Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on February 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Replace Fire Hydrant at USCG Air Station Clearwater

Closed
20150PR260000047Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238290
New
Centennial JCC Panic Hardware Services (Electrical Room Egress Doors)
Solicitation # Panic Hardware (Electrical Room Egress Doors)
Management & Training Corporation is soliciting bids for the installation of commercial-grade panic hardware on electrical room egress doors at the Centennial Job Corps Center in Nampa, Idaho. The project encompasses five specific locations, including the B-Cafeteria, Men's Dorm, Women's Dorm, Recreation, and Vocational areas. The selected contractor must perform site surveys to verify door dimensions and fire ratings, procure Grade I commercial-grade panic bars and matching hardware, and ensure all installations comply with NEC 2023 Article 110.26(C)(3), NFPA 101 Life Safety Code, and ADA standards. Performance verification requires a minimum of 10 consecutive cycle tests to ensure fail-safe operation. This is a fee-for-service subcontracting opportunity set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Bidders must submit a lump sum price via a bid sheet, provide three references for similar projects, and complete a supplier onboarding packet including a W-9 and self-certification form. All submissions are due by December 1, 2026, at 3:00pm MST. The contract is subject to various Federal Acquisition Regulations, including prevailing wage rates under the Davis-Bacon Act, Executive Order 14026, and strict information security and privacy breach notification requirements.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 238290
New
SLED
NODC Roll-Up Counter Shutter Replacement
Solicitation # SRC0000042163
Solicitation SRC0000042163 is for a turnkey project to replace the roll-up counter shutter in the canteen of building 610 at the Northwest Ohio Developmental Center in Toledo, Ohio. The scope of work includes the removal and disposal of the existing shutter and the installation of one Wayne Dalton Rolling Counter Door, Model CFS-510. This specific model must be nonrated, clear anodized aluminum with flat slats for face of wall mounting, featuring a right-side hand-crank manual operation and pad-lockable slide bolt locking on both ends. The contract is estimated to be effective from October 19, 2026, through June 30, 2027. Bids will be awarded to the lowest responsive and responsible bidder. Interested parties must submit their quotes via OhioBuys by November 9, 2026, including a completed item grid for parts and labor, a formal quote valid for at least 30 days, and required documentation such as the Standard Affirmation and Disclosure Form and the Contractor Information Form. Bidders may also submit a Contractor Certification Statement Form to claim preferences for Buy American, Buy Ohio, or Veteran Friendly Business Enterprise status. Compliance requirements include adherence to Ohio Prevailing Wage Laws, OSHA safety standards, and strict background and conduct certifications for all personnel working on the grounds of the developmental center.
Developmental Centers, Ddd207000 Northwest Ohio Dc Nwdc

POSTED

about 7 hours ago

DEADLINE

in 20 days
NAICS: 238290
New
SLED
IFB No. 133713 FMS 25 Multiple Roll-up Door Repairs and Preventative Maintenance, Hammer Field Armory
Solicitation # 133713
The California Military Department is soliciting bids under IFB No. 133713 for comprehensive repairs and five-year preventative maintenance of multiple roll-up doors at the Hammer Field Armory (FMS 25) in Fresno, California. The scope of work includes targeted component replacement, safety and control system upgrades, and the full replacement of one door to ensure operational reliability. The selected contractor must possess a D-28 Doors, Gates and Activating Devices license and is allotted 120 calendar days to complete the project. Award will be granted to the lowest responsive responsible bidder, with a 25 percent Small Business participation goal and a 5 percent Disabled Veteran Business Enterprise (DVBE) goal. Prospective bidders were required to attend a mandatory pre-bid job walk on October 26, 2026. All bids must be submitted electronically as a single PDF by November 16, 2026, at 2:00 PM. Required documentation includes a rate sheet and various certifications, such as the Darfur and Iran Contracting Act forms, Payee Data Record, and Non-Collusion Affidavit. The contract mandates compliance with State General Prevailing Wage Rates, the Buy American Act for construction materials, and ADA standards. Payment will be processed electronically in arrears, with invoices submitted no more frequently than monthly and no less than quarterly. Bonding requirements apply if the bid or public works expenditure exceeds $24,999.99, requiring bid, payment, and performance bonds.
California Military Department

POSTED

about 21 hours ago

DEADLINE

in 27 days
NAICS: 238290
New
SLED
Contractor that shall provide comprehensive preventative maintenance, inspections, testing, minor repairs, and reporting services for 9 elevators at the MSDH Central Campus to ensure safe, reliable, and compliant operation in accordance with all applicabl
Solicitation # 1301-27-R-IFBD-00008-V01
The Mississippi State Department of Health is soliciting bids under solicitation number 1301-27-R-IFBD-00008-V01 for a contractor to provide comprehensive preventative maintenance, inspections, testing, minor repairs, and reporting for nine elevators at the MSDH Central Campus in Jackson, Mississippi. The anticipated period of performance is from January 6, 2027, to June 30, 2032, with a maximum cumulative duration of five years including potential one-year renewals. The scope of work includes monthly maintenance per manufacturer recommendations, annual safety inspections and full load testing, and 24/7 emergency callback services with a two-hour on-site response time. The base contract covers labor and parts for minor repairs up to 250 dollars per incident. All services must comply with ASME A17.1 Safety Code, ADA requirements, OSHA safety regulations, and State of Mississippi standards. The contract will be awarded to the lowest responsible and responsive bidder. To be deemed responsible, vendors must have at least five years of experience in similar services, be registered with the Mississippi Secretary of State, and hold a valid Mississippi Elevator Contractor License. Required insurance includes workers compensation and general or professional liability insurance with minimum limits of 1,000,000 dollars per occurrence, naming MSDH as an additional insured. Bids must be submitted electronically via the OpenGov Procurement portal by 2:00 pm CST on November 20, 2026. Payments will be made via the state's electronic remittance vehicle, with undisputed amounts typically paid within 45 calendar days of invoice receipt.
MS DEPT of HEALTH

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract entails the replacement of a non-functional fire hydrant at the U.S. Coast Guard Air Station Clearwater, Florida. It is a firm-fixed-price construction service solicitation, designated as a total small business set-aside under NAICS code 238290. The scope requires qualified contractors to provide all labor, materials, equipment, tools, permits, supervision, and quality control necessary for the removal of the existing hydrant and installation of a new American Darling Model 5-1/4" fire hydrant. The work must comply with industry standards, including appropriate testing, pressure and flow verification, and restoration of site conditions to their original state. The Coast Guard will furnish key hydrant components such as the fire hydrant itself, traffic flange, gate valve, and gaskets. Contractors are encouraged to perform a site visit and utility verification prior to bidding to familiarize themselves with existing conditions. Work must be coordinated with designated Coast Guard points of contact to ensure minimal disruption during normal operational hours, and the contractor must adhere strictly to safety, environmental, and security requirements, including OSHA standards and federal regulations such as the Davis-Bacon Act. Proposals are due by mid-March 2026 and will be evaluated based on technical acceptability, past performance, and price reasonableness. The contract includes detailed stipulations regarding waste disposal, site restoration, communication of work schedules, background checks for contractor personnel, and compliance with all applicable laws and regulatory clauses. The contract amount is not to exceed $13,000, with warranty coverage ensuring workmanship is free from defects for one year after completion. Final acceptance requires Coast Guard inspection and correction of any deficiencies before payment is authorized.

General Info

Replace fire hydrant at USCG Clearwater by small business; $13,000 max, compliance, warranty.

NAICS

238290 - Other Building Equipment Contractors

Place of Performance

FL, 33762, USA

Set-Aside

SBA

Documents

2

Solicitation 20150PR260000047 Replace Fire Hydrant at USCG Air Station Clearwater

PDF, High priority: read this first18 pages · rfp
High

SOW for USCG Air Station Clearwater Fire Hydrant Replacement

PDF, High priority: read this first13 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base MIAMI(00028)
Contacts2 people available
OfficeMIAMI, FL, 33132, USA
Office AddressMIAMI, FL, 33132, USA

Full Description

Show more

COMBINED SYNOPSIS/SOLICITATION CONSTRUCTION



Replace Fire Hydrant at USCG Air Station Clearwater



1. General Information



Solicitation Number: 20150PR260000047



Date Posted: 02/18/2026



Response Due Date: Friday March 13, 2026, at 2:00PM EST



NAICS Code: 238290      Other Building Equipment Contractors



Set-Aside: Total Small Business Set a Side



Contracting Office: USCG PROCUREMENT & CONTRACTINNG


12100 SW 152ND ST


MIAMI, FL 33177



Point of Contact:  Mehdi Bouayad


Email: Mehdi.Bouayad@uscg.mil


571-607-8108




2. Description of Work



This is a combined synopsis/solicitation for construction services prepared in accordance with FAR Part 36 and FAR Part 13. The U.S. Government intends to award a firm-fixed-price contract based on the lowest price technically acceptable (LPTA) or best value tradeoff method.



