Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Replace Hardy Creek Bridges Phase 1 [pd]

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Replace Hardy Creek Bridges Phase 1 project, managed by the Fish and Wildlife Service under the Department of the Interior, focuses on the initial design phase for the demolition and replacement of two aging structures. The project involves the Upper Hardy Creek Bridge, measuring 42 by 10 feet, and the Lower Hardy Creek Bridge, measuring 46 by 16 feet. Both bridges were originally constructed in 1970 and have reached a state where their replacement is critical to maintaining essential vehicle and equipment access to the Refuge. This forecasted procurement is categorized under NAICS code 541330 and is slated for performance in North Bonneville. The project was posted on September 30, 2025, and serves as a vital step in ensuring the long-term infrastructure stability of the area. Interested parties can coordinate with designated points of contact, including Brad Senatra for general inquiries and Josh Gordon for small business assistance, to obtain further information regarding this design phase.

General Info

Design phase for demolishing and replacing two aging Hardy Creek bridges in North Bonneville.

Agency

Department of the Interior → Fish and Wildlife ServiceView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

North Bonneville, WA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment of the Interior → Fish and Wildlife Service
Contacts2 people available
OfficeN/A
Organization / Agency
Department of the Interior → Fish and Wildlife Service
View Agency Profile
Office AddressN/A
Contacts

Full Description

Show more
This project is phase 1 design for demo and replacement of two Upper and Lower Hardy Creek Bridges: Upper 42- by 10-foot and Lower 46- by 16-foot. Both built in 1970. Without replacement the service has no access to the Refuge for vehicles and equipment.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (Work Order C2305) on behalf of the Elsinore Valley Municipal Water District in California. This professional services agreement seeks qualified DBE firms to provide comprehensive design, bidding support, and engineering services during construction. The scope is divided into two phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of a new well and the abandonment of the existing one; Phase 2 covers architectural, civil, mechanical, structural, electrical, and I&C design drawings, as well as equipping, testing, and commissioning. Technical requirements specify the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA potable water well construction standards, Riverside County, and California State Water Resources Control Board regulations. The contract is set aside for small and disadvantaged businesses, including DBE, WOSB, and SDVOSB entities. Award selection is based on the most advantageous proposal, considering both price and other factors. Key requirements include the provision of performance and payment bonds for 100 percent of the contract price, a bid guarantee of five percent, and adherence to California prevailing wage laws. Consultants must maintain active SAM registration and provide a project manager as the primary point of contact. Payment is processed via monthly itemized statements, with a 45-day review and payment cycle. Proposals must be submitted via PlanetBids by September 1, 2026, and must include a cover letter, a detailed project approach, staff resumes, a five-year representative project list, and three professional references.
Ardurra Group, Inc.

POSTED

about 6 hours ago

DEADLINE

in 8 days
View Details

More opportunities from Department of the Interior → Fish and Wildlife Service

Same awarding agency