Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Homeland Security was posted on July 15, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Replace Lighting Fixtures

Closed
HSTS07-15-R-00057Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections to identify thermal anomalies, installing standardized external oil sampling devices for safer collection, and performing detailed oil testing analysis. Additionally, the contractor is required to evaluate nitrogen blanket systems to ensure positive pressure is maintained, provide on-site training for agency staff on inspection tools, and develop comprehensive standard operating procedures. All work must adhere to strict technical and safety standards, including ASNT Level 1 certification for thermography, ASTM D923 and D924 for oil sampling, and NFPA 70E safety protocols. The agency intends to make a single award to the most capable and cost-effective offeror, evaluating candidates based on their staffing plan, personnel availability, fee structure, and a proven track record of performing similar projects for utilities or industrial facilities. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed project approach, company profile, and required certifications such as non-collusion and workers compensation. The resulting contract will feature fixed pricing for an initial term with potential one-year extensions. Awardees must comply with California Labor Code prevailing wage requirements and maintain strict confidentiality regarding all agency reports and data.
Inland Empire Utilities Agency

POSTED

about 4 hours ago

DEADLINE

in 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves a qualified electrical contractor inspecting, testing, repairing, and certifying emergency lighting systems across the facility, including the cafeteria, recreation building, and dormitories. Key tasks include performing functional tests by simulating utility outages, replacing failed ballasts with LED-compatible versions, and applying durable labels to fixtures for future tracking. The contractor must ensure full compliance with NFPA 101 (2024 Edition) and NFPA 70 standards, integrate recurring maintenance into the center's Computerized Maintenance Management System, and provide certificates of disposal for hazardous materials. The estimated contract value ranges from $25,000 to $100,000, with a performance period of 30 business days following the Notice to Proceed. Bids are due by December 1, 2026, and must include a detailed cost breakout and a mandatory physical site visit. For bids of $25,000 or more, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This solicitation is set aside for small businesses and various SBA-certified categories. Award decisions will be based on overall best value. Compliance requirements include adherence to the Davis-Bacon Act, Federal Contractor Minimum Wage, and FAR regulations regarding work hours, safety standards, and the Buy American Act.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 238210
New
SLED
122-2707 Wiring & Fiber Placement Services
Solicitation # 112-2707
The State of North Dakota, through its Information Technology Department and the Office of Management and Budget, is soliciting proposals under solicitation 112-2707 for statewide voice and data wiring and fiber placement services. This is an open-ended cooperative purchasing contract established pursuant to N.D.C.C. section 54-44.4-13, allowing various state entities, government agencies, and nonprofit organizations to utilize the services. The contractor will be responsible for installation, repair, and miscellaneous cabling services, including field testing, documentation, and labeling according to state standards. Performance is managed on a per-request basis, with the contractor required to respond to service requests or statements of work within two business days. Proposals must be submitted via NDBuys by November 20, 2026, and must be divided into separate technical and cost volumes. The award is based on a 100-point scale, with 45 points allocated to the cost proposal and the remainder to the technical evaluation, though a minimum technical score of 36 points is required to proceed. Key contractual requirements include compliance with the Americans with Disabilities Act, registration with the North Dakota Secretary of State, and potential criminal history record checks for staff. The state maintains a five-day review period for deliverables and a twelve-month verification window following final acceptance to ensure product conformity. All contractors must utilize state sales tax exemption number E-2001 and provide a valid vendor tax identification number.

POSTED

about 18 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Transportation Security Administration Office of Law Enforcement is seeking a fixed price construction contract for the removal of 288 outdated 250W metal halide floodlights and the installation of new exterior rated LED fixtures at three firing range buildings within the TSA Training Center in Atlantic City, New Jersey. This project is a total small business set-aside under NAICS code 238210, with an estimated value between $100,000 and $250,000. The contractor is responsible for providing all labor, materials, and equipment, including the disposal of all debris and the provision of ten spare light fixtures. Work must be performed during normal business hours and completed within 90 calendar days from the notice to proceed, starting 30 days after the contract award. The selected contractor must have at least five years of experience in similar commercial lighting installations and must submit a Work Management Plan and manufacturer submittals for approval before beginning. Compliance with OSHA, NEC, and USACE safety standards is mandatory, and government escorts are required for all site access. Performance and payment bonds are not required, but Service Contract Act Wage Determinations apply.

General Info

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

William J. Hughes Technical Center TSA Training Facility Ranges, Buildings 291 F, G, and H. Atlantic City International Airport, ATLANTIC CITY, NJ, 08405, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Contracting And Procurement
Contacts1 person available
OfficeSpringfield, VA, 20598, USA
Office AddressSpringfield, VA, 20598, USA
Contacts
Mario F MaccaroneContracting Officer

Full Description

Show more
The Transportation Security Administration Office of Law Enforcement has a requirement for a fixed price construction contract for lighting fixtures at the firing ranges at the TSA Training Center (TSATC) at the William J. Hughes Technical Center in Atlantic City, NJ. Please see the attached Statement of Work for all the details. This requirement is a total small business set-aside in accordance with NAICS code 238210. Contractor will be responsible for all removal and disposal of debris I/A/W/ local, state and federal regulations. The total estimated value for this project is between $100,000 and $250,000.00. Service Contract Act Wage Determination will apply. Performance and payment bonds are not required. Construction shall commence 30 calendar days from date of the contract award with completion not to exceed 90 days from the notice to proceed. A mandatory site visit site visit will be held on July 30, 2015, at 10:00 AM, EST with all parties meeting at the Security Operations Center Main Gate. Security issues require companies to identify personnel whom will be attending this site visit. The POC for the site visit and solicitation is Mario Maccarone at Mario.maccarone@tsa.dhs.gov. All contractors who are interested in this opportunity must identify their interest by pre-registering with the POC via e-mail prior to the site visit. The solicitation document will then be issue to all who attend the site visit. TRANSPORTATION SECURITY ADMINISTRATION TRAINING CENTER REAL ESTATE LEASING DIVISION WILLIAM J. HUGHES FAA TECHNICAL CENTER ATLANTIC CITY, NJ 08405 PART 1 - SCOPE OF WORK: GENERAL: The work to be performed under this contract and in accordance with this Statement of Work shall consist of removal of the existing outdated lighting fixtures and installation of new Exterior Rated LED style light fixtures. (LED - Light-Emitting- Diode). In accordance with TSA's new energy policy requiring the reduction of electrical usage, these LED lights should allow a 60% reduction in the amount of energy used and last up to 10 years or more while providing better color rendition. Work to include all parts, labor and material for a complete operating system. HOURS OF WORK: All work shall be completed during normal working hours. Normal working hours are defined as Monday through Friday, 7:00 A.M. to 5:30 P.M., except Federal Holidays. Before starting the project, the contractor shall submit an installation schedule for the Contracting Officer's Representative (COR) for approval. Prior to, or during, the project the COR reserves the right to adjust the installation schedule for the convenience of the government LOCATION: All services will be rendered at the Transportation Security Training Center buildings located on the William J. Hughes FAA Technical Center complex. Buildings to include: - 291F - Range 1 - 291G - Range 2 - 291H - Range 3 SUPPLIES: Supplies can be stored prior to installation in each building, location set by COR. EXISTING LIGHT FIXTURES - All existing interior Range Light Fixtures to be removed are 250W metal halide floodlights. Existing light fixtures are 120V, yoke mount. Use existing beam clamps. Fixture count is 96 fixtures per Range building (288 total). Approximately 1/3 of the light fixture junction boxes have twist lock receptacles installed. The remaining fixture power cords are hard wired into the junction box. The junction boxes with the twist lock receptacles are single device NEMA L5-15 with a 2 gang white single device cover plate. OPERATON AND MAINTENANCE DATA: Submit manufacturer's printed operation and maintenance prior to completion. QUALITY ASSURANCE: Installer Qualifications: At least 5 years successful experience in commercial lighting installations similar in size and type to the requirements of the project. WORK MANAGEMENT PLAN: The contractor shall submit a Work Management Plan, prior to beginning any work, for approval. Plan to detail how the Contractor intends to perform the work required in the contract, including but not limited to area protection, area security, safety and application schedule. WORK AREA ACCESS: Government escorts are required while within the confines of the William J. Hughes Technical Center. Each morning of scheduled work, a government representative will meet you at the main entrance, in the parking lot of the WJHTC Security Operations Center. Temporary badges and vehicle passes will be provided and the Contractor and his\her vehicles will be escorted to the work site. SAFETY: All Contractor operations shall be conducted and performed in accordance with Department of Labor, OSHA requirements found in 29 CFR 1910 (1910.146 and 1910.147) and 29 CFR 1926. The Contractor shall ensure that all work is performed in accordance with project identified national standards, instructions, pamphlets, and handbooks, and with the edition in effect on the date of this solicitation of the US Armory Corps of Engineers (USACE) Safety Manual 385-1-1. Hard hats required for when working with all overhead equipment. Contractor to utilize all safety barricades, cones, caution tape, etc. when using bucket trucks and service equipment. Job sites are subject to inspections by the Department of Labor, FAMS Inspector and the Federal Aviation Administration. In the event of conflicts between the OSHA standards and these requirements, the most stringent shall apply. Resolution of Department of Labor citations for violations of OSHA standards is a Contractor responsibility and shall provide for no basis of a claim against the Government. GOVERNMENT PROPERTY: The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor fails to use reasonable care and causes damage to any of the property, the Contractor shall replace or repair the damage at no expense to the Government. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price. SITE MAINTENANCE & CLEANUP: Work area shall be maintained in a neat, clean, and safe condition and shall, at a minimum, be cleaned at the end of each shift. All area's in or adjacent to the site shall remain free of project generated trash and debris at all times. Disposal shall be outside the limits of Government property. Disposal shall be by sanitary landfill or other approved methods and shall conform to al local, state, and federal guidelines, criteria, and regulations. Upon completion of the work, the Contractor shall leave the work site and storage area(s) in a clean, neat condition satisfactory to the COR. Contractor to provide own dumpster. Coordinate delivery with COR. SUBMITTALS: The Contractor shall provide submittals in the form of manufacturer's data for all LED fixtures, associated brackets, to be provided with proposal. The Contractor will not be permitted to perform any work on site without approved submittals. These submittals include, but are not limited to: - LED fixtures - Safety Management Plan - For Information Only - Work Management Plan WARRANTY: The Contractor shall identify all items being installed that are guaranteed or under warranty for more than a one-year period, and provide validated copies of the manufacturer's warranty. All warranty information shall be filed by the Contractor in the Government's name. All warranties shall be identified by product with a listing of the name and address of the company and the expiration date of the guarantee or warranty. DELIVERY, STORAGE & PARKING: All equipment and material delivered and stored shall be protected from the weather, humidity and temperature variation, dirt, dust, and any other contaminants. The Contractor may store equipment and material only in areas designated by the Contracting Officer's Representative. All project storage areas shall be kept free of debris and kept in a neat, clean, and safe condition. Parking on turf is not permitted without prior approval. Contractor will not be required to provide their own portable toilets and will be allowed to use Government lavatory facilities. PART 2. - PRODUCTS REFERENCES TO MATERIAL, MANUFACTURERS, & PRODUCTS: Materials and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture of the products. All new LED light fixtures to be similar to GL Series LED Floodlight GL-Y-150-40-7-W-U-DG, manufactured by Eye Lighting International, or approved equal. VERIFICATION OF DIMENSIONS & CONDITIONS: The Contractor shall visit the premises to become thoroughly familiar with the details of the work and working conditions. The Contractor shall field verify all dimensions and quantities and advise the COR of any discrepancies before starting the work. CONTRACTOR PROVIDED MATERIALS: The Contractor shall provide all equipment, materials and labor necessary to complete the work required. PART 3. - EXECUTION GENERAL: All work shall be provided as stated in this STATEMENT OF WORK, and as shown on project documents, in accordance with manufacturer's recommendation, unless otherwise specified. All dimensions and quantities shown are for information only, as previously mentioned, the Contractor shall field verify all dimensions, quantities and site conditions. Existing lighting fixtures are to be removed and disposed of, off Government property. APPLICATION: All work shall be prepared and installed according to manufacturer's recommendations and in accordance with industry best practices. 1. Each existing Metal Halide Light fixture to be removed and be replaced with a new LED fixture. 2. Lighting fixtures to be 4,000K - light index 3. All new light fixtures to be rated for exterior use, UL listed for wet locations. 4. All new light fixtures to be cord and Twist Lock plug connected. NEMA L5-15 5. All new light fixtures to be commercial grade quality. 6. Provide 10 spare light fixtures with cord ends as spares. 7. All new fixtures to be wired to existing switched power wiring. 8. All new light fixtures to be Yoke mounted. Aim as per COR direction or as per previous light fixture. 9. All new light fixture power cords to have a NEMA L5-15 twist lock male plug attached. 10. All power junction boxes to have NEMA L5-15 twist lock single receptacle. Provide a 2 gang white cover plate to match. 11. Provide one sample light fixture for testing and approval, if different than GL Series light fixture listed in Products. 12. Provide manufactures submittals for Government approval prior to ordering. 13. The work for this project shall be executed in the best and most workmanlike manner, by qualified and efficient mechanics\tradesmen, skilled in their respective trades. Individual trade work for this project shall be performed and quality maintained by the applicable trade only. The Contractor shall assure that all trades coordinate their work with that of other trades. The Contractor shall coordinate and perform all operations in a manner that will result in a professional and expeditiously completed project. The work shall be in strict accordance with prevailing industry standards and manufacturer's instructions. Work and materials shall comply with this Statement of Work and the editions in effect at the time of this solicitation for applicable criteria, regulations, guidelines, and codes, all of which are make a part thereof. Contractor to be licensed. Provide a work management plan for approval by the Contract Officer's Representative. 14. All removed fixtures, debris to be disposed and removed. Contractor to provide own dumpster. All removed fixtures to be recycled or reused by Contractor. 15. All installation and wiring shall meet the requirements of the National Electrical Code (NEC) the National Electrical Safety Code (ANSI-C2) and the International Building Code (IBC), as a minimum. WORKMANSHIP: All work shall be coordinated and scheduled with the Contracting Officer's Representative (COR) or his/her representatives. The COR, or his/her representatives, have the right to reject any unsatisfactory or unsuitable materials, or workmanship. All work shall be accomplished in accordance with the best practices of the trade. All work shall comply with applicable Federal, State and municipal health and safety requirements. Where there is a conflict between applicable regulations, the most stringent will apply. The contractor shall provide all necessary safety equipment and ensure that such equipment and safety procedures are adequate for the job being performed and utilized properly. COMPLETION & INSPECTION: The Contractor shall ensure that all work is performed in accordance with the criteria herein and that all requirements contained in this and all other project documents are met. END OF STATEMENT OF WORK

More opportunities from Department Of Homeland Security → Contracting And Procurement

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS