000


Period of Performance is 45 Calendar Days from receipt of Notice to Proceed.


100% Payment and Performance Bonds (Performance bonds only if quote is over $150k) are required


Technical POC is Michael White.


Pricing Arrangement: Firm Fixed Price



PLEASE READ THROUGH SOLICITATION AND APPLICABLE DOCUMENTS PRIOR TO REQUEST FOR INFORMATION. ALL REQUESTS FOR INFORMATION MUST BE IN WRITING VIA ELECTRONIC MAIL TO MARIA.D.DECRESCENZO.CIV@ARMY.MIL.

Similar Contracts

NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle’s Aviation Project Management Group is preparing to restore the integrity of a 1947 water main located along the northbound Airport Expressway using cured-in-place pipe (CIPP) technology under a Design-Bid-Build procurement model. This initiative aims to extend the service life of the aging infrastructure by rehabilitating the existing pipeline without full excavation, minimizing disruption to traffic and surrounding areas. The project is classified under NAICS code 237110, indicating it falls within water and sewer line and related structures construction. Solicitation details are not yet available, but the contract is currently forecasted for release with a posted date of July 4, 2026. Primary point of contact for inquiries is Moraa Omwega, reachable via email and phone, with Ray Moreno serving as the Project Manager. The work will be performed in the vicinity of the Airport Expressway, though the exact city and state are not specified in the data provided. This effort underscores the Port of Seattle’s commitment to proactive infrastructure preservation and the adoption of innovative, minimally invasive rehabilitation techniques. Interested parties should monitor the official portal link for upcoming solicitation documents, bid deadlines, and technical specifications prior to the formal procurement phase.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A
View Details