Replacement of flexible concrete mat in Beauharnois, QC

Closed
30005909International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Fisheries and Oceans Canada is soliciting bids for a construction project to enhance safety at the Canadian Coast Guard buoy tending site in Beauharnois, Quebec. The project involves the removal of approximately 20 meters of an existing flexible concrete mat and its replacement with a reinforced concrete slab on grade. This new structure will be built upon a granular foundation separated from the natural soil by a geotextile layer, with all reinforcement and sloping adhering to specific project plans. The selected contractor is responsible for installing a cofferdam to drain the work area and must strictly follow all environmental requirements outlined in the project certificates of authorization. Additionally, the contractor is required to restore the site by revegetating any soil disturbed by machinery. This federal solicitation, identified by number 30005909, focuses on critical infrastructure upgrades to support hovercraft operations.

General Info

Construction of a reinforced concrete slab for Coast Guard buoy site in Beauharnois.

Agency

Government of Canada → Fisheries and Oceans Canada

Place of Performance

*Beauharnois *Quebec (except NCR), CAN

Set-Aside

NONE

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Fisheries and Oceans Canada
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Fisheries and Oceans Canada
Office AddressN/A

Full Description

Show more
CONSTRUCTION PROJECT SUMMARY The Canadian Coast Guard (hereinafter "CCG") uses a site in Beauharnois for its buoy tending operations. This site is equipped with a hovercraft ramp built in 2017. The existing ramp consists of a flexible concrete mat for the lower part of the ramp and a 200 mm-thick reinforced concrete slab-on-grade for the upper part of the ramp. The length of the articulated concrete mat section is around 30 meters, and that of the slab on grade is also around 30 meters. The width of the ramp is approximately 22 meters. For safety reasons related to CCG operations, the Ministry wishes to remove the existing flexible concrete mat over a length of approximately 20 meters and replace it with a reinforced concrete slab on grade. The new reinforced concrete slab on grade is to be supported on a granular foundation laid by the contractor and a geotextile will divide the natural soil from the granular cushion. The concrete slab must be reinforced in accordance with the plans and specifications and the slope of the structure must meet the requirements of the plans and specifications. The contractor must plan the installation of a cofferdam required to drain the work area and must comply with the environmental requirements of the certificates of authorization issued for this project. At the end of the work, the contractor must restore the site by covering with vegetation the soil disturbed by machine traffic.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS