Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Request for Information/Market Intelligence Notice: Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Fort Hunter-Liggett Water System Improvements

Active
W912QR-PDB-FHLWATERFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Louisville District, is seeking market intelligence through a Request for Information for the restoration and modernization of potable water and wastewater collection systems at Fort Hunter Liggett. With an estimated acquisition magnitude of 70 to 80 million dollars, the project scope includes the design and construction of a new tank farm with at least 2 million gallons of storage, a new transmission main, upgrades to water supply wells, modernized SCADA infrastructure, and the rehabilitation of sanitary sewer lines and treatment plant lagoons. All work must adhere to NSPC, UFC, and NFPA criteria to address aging infrastructure and operational deficiencies. The government is evaluating a Progressive Design Build strategy utilizing an Other Transaction Agreement under 10 U.S.C. section 2808a. This proposed approach would involve a qualifications-based selection process consisting of a statement of qualifications and pitch meetings. The award would be structured in two phases: an initial design and pre-construction phase followed by a construction phase based on an agreed-upon Guaranteed Maximum Price. Interested parties under NAICS code 237110 must submit their company profiles, collaborative delivery experience, and technical feedback via the designated online survey form by November 3, 2026.

General Info

RFI for $70-80M water and wastewater system modernization at Fort Hunter Liggett.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Lockwood, CA, USA

Set-Aside

NONE

Documents

1

RFI - Fort Hunter Liggett Water Sanitary Improvements

PDF, Low priorityrfi
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Louisville
Contacts1 person available
OfficeLOUISVILLE, KY, 40202-2230, USA
Office AddressLOUISVILLE, KY, 40202-2230, USA

Full Description

Show more

REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE


This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should formal solicitation be issued in the future.


NAICS Code: 237110 – Water and Sewer Line and Related Structures Construction


(Note: While Other Transaction Authority is not subject to FAR-based small businesIntells regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.)


Small Business Size Standard: $45 Million


PROJECT OVERVIEW


The U.S. Army Corps of Engineers (USACE), Louisville District, has a requirement for the design and construction of a project to restore and modernize the potable water system and wastewater collection system throughout the Fort Hunter Liggett Installation. The scope of work consists of furnishing all necessary design services, equipment, materials, labor, construction management, supervision, quality control, and supplies to deliver a fully functional and modernized potable water and wastewater systems on the Installation.  


The Fort Hunter Liggett water distribution system dates back to the 1950’s with a few areas believed to be even older and includes a three (3) well configuration that has sufficient pumping capacity to serve current supply demands, however, the water transmission system is undersized to satisfy the demand of the system.


While the current water system storage may be sufficient for normal operation, it cannot sustain the system for more than one day in the event of a pump outage and/or fire flow event during maximum day conditions; therefore, additional system storage is necessary. A new Tank Farm with adequate storage capacity (estimated to be a minimum of 2 million gallons) to be determined and validated in accordance with NSPC, UFC, and NFPA criteria, should be in vicinity of security fence gate 10 (Lat: 35.997638° , Long: -121.224355°).


Currently the primary storage tank for the potable water system is on the opposite side of the cantonment from the wells and the transmission main and distribution are combined causing significant pressure variations far in excess of industry standard, causing accelerated deterioration of system components. 


Many pipelines, valves, and hydrants within the distribution system have currently exceeded their useful life expectancy and have failed or failing. High operating pressures place additional strain on this aging system, requiring operational improvements as well as rehabilitation/replacement of existing assets.


Modernizing SCADA components are necessary to increase efficiency and updated to cover any system revisions and future improvements. SCADA infrastructure improvements shall integrate into the existing SCADA infrastructure.


Fort Hunter Liggett’s wastewater collection system was installed around the same time as the water potable system. Due to the age of the system and deterioration, replacement and rehabilitation of sanitary sewer lines, manholes, and the waste treatment plant lagoon are needed to return the system to be fully functional and code compliant. The wastewater treatment plant relies on a series of lagoons to treat sewage. There are lagoons that have operational deficiencies and require the replacement of the impermeable liner. In addition, the lagoon currently lacks baffles, which are essential for directing the flow of wastewater in a way that maximizes treatment time and prevents "short circuiting".


Estimated Acquisition Magnitude: $70-$80M


PRIMARY ACQUISITION STRATEGY UNDER EVALUATION: Progressive Design Build (PDB) via Other Transaction Authority (OTA).


The Louisville District is evaluating a Progressive Design Build (PDB) strategy utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a. This authority authorizes transactions other than standard contracts to carry out facility repair and construction projects – including planning, design, engineering, piloting and execution – enabling early contractor involvement, commercial pricing transparency, and schedule and cost efficiencies.


Currently, the Government has advanced a conceptual design for the following potable water system features below. 


  • New transmission main to connect the existing well field to the main distribution system within the cantonment area.
  • New storage infrastructure as required to satisfy requirements for fire safety, emergency needs, and operational storage.

  • Upgrades to existing water supply wells to enhance water-supply reliability and redundancy.

A Technical Assessment Report of the condition of Fort Hunter Liggett’s utilities systems and modernization recommendations of the water and sanitary sewer systems was completed in June 2024. The onsite assessments used in developing the Technical Assessment Report were conducted November 28-December 7, 2023.


Therefore, the Government is utilizing this RFI to assess industry capability, interest, and the advantages of utilizing PDB utilizing an OT Agreement under the authority of 10 U.S.C. § 2808a.


The PDB Course of Action (10 U.S.C. § 2808a):


The evaluation process for selection of the most highly qualified design-builder would be qualifications based. A streamlined, two-step Qualifications-Based Selection would occur: Step 1: White Papers/Statement of Qualifications submission. Step 2: Down selected design builders would be invited to Pitch Meetings/Presentations. Most highly qualified firm following pitch meetings would be selected to enter into negotiations. 


The OT Award would be two phases:


Phase 1 (Design & Pre-Construction): The Government team will negotiate the price of Agreement Phase I – Design and Pre-Construction Services with the selected design-builder. work collaboratively to advance the design, conduct open-book cost estimating, and mitigate project risks.


Phase 2 (Construction): Upon reaching an agreed-upon level of design (e.g., 60% to 90%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise Phase 2 for construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the design and construct the facility via alternative methods


INFORMATION REQUESTED


Interested parties are requested to respond to the following questions to help shape the final acquisition strategy. Responses shall be made using the link or QR code in the attachment:


Company Profile:


Q1. Firm Name


Q2. Address


Q3. Point of Contact (Name, Title)


Q4. Phone Number


Q5. Email Address


Q6. Unique Entity ID


Q7. CAGE code


Q8. Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.)


Q9. Participating Role (Prime Contractor, Subcontractor, Design Firm, Other)


Other Transaction Authority (OTA) & Collaborative Delivery Experience:


Q10. OTA Experience: Describe your firm's previous experience (if any) executing projects utilizing OTA.


Q11. Collaborative Delivery Experience: Describe your experience executing Construction Management at Risk (CM@Risk), Progressive Design Build (PDB), Integrated Design and Construction (IDAC), Early Contractor Involvement (ECI) or other highly collaborative delivery methods.


Fort Hunter Liggett Waterline


Q12. Describe your experience/expertise with water and wastewater utility construction.


Q13. What are the greatest supply chain, scheduling, or technical risks you foresee on a project of this type at Fort Hunter Liggett, and how could the PDB delivery method help mitigate?


Feedback on the Acquisition Strategy & Alternatives:


Q14. What project characteristics make PDB particularly advantageous or disadvantageous for this requirement? 


Q15. Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not?


Q16. Are there alternative acquisition strategies, phasing approaches, or commercial practices the Government has not considered that would yield a better facility, faster delivery, or lower cost?


Q17. Differentiating Evaluation Criteria: To differentiate high-performing collaborative design builders from traditional low-bid general contractors, what evaluation criteria (e.g., past collaborative-delivery, technical approach, key personnel/superintendent experience, trade-partner/subcontractor open-book engagement strategy, or proposed General Conditions fees) should carry the greatest weight in the Government's evaluation?


Bonding Capability:


Q18. Project Bonding Capacity: Specify your maximum bonding (Single and Aggregate) as a Sole Prime Contractor and/or as a Joint Venture.


SUBMISSION INSTRUCTIONS


Submission Requirement: The only authorized transmission method of responses is via filling out the survey form. No other transmission method will be accepted. Please limit your capability statement to the space provided within the form. The Market Intelligence Response Form can be accessed at:


https://forms.osi.apps.mil/r/Lmjbdft8rU or via the QR Code provided in the attachment. 


Please submit your responses by 03 November 2026 at 1:00 PM Eastern Time.


The questionnaire is the Government's primary mechanism for obtaining detailed market intelligence and addresses industry capability, experience, technical capabilities, construction considerations, and recommended OTA and commercial practices.


The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of this project under 10 U.S.C. § 2808a.


Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates.


Note: Do not submit proprietary trade secrets, protected technologies, or classified information in your response.  All feedback received will be handled as public market research to shape the Government's final acquisition approach.


Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and transportation necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and SWPPP, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveying, traffic control, and preconstruction video. Norstar Plumbing and Engineering, Inc. is managing the subcontractor solicitation for this project, specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers. The solicitation is categorized under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website. Primary points of contact for this opportunity are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 3 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and adherence to bidding terms. Bidders must provide a bid bond, performance and payment bonds, and proof of insurance from companies with an A.M. Best rating of A-VII or better. Compliance with MWBE requirements, including the submission of a Good Faith Efforts Form and Table A, is mandatory for responsiveness. Contract administration is managed by Willis Engineers on behalf of the City of Belmont. Performance is subject to liquidated damages of 1,000 dollars per day for failure to meet substantial completion deadlines. Payment is processed monthly via applications for payment reviewed by the engineer.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of FRP reinforcing systems. Mechanical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the rehabilitation of reactor mixers and aerators. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the replacement of motor control center components, and improvements to electrical and instrumentation systems. Other key tasks include lead abatement, metals fabrication, painting, coatings, the installation of slide gates, rerouting sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses, as well as DBE, MBE, WBE, and SBE subcontractors. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, ahead of the project bid date on November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any exceptions to these terms must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 22 days
View Details

More opportunities from Department Of Defense → W072 Endist Louisville

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS