Replacement of Energy Dissipating Valve Hydraulic Piping Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Central Coast Water Authority is seeking a contractor for the Replacement of Energy Dissipating Valve Hydraulic Piping Project located in San Luis Obispo, California. The project focuses on the Energy Dissipating Vault, which utilizes two multi-jet sleeve valves to regulate water flow within the Coastal Branch pipeline. Due to corrosion of the existing carbon steel piping and hose assemblies used to actuate these valves, the project requires the demolition of the current system and the installation of new stainless steel hydraulic tubing, compression fittings, and hose assemblies. The project design was provided by HDR Engineering, Inc. This effort is classified under NAICS code 237110 and is currently listed as a forecast. The project is exempt from CEQA requirements under several categorical exemptions, as the replacement of corroding piping with stainless steel is determined to have no significant environmental impact. Primary administrative contact for the project is Executive Director Peter Thompson. Performance will take place at 4748 Orcutt Rd, San Luis Obispo, CA 93401.

General Info

Contractor needed to replace corroded hydraulic piping in San Luis Obispo, California.

Agency

California → Central Coast Water Authority

Place of Performance

4748 Orcutt Rd, San Luis Obispo, CA ., San Luis Obispo, CA, 93401

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Coast Water Authority
Contacts1 person available
OfficeN/A
Organization / Agency
California → Central Coast Water Authority
Office AddressN/A
Contacts
Peter ThompsonExecutive Director

Full Description

Show more
The Central Coast Water Authority (CCWA) is a joint powers agency formed to construct, own, and operate certain facilities needed to treat, convey, and deliver State Water Project (SWP) water to its project participants - retail water providers and end users located within the County. The Energy Dissipating Vault includes two multi-jet sleeve valves which are used to control the rate of water flow in the Coastal Branch pipeline. A hydraulic system consisting of two hydraulic power units with connecting carbon steel piping and hose assemblies is used to actuate the valves. The existing carbon steel piping is corroding and needs to be replaced. CCWA utilized HOR Engineering, Inc. to design the Project which includes the demolishment of the existing carbon steel piping and hose assemblies and replacing it with new stainless steel hydraulic tube and compression fittings, and hose assemblies.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter, as well as 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include the installation of standard and doghouse manholes, interior drop assemblies, and the completion of the CSO regulator fit out and outfall. Site preparation tasks consist of clearing and grubbing over 5,100 square yards of wooded areas, seeding, fine grading, and select tree removal. Key project deliverables also include the implementation of a Stormwater Pollution Prevention Plan (SWPPP), geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes. Specialized requirements include the procurement of railroad insurance.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, identified as Project No. SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days following the Notice to Proceed. The contract is administered by the City of Belmont with Willis Engineers serving as the representative. Award will be granted to the responsible bidder submitting the lowest responsive bid, with specific evaluation criteria focusing on bidder qualifications, financial ability, and the submission of required Good Faith Efforts and Table A forms. The project mandates strict adherence to ANSI/AWWA and ASTM standards for materials and requires performance and payment bonds. Additionally, the contract establishes socioeconomic participation goals, including an EPA MBE goal of 10.9 percent and a combined State of North Carolina MBE/WBE goal of 10 percent. Payment is processed via Applications for Payment and becomes due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking qualified DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of open and covered concrete structures, relining or replacing steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additional technical requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, motor control center component replacement, and modifications to sluice and slide gates. The project also encompasses the installation of access platforms, rerouting sump pump discharge lines, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid for reimbursement. Requested services and supplies include lead abatement, rebar, metals fabrication, painting, trucking, concrete resurfacing, and FRP reinforcing systems. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 18 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS