Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

REPLACEMENT OF KWSC PIPELINE FROM KWSC VALVE PIT TOWARDS PRL 1000-RFT SECTION

Active
Doc342008664International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Pakistan Refinery Limited is seeking sources for the replacement of the KWSC pipeline from the KWSC valve pit towards the PRL 1000-RFT section. The scope of work involves comprehensive excavation and backfilling in various terrains, including concrete, soil, and rock, with a requirement for at least 25 manual test pits to identify underground utilities. Key technical specifications include backfilling compacted to 95% ASHTO dry density and the installation of heat or butt fusion joints in accordance with ASTM 2164. Additionally, the project requires the installation of an MS 16 inch diameter globe valve, which must be approved by the relevant PRL department prior to installation. The contractor is held to strict safety and quality standards, including the provision of hard barricades and safety signage every 50 feet, the use of steel scaffolding for shoring, and the installation of bores for dewatering. All machinery, cranes, and operators must be third-party certified. Evaluation of potential contractors will be based on company profile, corporate status, annual turnover, and proven experience within the oil and gas industry, including HSEQ competence and the availability of experienced staff and equipment. The final acceptance of the work is subject to the satisfaction of the Engineer or Client Representative following hydrotesting and a commissioning phase.

General Info

PRL seeks a certified contractor to replace the KWSC pipeline and install valves.

NAICS

N/A

Place of Performance

PAK

Set-Aside

NONE

Documents

3

BOQ - Replacement of KWSC Pipeline inside PRL

XLSX, High priority: read this firstspecifications
High

Questions for RFI Discovery

DOCX, High priority: read this firstrfi
High

SOW - Replacement of KWSC Pipeline inside PRL

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPakistan Refinery Limited
Contacts1 person available
OfficeN/A
Organization / AgencyPakistan Refinery Limited
Office AddressN/A

Full Description

Show more
REPLACEMENT OF KWSC PIPELINE FROM KWSC VALVE PIT TOWARDS PRL 1000-RFT SECTION

More opportunities from Pakistan Refinery Limited

Same awarding agency

NAICS: 541620
International
HSE SUPERVISORS REQUIRED FOR MAJOR REPAIR OF TANKS PROJECT AT PRL KORANGI AND KEAMARI
Solicitation # Doc341269564
Pakistan Refinery Limited is seeking a third-party inspection agency to provide qualified Health, Safety, and Environment (HSE) Supervisors for a major tank repair and erection project at its Kemari and Korangi facilities. The selected agency must provide one supervisor for each location, working a schedule of 10 hours per day, six days a week. Key responsibilities include conducting and logging gas tests every two hours, inspecting power tools and safety equipment, and coordinating with KPT representatives and the PRL HSEQ department to ensure all work adheres to KPT NOC regulations and PRL Permit to Work systems. To ensure continuous coverage, the agency is required to qualify one to two alternate supervisors. Qualified candidates must hold a bachelor's degree from an HEC recognized engineering university, possess NEBOSH and IOSH certifications, and have at least five years of experience in tank construction, repair, and inspection specifically within the oil and gas industry. The providing agency must demonstrate corporate stability through registration with local authorities including FBR, SRB, EOBI, and SESSI, and provide evidence of HSEQ policies and financial turnover. The agency is solely responsible for all logistics, including mobilization, demobilization, transport, food, medical care, insurance, security, and the provision of all necessary personal protective equipment.
Environmental Consulting Services

POSTED

7 days ago

DEADLINE

in about 1 hour
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS