This Solicitation opportunity from Department Of Defense was posted on June 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Replace Flooring Bldg 102 & Bldg 110
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract, identified as W50S6T26QA021, is a total small business set-aside under NAICS code 238110 for the replacement and reconditioning of flooring in Building 102 and Building 110 at Fresno Air National Guard Base, California. The scope includes removing approximately 1,260 square feet of existing vinyl and carpet flooring and reconditioning about 4,825 square feet of concrete subfloors, ultimately installing polished concrete flooring with non-skid protective layers in both buildings. The project requires strict adherence to a specified grinding and polishing sequence of 40, 80, 150, 400, and 800 grit, mandatory moisture testing per ASTM F2170, and full compliance with manufacturer specifications through a manufacturer-approved contractor. A 200-square-foot mock-up must be constructed and approved in each building prior to full-scale work. The performance period runs from June 30, 2026, to September 30, 2026, with the contractor required to begin work within 10 calendar days of receiving the notice to proceed and complete all tasks within 30 calendar days. A site visit is tentatively scheduled for May 27, 2026, at the west gate parking lot, and all personnel must complete DBIDS prequalification and submit a base access form at least five business days in advance to gain entry. The contract is structured as a firm fixed price with a total estimated value between $25,000 and $100,000, and compliance with federal regulations is stringent. The contractor must submit either a payment bond or an irrevocable letter of credit for 100 percent of the contract value within 10 days of award, covering performance plus one year. All personnel must undergo AT Level I antiterrorism training within 45 days of contract start and carry proper identification at all times while on base. Compliance with the Davis-Bacon Act wage determinations, Buy American requirements, NIST SP 800-171 cybersecurity standards, and far 52.222-50 anti-trafficking regulations is mandatory. Technical deliverables such as the project schedule, safety plan, quality control plan, material safety data sheets, and as-built documentation must be submitted electronically to the Contracting Officer’s Representative in
General Info
Agency
NAICS
Place of Performance
Fresno, CA, 93727, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The scope of work for this requirement involves removing approximately 1,260 square feet of vinyl and carpet flooring, reconditioning approximately 4,825 square feet of existing floors in two separate buildings. The Contractor shall provide all necessary supervision, labor, materials, tools, and equipment necessary to accomplish the work, as identified in the Statement of Work.
The magnitude of this requirement is between $25,000 and $100,000.
A site visit is tentatively scheduled for Wednesday 27 May at 0800 PDT. The designated rally point will be the west gate parking lot. Parking space is limited, carpooling is strongly advised. Offerors must complete the Defense Biometric Identification System (DBIDS) Prequalification and be listed on the base access form to obtain base access. Complete all fields under the CONTRACTOR/VENDOR/VISITOR INFORMATION section consisting of attendee names, citizenship, and DBIDS code (6-digit code). The base access form must be provided 5 business days before the site visit. Refer to Attachment, Base Access Request for additional instructions.
As required by 15 U.S.C. § 644(w), implemented by RFO FAR 36.101-4, the following information is provided to interested small businesses:
(A). The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204.
(B). Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below:
Selected Agency: DEPT OF THE ARMY
Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts: Number of Change Order Proposals definitized under Construction Contracts
30 days or less: 0
31 to 60 days: 1
61 to 90 days: 0
91 to 180 days: 0
181 to 365 days: 1
Greater than 365 days: 1
After completion of contract performance via a contract modification addressing all undefinitized equitable adjustments received during contract performance 2
Update 1: Questions and Answers, Images of Flooring and Drawings are attached.
More opportunities from Department Of Defense → W7MX Uspfo Activity Caang 144
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
