This Solicitation opportunity from Government of Canada was posted on March 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Replacement of the waterwork and sewer system – Lot 4

Closed
ML000191_85639International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
PIDC Project 1 - Bldg. 3 plumbing, boiler, FA, painting and WWTP
Solicitation # 872281
Solicitation 872281, managed by the Bristol Alliance of Companies for U.S. Immigration and Customs Enforcement, covers a comprehensive series of infrastructure repairs and upgrades at the Port Isabel Detention Center in Los Fresnos, Texas. The project scope encompasses multiple critical systems, including the replacement of boilers across several buildings, the installation of a new fire alarm system in the dining facility, and extensive painting and surface repairs for 11 buildings. Additionally, the contract includes plumbing repairs for Multipurpose Building 3 and significant upgrades to the wastewater treatment plant infrastructure, specifically focusing on replacing worn valves, installing sewage grinders on the influent trough, and utilizing coastal weather resistant materials to ensure long term durability. The project is estimated to have a magnitude between 1.5 million and 2 million dollars and is issued as a task order to 8a MACC IDIQ offerors. Contractors are required to adhere to the TX20260236 wage determination for Cameron County and must comply with strict quality control, safety, and security requirements. The procurement process includes a mandatory site survey and a detailed pricing template broken down by CSI division. Key deadlines include a response deadline of September 10, 2026, with final proposals due by September 24, 2026.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 15 days
NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities, as well as the construction of flow control facility components and site improvements. Additional requirements encompass pavement removal and restoration, traffic control, utility coordination, disinfection, startup, and commissioning to ensure a complete and operational system. Garney Pacific, Inc. is soliciting quotes from subcontractors and suppliers for various trade scopes, including steel pipe welding, trenchless construction, electrical and instrumentation, and the supply of aggregates, ready-mix concrete, and steel pipes. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by September 18, 2026, at 2:00 PM PT. The project is open to various set-aside categories, including Small Business, Women-Owned Small Business, and HUBZone certified entities.
Garney Pacific, Inc.

POSTED

about 11 hours ago

DEADLINE

in 9 days
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids from MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the improvement of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of approximately 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and the treatment of approximately 1.7 acres of impervious surface within a 3.3-acre drainage area. Additional requirements include necessary drainage, underdrain, inlet, pipe, and downspout work, as well as limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor. Landscaping requirements specify the planting of six native trees and approximately 345 native plants or approved equivalents, concluding with final stabilization, cleanup, and restoration. This opportunity is open to various small business designations, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, who are encouraged to form consortiums if individual bid items are too large for a single entity to manage. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties must provide their company name and contact information along with a clear indication of their intent to bid. The primary point of contact for this solicitation is Jennifer Wilson, with administrative coordination handled by Jonah Leith.
Harbel, Inc.

POSTED

about 11 hours ago

DEADLINE

in 7 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as 54 and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, surface restoration, and the excavation of cobbles and large boulders. This solicitation is open to small businesses, including certified SDVOSB, MBE, and WBE firms, with a bid submission deadline of September 29, 2026. James W. Fowler Co. is providing support to M/W/DBE subcontractors regarding bonding, insurance, and material procurement, and encourages the use of apprentices for the project.
James W. Fowler Co.

POSTED

about 11 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The contract involves the replacement of the waterwork and sewer system at Lot 4, Montreal Garrison, Quebec, encompassing the supply of labor, materials, supervision, and equipment for the recapitalization of sanitary and storm sewer networks, waterworks, pavement, and the construction of an underground retention basin along with related infrastructure. The project has an estimated budget of approximately $23.1 million and requires substantial completion within 217 calendar days after contract award notification, with final completion expected within 30 days thereafter. A non-mandatory site visit is scheduled for April 9, 2026, at 11:00 a.m. local time at the project location, and bidders must register for this visit by email no later than noon on April 8, 2026. This solicitation is conducted in accordance with Canadian and international trade agreements, including the Canadian Free Trade Agreement (CFTA), the Canada-European Union Comprehensive Economic and Trade Agreement (CETA), and the World Trade Organization Agreement on Government Procurement (WTO-GPA). The resulting contract will require an Indigenous Benefits Plan to promote opportunities for Indigenous-owned and led businesses. Bidders must direct all inquiries solely to the designated contracting authority, Aniss Hayder, under penalty of disqualification. Additional allowances include a $40,000 provision for the purchase of electric vehicle charging stations and accessories. Contract and tender documents are available on MERX, with final awarding results accessible through the Defence Construction Canada website.

General Info

Replacement of waterwork and sewer system in Montreal, budget $23.1M, 217-day completion.

Agency

Government of Canada → Construction de Défense Canada - Siège social

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Construction de Défense Canada - Siège social
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Construction de Défense Canada - Siège social
Office AddressN/A
Contacts
Aniss HayderContracting Authority

Full Description

Show more
DEFENCE CONSTRUCTION CANADA (DCC) – Project No. ML000191_85639 – Replacement of the waterwork and sewer system – Lot 4, Montreal Garrison (QC) The work includes, but is not necessarily limited to, the supply of labour, material, supervision, and equipment required for the recapitalization of sanitary and storm sewer networks, waterworks, pavement, construction of an underground retention basin, as well as related works at the Montreal Garrison (QC). A site visit has been arranged for the following date, time, and location. It is highly recommended that bidders attend this visit. Date: April 9, 2026 Time: 11:00 a.m., local time Location: 6363 Notre-Dame Street East, Montreal, QC H1N 3V9 Bidders should email the DCC contact identified in this posting, no later than noon on April 8, 2026, to register for the non-mandatory site visit. The estimated cost for this opportunity is in the range of $23,100,000. The Work must reach Substantial Completion no later than 217 calendar days after notification of contract award and must be completed no later than 30 calendar days after the date of Substantial Completion. This solicitation is being conducted in accordance with the requirements set out in the Canadian Free Trade Agreement (CFTA), Chapter Nineteen of the Canada-European Union Comprehensive Economic and Trade Agreement (CETA) and the World Trade Organization Agreement on Government Procurement (WTO-GPA). The resulting Contract will include an Indigenous Benefits Plan (IBP) that aims to provide opportunities for businesses owned and lead by Indigenous People. Canada’s free trade agreements pose no impediment to the inclusion of measures for the benefit of Indigenous Peoples and/or businesses in a procurement. Refer to the Tender documents for details. Questions regarding this solicitation are to be directed ONLY to the point of contact identified in this advertisement. Bidders who address their questions to anyone other than the point of contact during the solicitation period may, for that reason alone, be disqualified. Please note that the preliminary tender results for this project will be available on MERX. Bidders can obtain contract award results from the DCC website at https://www.dcc-cdc.gc.ca/industry/contract-activity. DCC now publicly discloses information on payments made to prime contractors so that subcontractors know when they can expect payment. Information on payments made in the past 90 days on construction contracts over $100,000, as well as further information regarding DCC’s prompt payment commitment, can be obtained from the DCC website at https://www.dcc-cdc.gc.ca/industry/contract-activity. code : 1description : Montant du VPA (tel que défini dans les conditions supplémentaires), exprimé en dollars ($) IBP Amount (as defined in the Supplementary Conditions), expressed in dollars ($)unitOfMeasure : Dollarweight : 5.00code : 2description : Somme forfaitaire pour les travaux (y compris le montant du VPA indiqué au point 1) Lump-sum price for the Work (inclusive of the IBP Amount in item 1)unitOfMeasure : Lump-Sumweight : 95.00code : 3costAllowancePrice : 40000.00description : Allocation pour achat de borne de recharge pour véhicules électriques et accessoires (Référence rectificatif no.1 par.12) Allowance for electrical vehicle charging stations and accessories (reference Amendment no.1, art. 12)quantity : 1Bidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS