Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Replace Physical Plant Boilers #2 and #3

Open
2141036State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The State University Construction Fund is seeking Statements of Qualifications from consultants to provide design and construction administration services for the replacement of Physical Plant Boilers #2 and #3 at Farmingdale State College, State University of New York. The project involves replacing two end-of-life boilers with new high-efficiency, flexible-temperature boilers and installing new control systems for all boilers. The scope of work includes the removal of hazardous materials and the evaluation of supporting plant systems, including water treatment, fuel oil quality management, and the potential replacement of primary electrical infrastructure such as the transformer switchgear and emergency generator. The estimated construction value for this project is approximately $12,987,000. Interested consultants must register via the Fund's website to receive the Request for Qualifications and the link for electronic submission of their Statement of Qualifications. Paper or emailed submissions will not be accepted. The procurement includes specific socioeconomic goals, with a 15% goal for both Minority Business Enterprises and Women Business Enterprises, and a 6% goal for Service-Disabled Veteran-Owned Businesses. All inquiries must be directed to designated personnel in accordance with State Finance Law and the NYS Procurement Lobbying Law to avoid disqualification.

General Info

Consultants sought for boiler replacement and system upgrades at Farmingdale State College.

Place of Performance

Farmingdale State College, State University of New York, NY, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfq
High

Read the document

Due in 25 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 25 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNew York → State University Construction Fund
Contacts2 people available
OfficeN/A

Full Description

Show more
The State University Construction Fund (SUCF) is seeking Statements of Qualifications (SOQs) from consultants to provide design and construction administration services for the Replace Physical Plant Boilers #2 and #3 project at Farmingdale State College, State University of New York. The Heating Plant is a 14,806 GSF facility constructed in 1950 that serves as the campus's primary source of steam generation for heating and domestic hot water. The existing plant contains four steam boilers that provide high pressure steam to the campus. Boilers #2 and #3 have reached the end of their useful life and present increasing operational and maintenance concerns. This project will replace Boilers #2 and #3 in the Heating Plant with two new high efficiency, flexible-temperature boilers and install new boiler control systems for all boilers. The work will also include evaluation and potential upgrades to supporting plant systems, such as water treatment improvements, and fuel oil quality management. In addition, the project will evaluate and potentially replace the Heating Plant’s primary electrical infrastructure, specifically the transformer switchgear and emergency generator. The project includes the removal of associated hazardous materials. The construction value is estimated to be approximately $12,987,000.Consultants are required to register for this procurement opportunity on the Fund’s website at: https://sucf.suny.edu/design-consulting-services/procurements-advertised Once registered, consultants will receive an email with the applicable Request for Qualifications (RFQ) and the link to upload your Statement of Qualifications (SOQ) at the submission deadline. To register your firm, please “click” on the link Request RFQ Format. Please complete the registration form and then “click” Submit Registration. Once your registration is submitted, you will receive a confirmation number and the RFQ via email. Should you experience any issues with registering, email your request to: Sign up to see this detail SOQs must be submitted in the format prescribed by the Fund using the link provided in the email received after registration that supplies the RFQ. Required electronic copies of Statements of Qualifications (SOQs) must be received by the due date and time specified in the RFQ. Paper or emailed copies of SOQs will not be accepted. In accordance with State Finance Law §139-j and §139-k, all inquiries regarding this procurement can only be made to: · Samantha Lord · Nora Kanarkiewicz · Jeremy Clausi · Kelly Whitbeck M/WBE SDVOB Issues Only · Scott Clay · Joanne Lovelady · Joseph Francis Any questions regarding this procurement should be emailed to: Sign up to see this detail. For questions related to M/WBE SDVOB, please email: Sign up to see this detail. Failure to adhere to this provision may result in the disqualification of your firm under NYS Procurement Lobbying Law. For more information on Procurement Lobbying, please refer to the Fund’s website at https://www.sucf.suny.edu/business/ppolicy.cfm. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: NONE Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 15.00% WBE Goal: 15.00%

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
FMP-8A Kasch Park Zero Emissions Phase 1 & Underground Storage Tanks Replacement - Construction Management Services
Solicitation # 2026-156
Community Transit is soliciting Request for Qualification 2026-156 for Construction Management Services (CMS) to oversee two concurrent capital improvement projects at the Kasch Park Campus in Everett, Washington. The first project, Facilities Master Plan Phase 8A, focuses on the installation of Battery Electric Bus (BEB) charging infrastructure to support the transition from diesel to electric fleets. The second project involves the replacement of aging underground storage tanks with a new high-capacity aboveground storage tank system. The selected Construction Management Team will be responsible for project management, preconstruction, field inspection, and quality documentation, including the provision of one full-time on-site inspector to monitor progress and safety. The contract is structured as a Cost Plus Fixed Fee (CPFF) agreement, with a projected timeline starting in April 2027 and anticipated completion in October 2028. Award selection follows a Qualifications Based Selection (QBS) process based on the Brooks Act or RCW 39.80, evaluating firm qualifications (50 points), key personnel (40 points), and small business and equity commitments (10 points). Proposals must be submitted via the agency portal by January 6, 2027, and must include a Statement of Qualifications limited to 15 pages, a completed questionnaire, and a conflict of interest certification. There is no specified set-aside status for this solicitation.
Community Transit

POSTED

about 3 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541330
New
International
Red Deer Polytechnic - Negotiated Request for Proposal - Campus Fire Alarm Modernization-Consulting Service
Solicitation # 270655
Red Deer Polytechnic is seeking consulting services for a multi-year, multi-phase Campus Fire Alarm Modernization program in Red Deer, Alberta. The project focuses on replacing the existing Edwards EST3 platform and upgrading campus fire alarm, life safety, and emergency voice communication systems. The selected consultant will act as an independent technical adviser and co-project-management resource, delivering a scope of work divided into four phases. Key deliverables include existing systems audits, gap analysis against the 2023 Alberta editions of the National Building Code and National Fire Code, drafting a Request for Information (RFI), developing sealed design documents, and performing predictive acoustic modeling and Speech Transmission Index analysis. The procurement process utilizes a multi-stage evaluation based on mandatory submission and technical requirements, non-price rated criteria, and pricing submitted as binding fixed lump-sum fees in Canadian funds. Successful proponents must provide evidence of Workers' Compensation Board coverage in good standing and comply with Alberta Occupational Health and Safety laws. The contract term begins upon execution and continues until deliverables are complete, though Red Deer Polytechnic reserves the right to authorize phases individually. Payment is issued within 30 days of receiving accurate invoices. There is no specified set-aside status for this solicitation.
Red Deer Polytechnic

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
RFQ to Provide Enfineering Services
Solicitation # RFQ 002-2026
The City of Avondale Estates is soliciting Statements of Qualifications (SOQs) from qualified engineering and design firms for the Downtown Avondale Multimodal Improvements – Shared Streets project (GDOT PI 0021589). Located in the Central Business District of DeKalb County, Georgia, the project encompasses approximately thirteen blocks across Olive, Washington, Franklin, Oak, Center, and Parry Streets. The objective is to create a safe, connected multimodal network using shared-street design principles, incorporating traffic calming, pedestrian and bicycle accommodations, streetscape improvements, landscaping, lighting, and drainage. The project is divided into several phases, with preliminary engineering and design anticipated from October 18, 2027, to March 8, 2030, followed by right-of-way acquisition through April 1, 2031, and construction beginning July 15, 2031. The selection process is based on the best interest of the sponsor, with evaluation weights assigned to the technical approach (40%), project manager and resource capacity (20%), and past performance (10%). All participating firms must meet GDOT prequalification requirements and comply with non-discrimination mandates, including Title VI of the Civil Rights Act of 1964 and Title 49 CFR Part 21. Required submissions include a notarized certification form, a Georgia Security and Immigration Compliance Act affidavit, and a detailed SOQ. There is no set-aside status for this solicitation. Final contract fees will be determined through negotiations with the highest-ranked consultant.
City of Avondale Estates

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from New York → State University Construction Fund

Same awarding agency

NAICS: 236220
New
SLED
Install Thermal Energy Network
Solicitation # 2141021
The State University Construction Fund is seeking Statements of Qualifications from entities capable of providing progressive Design-Build services for the installation of a District Thermal Energy Network at the State University College at Purchase in Westchester, New York. The project scope encompasses design, engineering, permitting, site preparation, construction, and commissioning, with a total secured funding limit of $50,000,000. The procurement process is structured in two steps, beginning with design and preconstruction services, while the transition to the construction phase is dependent upon an agreed-upon scope, cost, and schedule. The contract term is four years. Interested offerors must register on the Fund's website to receive the Request for Qualifications and the mandatory electronic submission link; paper or emailed submissions will not be accepted. The deadline for submitting the Statement of Qualifications is January 6, 2027. This procurement includes specific socioeconomic goals, including a 6.00% goal for Service-Disabled Veteran-Owned Businesses and 15.00% goals each for Minority and Women Business Enterprises. All communications must be directed to authorized personnel in accordance with the NYS Procurement Lobbying Act and State Finance Law sections 139-j and 139-k to avoid disqualification.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in about 2 months
View Details
NAICS: 236220
New
SLED
Renovate Corey Union
Solicitation # 2140926
The State University Construction Fund is soliciting bids for a comprehensive gut rehabilitation of the Corey Union in New York. The scope of work includes demolition, abatement, the installation of new MEP and fire sprinkler systems, a new interior layout, and the installation of new elevators. Additionally, the project involves renovating the third-floor catering kitchen, revising exterior landscaping and building entries, and replacing and increasing exterior glazing on the street side of the building. A project-specific Project Labor Agreement (PLA) has been adopted, which promotes bidding from both union and non-union contractors; however, the low bidder must execute and abide by the PLA terms, which also impact acceptable staffing patterns. Bidders must provide evidence of skill, experience, and financial qualifications. Required documentation includes the certification of the NYS VendRep questionnaire or a notarized CCA2 form (Version 3/22), Attachments A, B, and C, the Appendix A form, and work descriptions, all of which must be submitted within 48 hours. Principal subcontractors must also be named within 48 hours of the bid opening. The project establishes specific socioeconomic goals, including an 18% MBE goal, a 12% WBE goal, and a 3% SDVOB goal, alongside EEO goals of 6% for minority and 3% for female workforce participation. This is a single bid project with no set-aside status.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS