Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Colorado was posted on July 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Replacement of Various Roofs at Wastewater Reclamation Facility

Closed
25-049 (WWAN04)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
SLED
47971 CONSTRUCTION
Solicitation # 47971 - C
Solicitation 47971-C is a construction project issued by the New York State OGS Design and Construction for the replacement of the roof and associated mechanical systems at the Troop F Headquarters in Middletown, New York. The scope of work encompasses comprehensive architectural, electrical, and structural modifications, including the removal of specific skylights and roof framing, the application of various waterproof and general surface finishes, and abatement work related to the first-floor reflected ceiling plan. Electrical requirements include the installation of keyed systems, the relocation of equipment for HVAC engineers, and the installation of permanent conductive fiber optic cables. The contractor is responsible for providing all necessary tools, equipment, and materials, as well as procuring all permits required for the final certificate of occupancy. All work must adhere to applicable building codes, local safety and zone differential regulations, and manufacturer recommendations. Key deliverables include the final inspection of roof trusses, sheathing, tiles, gutters, downspouts, and storm drainage systems, with final acceptance of the fastening system requiring written approval from the Owner and Architect. The solicitation was posted on October 16, 2026, with a response deadline of November 18, 2026.
NYS OGS Design & Construction - Construction Contractors

POSTED

about 2 hours ago

DEADLINE

in 20 days
NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 3 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This contract involves the removal of existing roofing systems and the installation of new ballasted roofing on multiple structures within the Wastewater Reclamation Facility, including the administration building, shop building, secondary building, non-potable water building, and D.A.F. unit. The project must adhere to all relevant codes and standards of practice, ensuring compliance and quality in execution. The work is detailed in the provided plans and specifications, emphasizing a comprehensive approach to upgrading the facility’s roofing infrastructure. The project is solicited under the title "Replacement of Various Roofs at Wastewater Reclamation Facility" with a solicitation number 25-049 (WWAN04). It is scheduled for posting on July 23, 2025, with responses due by August 13, 2025. The contract value is estimated to range between $500,000 and $1,500,000. The work will be performed in Colorado, and the primary point of contact for inquiries is Teresa May Burns, reachable via email at [email hidden] or by phone at [phone hidden].

General Info

Place of Performance

CO, USA

Set-Aside

NONE

Documents

8

25-049 (WWAN04) Replacement of Various Roofs at Wastewater Reclamation Facility

PDF, High priority: read this firstifb
High

City of Pueblo Wastewater Facilities Roof Replacement - Section 07220 Roof Deck and Insulation

PDF, High priority: read this firstspecifications
High

City of Pueblo Wastewater Treatment Roof Replacement - Modified Bitumen

PDF, High priority: read this firstspecifications
High

City of Pueblo Wastewater Treatment Roof Replacement - Section 06 10 00 Rough Carpentry

PDF, High priority: read this firstspecifications
High

Pueblo Wastewater Treatment Facility Roof Replacement - Scope of Work

PDF, High priority: read this firstsow
High

Sample Contract Documents - City of Pueblo

PDF, High priority: read this firstcontract-document
High

VELUX CMT2 Curb Mount Traditional Double Dome Skylight Specifications

PDF, High priority: read this firstspecifications
High

Appendix B - Licensing and Sales Tax Information for Pueblo Construction Contractors

PDF, Low priorityspecial-notice
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → Wastewater
Contacts1 person available
OfficeN/A
Organization / AgencyColorado → Wastewater
Office AddressN/A
Contacts

Full Description

Show more
In general, this project will consist of the removal of existing roofing and replacement with new ballasted roofing for the Wastewater Department's administration building, shop building, secondary building, non-potable water building, and D.A.F., as detailed in the plans and specifications (ATTACHMENTS). Project will be in accordance with all applicable codes and standards of practice.

More opportunities from Colorado → Wastewater

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS