Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on April 21, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Information - JP-5 Piping Joint Replacement

Closed
N42158-20-WW01Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation is soliciting proposals for the complete repower of a 30 foot Munson landing craft. The selected contractor will be responsible for the decommissioning and removal of two existing Honda BF250A outboard engines and the procurement and installation of two new Honda BF250D Drive-by-Wire outboards. The scope of work is divided into six phases, encompassing structural transom inspections, the installation of Honda iST electronic control heads at dual helm stations, integration with the SeaStar Power Assist steering system, and a comprehensive fuel system overhaul using USCG Type A1-15 lines. The project concludes with NMEA 2000 network integration, digital gauge installation, and a minimum two hour sea trial to validate performance and safety protocols. To ensure factory warranty coverage, the contractor must maintain active Honda Marine Authorized Dealer or Service Center status. The vessel will be delivered via trailer to the contractor facility, which must provide a secure, fenced yard or indoor shop. Award evaluation is based on a weighted criteria of cost, technical expertise, and TERO status, with a preference for Colville Business Enterprises. Proposals must be submitted in PDF format by November 13, 2026. Final contracts are subject to tribal appropriation and may require a performance bond for values exceeding 100,000 dollars or a 25 percent retainage.
Confederated Tribes of the Colville Reservation

POSTED

about 4 hours ago

DEADLINE

in 24 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

Portsmouth, VA, 23709, USA

Set-Aside

NONE

Documents

1

Request+for+Information+-+JP5.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Norfolk Naval Shipyard Gf
Contacts1 person available
OfficePORTSMOUTH, VA, 23709-1001, USA
Office AddressPORTSMOUTH, VA, 23709-1001, USA

Full Description

Show more
Norfolk Naval Shipyard (NNSY), in support of the CVN-77 FY19 Docking Planned Incremental Availability, is seeking information on Contractor and Marketplace capacity and capability to replace JP-5 Piping Joints throughout various tanks and spaces aboard the USS George H.W. Bush. Thin walled (Schedule 10) CRES 316L pipe (ref. 1) has been used in JP-5 fuel systems (ref. 2) aboard certain Naval Vessels. The pipe joint design uses a belled end fitting creating an inherent crevice. The thinness of this piping may lead to poor weld quality at the welded joints which can cause additional crevices within the pipe joint. Crevices create areas for corrosion to form, eventually resulting in leakage across the pipe joint. Any potential Contractor shall provide all materials and services needed to repair identified JP-5 Joints aboard the USS George H.W. Bush (CVN 77). The general replacement process also includes the removal of the existing, damaged pipe and joint, as well as all other required pipe-fitting procedures to allow for the installation and welding of the replacement pipe and joint. Tool air, electric power, and water will be provided at the riser; Contractor will be responsible from the riser to the job site.

More opportunities from Department Of Defense → Norfolk Naval Shipyard Gf

Same awarding agency

NAICS: 562991
New
Federal
Rental of Restroom Trailers
Solicitation # N4215827C431BJF
The Norfolk Naval Shipyard (NNSY) is conducting market research through a Sources Sought and Request for Information (RFI) to identify capable vendors for the rental, installation, and continuous maintenance of temporary sanitary facilities at its waterfront operations in Portsmouth, Virginia. The requirement includes three non-ADA commercial restroom trailers featuring HVAC, freeze protection, and gender-divided stalls, two ADA-compliant portable toilets with adjacent dual-basin handwashing stations, and secondary spill containment systems capable of holding 110% of waste tank capacity. The target delivery and service start date is December 1, 2026, assuming a contract award by November 25, 2026. The selected contractor must provide all labor, towing vehicles, and equipment for delivery and relocation, as NNSY will not provide tow vehicles. Technical requirements specify that trailers must operate on a maximum of four 15 Amp/125 Volt power circuits and utilize NEMA L5-30 pigtail adapters. Service standards require daily pumping, cleaning, and restocking seven days a week, including holidays, with a strict four-hour emergency response time and an eight-hour resolution window for defects. All personnel must be U.S. citizens, fluent in English, and eligible for DBIDS credentials for unescorted access to the Controlled Industrial Area. The government reserves the right to reject non-conforming services under FAR 52.212-4(a), with penalties including prorated invoice deductions for non-conformance. Interested parties must submit a capability statement, schedule validation, and a Rough Order of Magnitude (ROM) cost estimate by October 21, 2026.
Septic Tank and Related Services

POSTED

5 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS