REPLACE SEWER LINE BETWEEN SMH23A TO SMH23 (NEAR UPH 17)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This project involves the replacement of an existing 65-linear-foot reverse slope sewer line located between SMH23A and SMH23 near UPH 17. The scope of work requires the installation of a new 8-inch diameter PVC sewer pipeline. To facilitate this installation, the contractor must perform excavation and backfilling for a trench measuring approximately 2.5 feet in width, 4 feet in depth, and 65 feet in length. The contract is a forecast issued by Navfac Far East under the Department of the Navy. While specific solicitation numbers and set-aside details are not provided in the current forecast, the project is officially tracked for future procurement activities. Interested parties can monitor updates through the designated Department of the Navy small business resources.
General Info
Agency
NAICS
Place of Performance
USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Department Of The Navy → Navfac Far East
Same awarding agency