Scope of Work:


General:


United States Coast Guard Air Station Clearwater is accepting proposals for qualified individuals


or firms to replace one fire hydrant at Air Station Clearwater. Prior to submitting a quote, it is


mandatory to examine the scope of work and it’s highly recommended to visit the facility to take


field measurements, evaluations, etc. and become familiar with existing conditions under which


The work will be performed. After the award of contract, a pre-conference will be held prior to


starting work at Coast Guard Air Station Clearwater.


Location:


U.S. Coast Guard Air Station Clearwater


15100 Rescue Way


Clearwater, Florida 33762



Examination of Site: It is HIGHLY ENCOURAGED that bidders carefully inspect the


workplace and verify all work necessary to complete job. Prospective bidders arrange for a tour


of the job site by calling the point of contact, CWO Joe Calderon at 727-423-7586 or via email at Jose.A.Calderon@uscg.mil or  DC1 Richard Rendon at (727) 535-1437 x1550 or


by email at Richard.L.Rendon@uscg.mil, at least 3 working days in advance.



1. Continuity of Facilities Operation:


Schedule work to minimize interference with the facility operations and during the normal


operating hours of 7:00 am to 3:00 pm Monday thru Friday, excluding federal holidays. Work


may be conducted during other hours if approved in advance by coordinating with the facility


Point of Contacts (POC) listed below.



2. Notification of Start and Completion of Work:


The Contractor shall provide a simple and general schedule of work. For example, “Begin work


at ____ on _______. Work is expected to last __ days and be complete on _______.”



3. Coast Guard Points of Contact:


The Contractor shall coordinate with the following personnel to arrange access the facility.


POC’s are listed in order of preference.


Name Email / notes Phone Number


CWO Joe Calderon Jose.A.Calderon@uscg.mil 727-423-7586 (cell phone)


MKC Mike Hemmingway Jonathan.M.Hemmingway@uscg.mil


727-535-1437 x1573


DC1 Rich Rendon Richard.L.Rendon@uscg.mil 727-535-1437 x1550



Page 3 of 13


4. Recycling and Disposal of Refuse:


Minor refuse and waste materials resulting from operations may be disposed of in Air Station


Clearwater dumpsters. All disposals shall be done in accordance with federal, state, and local


laws and regulations. No Hazardous Waste or bulk waste may be disposed of in Air Station


Clearwater dumpsters.



5. Safety:


During the execution of this contract, the Contractor shall conform to the rules and regulations as


set forth by OSHA State and Federal regulations. Immediate notification to the Contracting


Officer’s Representative of lost time due to accidents is required. Provide two copies of


Workman’s compensation accident reports by noon of the day following the accident. The Coast


Guard reserves the right to bar any workers or supervisors from the premises should they be


documented as violating set safety standards and regulations.



6. Inspection:


The Contracting Officer’s Representative has the right to reject defective workmanship or


materials or work not performed as per the contract specifications.



7. Operations and Storage:


The Coast Guard has no responsibility for receipt, storage, or protection of contractor’s


materials. The Coast Guard will not accept shipments, and no materials may be stored on site


by the contractor. The contractor is responsible for the protection of existing structures and utilities


and vegetation. Any damage shall be repaired at the contractor’s expense.



8. Utilities:


Contractor is authorized to use Air Station Clearwater power and water while conducting the


work efforts outlined in this document. Any other use of power is not authorized. The unit POC’s


listed above will designate available utility connection points if necessary.



9. General Regulations while onboard Coast Guard Air Station Clearwater:



1. Daily colors and the raising/lowering of the American flag will take place every morning


at 0800 and every evening at sunset. All personnel on Base will face the main flagpole &


maintain silence and all vehicles & equipment will halt during these brief events.



2. Contractors are welcome to eat breakfast & lunch at Base in the base galley at published


meal rates. Breakfast is served from 0600-0730 daily & lunch will be served from 1100-


1230 daily in the galley. All personnel desiring meal service shall be in clean, non-soiled


clothing. The Coast guard reserves the right to refuse service to anyone it deems dirty.



3. Contractors are welcome to utilize the Base’s Exchange store; however, contracted


personnel are prohibited from purchasing any uniform, alcohol or tobacco products in it.



4. Traffic Regulations:


a. 10 mph speed limit


b. No use of cell phones is permitted while driving vehicles or operating heavy


machinery.



Page 4 of 13


c. All personnel shall obey all marked traffic signals including stop signs &


stoplights.



5. Notice shall be given to the Coast Guard’s representative 1 week in advance of any


planned outages, including any pool closure and expected duration.



6. Contractors are welcome to utilize the restrooms in the area they are currently working in


providing they are clean and do not track mud, dirt or any other debris into the


restrooms.



7. No personnel other than the Contracting Officer has the authority to alter the terms of any


contract or to issue any change orders. Accordingly, the contractor shall not complete


any work that would incur additional costs to the government without written approval


from the Contracting Officer.



10. SECURITY REQUIREMENTS:


1. The contractor shall provide a consolidated list of all contractor personnel who will be


working on Air Station Clearwater Facilities at least 1 week prior to work. This is for


routine/ standard background checks of all personnel entering the base. Information


required is full name, date of birth, and last 4 digits only of Social Security Number.



2. Only American citizens and permanent resident aliens are allowed onboard Air Station


Clearwater Facilities. Absolutely no foreign nationals are permitted on the premises.


Appropriate identification shall be provided at the front gate to attain base entry.



3. All contractor vehicles, equipment and gear onboard Coast Guard properties are subject


to search, at all times. Additionally, at all times due to security and operational needs, the


contractor is subject to orders to evacuate the property at any time.



4. Absolutely no firearms or weapons of any kind are allowed onboard Air Station


Clearwater.



5. The contractor and subcontractor personnel shall wear company identification and


always carry photo identification on their person. Personnel shall not stray from the


immediate area of work nor direct avenues of ingress and egress unless authorized in


advance.



11. SCOPE OF WORK:


Contractor shall provide all labor, trades, equipment, components, materials, tools, and


supervision necessary to replace non-functioning fire hydrant and installation of a new American


Darling 5-1/4” Fire Hydrant. All work shall be completed in accordance with industry and


manufacturing standards.


Objectives:


 Replace the existing non-functional fire hydrant with new American Darling


Model 5-1/4” Fire Hydrant.


 Ensure compatibility with the base’s water supply and fire protection


requirements.


 Restore the site to original condition.


Page 5 of 13


Contractor Responsibilities:


 Contractors shall provide all labor, materials, equipment, permits, supervision and


quality control.


 *Note* USCG is furnishing Fire Hydrant, Traffic flange, Gate valve, and


associated gaskets. (See pictures below)


 The contractor shall be responsible for repairing, at no cost to the government,


any damage caused during the installation of the fire hydrant.


Work Requirements:


Pre-Construction


 Conduct site visit and utility verification.


 Coordinate with USCG Facility Engineering for access and safety requirements.


 Perform utility locates.


 Submit product data for approval.


 Identify potential interferences and job hazards


Demolition and Removal


 Identify Main Water Supply control and isolation valves (see pictures below)


 Isolate and depressurize the water main.


 Excavate around the hydrant assembly.


 Remove hydrant and associated parts.


 Dispose of materials as per regulations.


Hydrant Installation


 Install a new American Darling fire hydrant, including Traffic flange, 5-1/4” and


any associated parted needs.


 Gravel bed if required.


 Proper burial depth.


 Hydrant orientation per local and city codes.


Testing and Operation


 Flush service line


 Pressure test per AWWA C600.


 Flow test of hydrant to verify leak free operation, proper drainage, adequate flow


and residual pressure.


 Demonstrate operation to USCG Facilities.


Site Restoration


 Backfill excavation


 Restore pavement, concrete, and landscaping disturbed during work to original


condition or better.


 Apply corrosion protection to exposed metal hardware as required.


 Paint hydrant red.


Deliverables


 Pressure and flow test results


 Drawings (If applicable)



Page 6 of 13


Contractor shall be responsible for the removal of all trash and debris from project area off site


upon completion.


All work must be approved by the Contracting Officer’s Representative.



Warranty:


The Contractor warrants that all workmanship shall be free from defects for a period of one years


from the date of substantial completion.



12. ACCEPTANCE OF WORK:


When the contractor has completed all work, they shall notify the Coast Guard (COR) for a final


inspection with least a 24-hour notice. If there are any project discrepancies noted, they shall be


corrected within 5 business days of discovery. The work will be accepted as complete upon


verified correction of any/ all noted discrepancies. After work acceptance, the contractor shall


submit final invoice to the Coast Guard as directed by the COR.



Place of Performance:


USCG Air Station Clearwater


15100 Rescue Way


Clearwater, FL 33762



Magnitude of Construction:


Not to exceed $13K



3. Submission Details



Proposals Due By: Friday Mar 13, 2026/2pm EST


Submission Method: [Email Mehdi.Bouayad@uscg.mil or Mailed Bids]



Technical Proposal (demonstrating capability and experience).



Price Proposal (detailed cost breakdown).



Past Performance References will be reviewed



4. Site Visit Highly Recommended but not mandatory **************** Wednesday Feb 25, 2026 at 10:00AM EST*****************



Site Visit Coordinator is CWO Joe Calderon           Email: Jose.A.Calderon@uscg.mil            Phone: 727-423-7586



5. Evaluation Criteria



Award will be made based on [Lowest Price Technically Acceptable (LPTA) / Best Value] criteria. Proposals will be evaluated on:



1. Technical Acceptability – Demonstrated experience in similar projects.




2. Past Performance – Positive references from previous construction work.




3. Price Reasonableness – Competitive pricing aligned with market rates.




6. Contract Terms and Conditions



This procurement is subject to the following:



Davis-Bacon Act Compliance: Wage Rates FL20260222 Revised on 01/02/2026



FAR Clauses 52.236-2 (Differing Site Conditions), 52.236-3 (Site Investigation), 52.236-5 (Material and Workmanship), 52.236-7 (Permits and Responsibilities).



Other federal, state, and local regulations governing construction contracts.




7. Inquiries



All questions regarding this solicitation must be submitted in writing to CWO Joe Calderon no later than Tuesday Mar 10, 2026.



Issued By:


Contracting Officer Mr. Mehdi Bouayad


United States Coast Guard



8. Additional Clauses and Provisions


8.1 Safety and Health Requirements


The contractor shall comply with:


  • Occupational Safety and Health Administration (OSHA) Standards (29 CFR 1926) for construction safety.
  • U.S. Army Corps of Engineers Safety Manual EM 385-1-1, if applicable.
  • Submission of a Site-Specific Safety Plan (SSSP) within [X] days after award.
  • Implementation of Personal Protective Equipment (PPE) and safety measures for workers on-site.

8.2 Environmental and Sustainability Requirements


  • The contractor shall comply with National Environmental Policy Act (NEPA) and all EPA regulations.
  • Use of environmentally preferable products and materials in accordance with FAR 23.1 (Sustainable Acquisition Policy).
  • Proper disposal and handling of hazardous materials per Resource Conservation and Recovery Act (RCRA).
  • Stormwater Pollution Prevention Plan (SWPPP) implementation (if applicable).

8.3 Compliance with the Davis-Bacon Act


For contracts over $2,000, the contractor shall comply with the Davis-Bacon Act (40 U.S.C. 3141–3148):


  • Submit certified payroll reports weekly.
  • Pay laborers and mechanics at least the prevailing wage rates specified in the wage determination.

8.4 Delays and Liquidated Damages


  • If the contractor fails to complete work by the agreed deadline, the Government may impose liquidated damages of $[X] per calendar day of delay.
  • Delays due to unforeseen conditions (e.g., weather, force majeure) must be reported within 24 hours and documented.

8.5 Subcontracting Limitations


  • In accordance with FAR 52.219-14, at least 15% of the contract value must be performed by the prime contractor (for general construction).
  • Subcontractors must be pre-approved, and the prime contractor remains liable for their compliance.

8.6 Material and Workmanship Standards


  • All materials shall conform to industry standards (ASTM, ANSI, etc.) and be subject to Government inspection.
  • The Government reserves the right to reject defective work and require rework at contractor’s expense.

8.7 Bonding and Insurance Requirements


  • For contracts over $150,000, performance and payment bonds are required per FAR 28.102-1.
  • Contractors shall maintain liability insurance in the following amounts:
    • General Liability: $1,000,000 per occurrence.
    • Workers’ Compensation: As required by state law.
    • Automobile Liability: $500,000 per accident.

8.8 Inspection and Acceptance


  • Work will be inspected by the Contracting Officer’s Representative (COR).
  • The Government reserves the right to reject non-conforming work and withhold payment until deficiencies are corrected.

8.9 Buy American Act Compliance


  • Materials must comply with the Buy American Act (FAR 52.225-9) unless an exemption is approved.

8.10 Dispute Resolution and Claims


  • Disputes shall be handled per FAR 52.233-1 (Disputes Clause).
  • The contractor must attempt to resolve disputes through negotiation before escalating to formal claims.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS